focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.275
Bid: 0.25
Ask: 0.30
Change: 0.00 (0.00%)
Spread: 0.05 (20.00%)
Open: 0.275
High: 0.275
Low: 0.275
Prev. Close: 0.275
ARK Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update

8 Sep 2011 07:00

RNS Number : 8303N
Connemara Mining Company plc
08 September 2011
 



 

Connemara Mining Company plc

 

("the Company")

 

  

New Zinc Discovery at Stonepark in Limerick

 

·; New zone of high grade mineralization intersected at Stonepark West; 1.7km southwest of the Stonepark North zone

·; Hole 86 intersects 2.5m at 4.16% zinc and 4.37% lead from 382.5m

·; Additional drilling at Stonepark North has extended the mineralization 250m to the North with hole 78 intersecting 1m @ 5.97% zinc and 0.24% lead from 339.8m

·; Step out drilling has also intersected hydrothermal breccias extending 2km Southwest of the new Stonepark West discovery

·; 25,000 metre drilling program for 2011 is ongoing with four drill rigs on site

 

The board of Connemara Mining Company Plc ("Connemara", AIM:CON) is pleased to present an exploration update on our zinc-lead discovery in Limerick. The programme is a joint venture between Connemara (25%) and Teck Ireland Ltd. ("Teck") (75%).

 

Hole 86, located 1.7km southwest of the Stonepark North zinc discovery, intersected high grade zinc and lead mineralisation of 2.5m of 4.16% zinc and 4.37% lead beginning at a depth of 382.5 metres (see Table 1 for results). We are calling this new discovery "Stonepark West". The mineralisation is hosted in a geological setting similar to that of Stonepark North.

 

In addition, hole 64, located 580 metres east of the new discovery, between Stonepark North and Stonepark West, has intersected 3.1m of 1.92% zinc and 0.56% lead at a depth of 273 metres with further zinc-lead mineralisation discovered at 288 metres. Drilling 1.5km to the west of the new discovery has also intersected hydrothermal breccias similar to those in Stonepark West. This drilling was targeted using the results of the soil geochemistry survey conducted in the area earlier in the year.

 

The Stonepark West discovery is significant in that it is likely to be a totally new zone of zinc-lead to add to that at Stonepark and Stonepark North. The similarity in the geology between Stonepark West and the Stonepark zones suggests that the area between them could contain additional zinc-lead zones while the mineralisation found 1.5km west of Stonepark West offers the potential for further extensions.

 

At Stonepark North, drilling has intersected 1m of 5.97% zinc and 0.24% lead in hole 78, 250m north of hole 74, which intersected 8.65m comprising 7.72% zinc and 2.19% lead from 220m. This mineralization forms part of the lower zone of zinc-lead and is at the same stratigraphic level as the mineralization at Stonepark some 1.7km away.

 

Table 1: Stonepark Drilling Highlights

Hole ID

From (m)

To (m)

Thickness1 (m)

zinc (%)

lead (%)

TC-2638-086

382.5

385

2.5

4.16

4.37

Including:

383.9

385

1.1

6.13

4.63

TC-2638-078

339.8

340.8

1

5.97

0.24

TC-2638-0742

220.00

228.65

8.65

7.72

2.19

Including:

TC-2638-0742

224.45

227.3

2.85

17.41

3.98

TC-2638-0642

273.00

276.10

3.10

1.92

0.56

TC-2638-0642

288.00

290.00

2.00

1.09

0.01

TC-2638-0712

260.30

262.00

1.70

3.01

0.09

1All drill holes are vertical (-90 degrees). 2Reported 25th May 2011.

 

John Teeling, Chairman, commented:

 

"These are very positive and significant results. The discovery at Stonepark West appears to be a new zone, typical of Irish zinc orebodies. That in itself is significant, but the results in other holes to the east (hole 64), between Stonepark North and Stonepark West, and 1.5km to the west also contain mineralisation. There is now evidence to indicate that more zones of zinc-lead will be discovered in what is becoming a large area of zinc-lead mineralisation. Step out drilling continues.

 

Meanwhile, at the earlier discovery in Stonepark North, drilling 250m to the north of the recently announced (May 25th) high grade discovery of over 9.90% combined zinc and lead over 8.65 metres found 6.2% combined zinc-lead at 339.8 metres. This is very significant as this discovery is at the same depth as the earlier Stonepark discoveries some 1.7km away from Stonepark North. This also strengthens the possibility of the Stonepark discovery stretching to Stonepark North at a greater depth and could result in there being two zones in the Stonepark North area.

 

The potential of the Monaster block of licences is growing. Every drill hole is extending the area of mineralisation. This is a very big system with potential open in most directions. We continue to use four rigs and will have drilled 25,000 metres by year end."

 

 

This announcement has been reviewed and approved by the Company's technical director Graham Reid (P.Geo) in his capacity as the Qualified Person for the purposes of the AIM Guidance Note for Mining, Oil & Gas Companies issued by the London Stock Exchange. Mr Reid is a Member of The Institute of Geologists of Ireland (IGI) and The Society of Exploration Geophysicists (SEG) and has over 30 years' experience in mineral and site investigation fields.

 

 

Enquiries:

 

Connemara Mining Company Plc

John Teeling, Chairman +353 (0)1 833 2833

Jim Finn, Financial Director

 

Westhouse Securities Limited

Richard Baty +44 (0)20 7601 6100

Tim Feather

 

College Hill

Nick Elwes +44 (0) 207 457 2020

 

www.connemaramining.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFMGGLKNFGMZM
Date   Source Headline
1st Oct 20077:45 amBUSARC New VTOC(R) 4.0 Modeling Toolset Speeds Creation of Fast Cycle-Accurate C++ and SystemC Models
28th Sep 20078:00 amBUSTotal Voting Rights
24th Sep 20077:02 amRNSAcquisition of Alarity
24th Sep 20077:00 amBUSARC Acquires Alarity Corporation; Establishes Multimedia Development Center in St. Petersburg, Russia
19th Sep 20077:01 amRNSInterim Results
18th Sep 20077:00 amBUSARC Releases New MetaWare(R) Development Toolkit Featuring Lower Power and Smaller Code Size
11th Sep 20077:03 amRNSAgreement with Intel
11th Sep 20077:00 amBUSARC Signs Licensing Agreement for Configurable Solutions For Next-Generation Computing Products
10th Sep 20077:45 amBUSARC and Cadence Offer New Low-Power Design Methodology for Demanding Mobile Applications
10th Sep 20077:45 amBUSARC Announces Ultra Low Power Technology ''Energy PRO'' That Lowers Core and Subsystem Power by Four Fold
6th Sep 20075:08 pmBUSHolding(s) in Company
31st Aug 20073:03 pmBUSTotal Voting Rights
22nd Aug 200711:12 amRNSAGM Statement
16th Aug 200712:03 pmRNSAIM Rule 26
13th Aug 20077:46 amBUSNew ARC(R) VRaptor(TM)-Based Video Subsystems Receive Strong Industry Support
13th Aug 20077:45 amBUSGagan Gupta is Senior Director of Product Marketing at ARC International. Gagan is responsible for product planning and definition of ARC's multimedia subsystems and configurable processors. (Photo: Business Wire)
9th Aug 20074:27 pmBUSHolding(s) in Company
9th Aug 20074:21 pmBUSHolding(s) in Company
9th Aug 20074:19 pmBUSHolding(s) in Company
7th Aug 20073:45 pmBUSHolding(s) in Company
7th Aug 20073:35 pmBUSHolding(s) in Company
1st Aug 20077:01 amRNSInterim Results
1st Aug 20077:00 amBUSARC International plc Announces Unaudited Preliminary Results For the Six Months Ended June 30, 2007
31st Jul 20077:00 amRNSAdmission to AIM
12th Jul 200710:08 amRNSNotice of Results
11th Jul 20079:00 amRNSSummary of Deals
11th Jul 20077:00 amBUSMedical Device Company CVRx Adopts Configurable ARC(R) Core For Implantable Blood Pressure Reduction Device
11th Jul 20077:00 amBUS11 North American Companies Adopt ARC's Low Power Configurable Solutions for a Wide Range of High-Volume Applications
10th Jul 20074:30 amBUSConfigCon(TM) Shanghai 2007 Excites China's SoC Developer Community With Messages on Creating Multimedia Solutions Using Configurable Subsystems and Processors
29th Jun 20075:44 pmBUSTotal Voting Rights
21st Jun 20077:01 amRNSAppointment of NED
21st Jun 20077:00 amBUSARC Introduces New Modeling and Simulation Products to Speed ''Time to Market'' of ARC-Based(TM) SoCs
21st Jun 20077:00 amBUSARC International Appoints Steven Gunders As Non Executive Director
15th Jun 20077:02 amRNSAcquisition
15th Jun 20077:00 amBUSARC Acquires Tenison to Speed Time to Market Of Customers' Complex SoC Designs; Establishes Cambridge Engineering Center
13th Jun 20074:57 pmBUSHolding(s) in Company
12th Jun 20074:02 pmBUSHolding(s) in Company
7th Jun 20074:36 pmBUSHolding(s) in Company
1st Jun 20079:55 amBUSTotal Voting Rights
21st May 20078:31 amBUSHolding(s) in Company
17th May 200712:50 pmBUSChange of Registerd Office
16th May 20074:58 pmBUSDirector/PDMR Shareholding
16th May 20078:00 amBUSMicrosoft and RealNetworks Led the Agenda at ConfigCon(TM) Taiwan 2007; Event Attracted Record Crowd
25th Apr 20078:00 amRNSAnalyst & Investor Conference
16th Apr 20077:00 amRNSContract Extension
16th Apr 20077:00 amBUSARC Building Advanced CPF-Enabled Flow to Lower Power Consumption of Its Configurable Subsystems and Cores
16th Apr 20077:00 amBUSBroadcom Standardizes on ARC's Configurable Technology for High Volume Multimedia Applications
11th Apr 20077:00 amBUSBlocklisting Interim Review
5th Apr 20074:40 pmBUSTotal Voting Rights
5th Apr 20074:39 pmBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.