Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.275
Bid: 0.25
Ask: 0.30
Change: 0.00 (0.00%)
Spread: 0.05 (20.00%)
Open: 0.275
High: 0.275
Low: 0.275
Prev. Close: 0.275
ARK Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

25 May 2011 07:00

RNS Number : 2157H
Connemara Mining Company plc
25 May 2011
 



25th May 2011

 

Connemara Mining Company plc

 

("Connemara" or the "Company")

 

Update on zinc discovery at Stonepark, Limerick, Ireland

 

 

·;

Hole 74 hits 8.65 metres at 7.72% zinc and 2.19% lead and extends the Stonepark North zone to the northeast

·;

Step out drilling 1km southwest of the Stonepark North zone hits low grade zinc-lead mineralization

·;

Six drill rigs on site drilling 25,000 metres in 2011

·;

Seismic reflection survey completed in April

·;

Geochemical soil survey completed in May

 

The board of Connemara Mining Company plc (AIM:CON) is pleased to present an update on exploration in the Limerick region. The programme is a joint venture between Connemara (25%) and Teck Ireland Ltd. ("Teck") (75%).

 

Drilling is ongoing in Limerick with six rigs on site. Hole 74 intersected a 8.65 metre zone grading 7.72% zinc and 2.19% lead at 220 metres depth including 2.85 metres at 17.41% zinc and 3.98% lead from 224.45 metres. Hole 74 was drilled to the northeast of hole 45 (see press release of April 23rd, 2010) which intersected 7.45 metres of 19.2% zinc and 8.5% lead. This latest hole extends the Stonepark North zone by approximately 120 metres to the northeast. Drilling to-date at Stonepark North has defined a flat-lying zone of zinc-lead mineralization at 200 to 250 metres depth, with a strike length of at least 800 metres in a north-south direction and around 100-150 metres wide. The zone is still open.

 

A number of other wide-spaced step-out drill holes have also intersected thick zones of hydrothermal black matrix breccia with low grade zinc-lead mineralization. These intersections, located up to 1 km to the southwest of hole 74, are significant as they show that the Stonepark North massive sulphide zone is part of a much larger hydrothermal ore-forming system. See Table 1 for assay results.

 

Table 1: Stonepark Drilling Highlights

Hole ID

From (m)

To (m)

Thickness1 (m)

Zinc (%)

Lead (%)

TC-2638-074

220.00

228.65

8.65

7.72

2.19

Including:

TC-2638-074

224.45

227.3

2.85

17.41

3.98

TC-2638-064

273.00

276.10

3.10

1.92

0.56

TC-2638-064

288.00

290.00

2.00

1.09

0.01

TC-2638-071

260.30

262.00

1.70

3.01

0.09

1All drill holes are vertical (-90 degrees).

 

Drill testing of new targets across the entire block of Monaster licences is ongoing with the aim of discovering new zones of sulphide mineralization. Targets are being defined using the newly acquired airborne gravity data combined with the results of the recent multi-element soil geochemistry program. Results from a recently completed seismic reflection survey will also be used to further define these targets and to refine the location of major faults that may control the system.

 

Encouraging results have come from an area 6km to the southwest of Stonepark North where drilling has intersected hydrothermal black matrix breccia with trace zinc mineralization. Drilling indicates that this mineralization is adjacent to a large and previously unrecognized fault. Further step-out drilling is planned.

 

John Teeling, Chairman, commented:

"The Connemara/Teck joint venture in Limerick continues to excite. The Stonepark North discovery is extended by another high grade result 120 metres to the northwest including 2.85 metres of over 20% combined zinc and lead. Interesting results have been found 1km away from Stonepark offering the possibility of a much bigger mineralized system. 6km to the southwest drilling has discovered low grade mineralization but more importantly has identified a previously unknown fault.

 

A wide array of modern sophisticated techniques are being employed to better target drill holes.

 

This year we will drill 25 kilometres on the Limerick licenses. Currently 6 rigs are working on the block. The discoveries are world class with huge potential but a lot more work needs to be done."

 

This announcement has been reviewed and approved by the Company's technical director Graham Reid (P.Geo) in his capacity as the Qualified Person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies issued by the London Stock Exchange. Mr Reid is a Member of The Institute of Geologists of Ireland (IGI) and The Society of Exploration Geophysicists (SEG) and has over 30 years' experience in mineral and site investigation fields.

 

Enquiries:

Connemara Mining Company Plc

John Teeling, Chairman

+353 (0)1 833 2833

Jim Finn, Financial Director

Smith & Williamson Corporate Finance Limited

Nick Reeve

+44 (0) 117 3762213

College Hill

Nick Elwes

+44 (0) 207 457 2020

Optiva Securities Ltd

Jason Robertson

+44 (0) 203 137 1906

Jeremy King

+44 (0) 203 137 1904

 

www.connemaramining.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFEEEEISFIL
Date   Source Headline
13th Oct 201712:16 pmRNSHolding(s) in Company
3rd Oct 20171:29 pmRNSHolding(s) in Company
26th Sep 20177:00 amRNSInterim Statement for the period ended 30 June 17
20th Sep 20179:42 amRNSFurther Drilling to Commence at Inishowen Project
13th Sep 20177:00 amRNSGroup Eleven Acquires Teck Stake in Stonepark
7th Sep 20179:54 amRNSHolding(s) in Company
6th Sep 20173:10 pmRNSHolding(s) in Company
4th Sep 20174:00 pmRNSHolding(s) in Company
15th Aug 20177:15 amRNSDirector/PDMR Shareholding
15th Aug 20177:00 amRNSPlacing
14th Aug 201712:14 pmRNSSenior Management Appointment
24th Jul 20171:37 pmRNSHighlights of Statements Made at the AGM
10th Jul 20179:18 amRNSHolding in Company
28th Jun 201710:09 amRNSHolding in Company
28th Jun 20177:00 amRNSFinal Results for the Year Ended 31 December 2016
13th Jun 20174:41 pmRNSHolding in Company
26th Apr 20177:00 amRNSFocus on Inishowen Gold Prospect
25th Apr 20172:49 pmRNSHolding(s) in Company
13th Apr 201710:07 amRNSHolding in Company
31st Mar 20177:00 amRNSFive New Lead/Zinc Properties in Irish Midlands
21st Mar 20173:50 pmRNSOptions Granted
8th Feb 20171:05 pmRNSExploration Update
24th Jan 20172:58 pmRNSRise in Volume and Price
24th Jan 201710:44 amRNSNew Technical Director joins the Board
23rd Jan 20174:44 pmRNSHolding(s) in Company
4th Nov 20167:00 amRNSOldcastle Drilling
29th Sep 20167:00 amRNSInterim Results
6th Sep 20167:00 amRNSNew Prospecting Licences in Cork
3rd Aug 20167:00 amRNSIntercepts 4.82m at 5.48g/t gold at Inishowen
28th Jul 201610:55 amRNSHighlights of the Chairman's Statement from AGM
27th Jul 20167:00 amRNSNew Gold System Identified in Inishowen Drilling
28th Jun 20168:55 amRNSFinal Results for the Year Ended 31 December 2015
31st May 201610:37 amRNSDrilling In Inishowen, Donegal
27th May 201612:19 pmRNSHolding(s) in Company
23rd May 20167:00 amRNSInishowen Second Phase Drill Programme Begins
13th May 20169:30 amRNSFundraising to Finance Donegal Gold Drilling
4th May 20165:38 pmRNSShareholder Notification
14th Apr 20167:00 amRNSDrilling, Inishowen Gold Licences
7th Apr 20167:00 amRNSGold Results, Inishowen Licences, Donegal
26th Feb 20167:00 amRNSDrilling for Gold in Inishowen
25th Feb 20167:00 amRNSResults of Two Exploration Holes
21st Dec 20157:00 amRNSUpdate on Oldcastle Drilling
11th Nov 20157:00 amRNSTrenching Results, Inishowen Gold Licences
16th Oct 20157:00 amRNSOldcastle Block Drilling
15th Sep 20157:00 amRNSInterim Statement for period ended 30 June 2015
10th Sep 201511:13 amRNSHolding(s) in Company
24th Aug 20157:00 amRNSInishowen Gold Licences Update
6th Jul 201511:30 amRNSResult of AGM
26th Jun 20157:00 amRNSInishowen Exploration Update
3rd Jun 20157:00 amRNSFinal Results for the Year Ended 31 December 2014

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.