Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArc Minerals Regulatory News (ARCM)

Share Price Information for Arc Minerals (ARCM)

Share Price is delayed by 15 minutes
Get Live Data
0.515    0.00 (0.00%)
Bid:
0.48
Ask:
0.55
Spread: 0.07 (14.583%)
Market Cap: £12.67m
ARCM Live PriceLast checked at - London Stock Exchange

Intraday Arc Minerals Share Chart

Trial Underground Mining Application Update

21 Feb 2014 07:00

RNS Number : 5930A
Ortac Resources Limited
21 February 2014
 



Ortac Resources Ltd / Epic: OTC / Market: AIM / Sector: Mining & Exploration 2014

21 February 2014

Ortac Resources Limited ('Ortac' or 'the Company')

 

 Trial Underground Mining Application Update

 

Ortac Resources Ltd, the AIM listed exploration and development company, is pleased to announce that, following on from the announcement dated 20 December 2013 connected with Ortac's trial underground mining application, on the 18 February 2014 the Slovak District Mining Bureau, Banska Bystrica, held a consultative meeting at Ortac's representative office in Kremnica.

The purpose of the meeting was for the District Mining Bureau to discuss the mining application with the local interested parties, civic associations and other stakeholders, so that it is in a position to satisfy itself and stakeholders that all concerns connected to the application have been heard and either have been or will be addressed. Following the meeting the District Mining Bureau will then be in a position to make a formal decision to issue or refuse a permit to mine.

In preparation for the trial underground mining of the Sturec deposit, channel samples have been taken from the proposed Phase 1 development area which focuses on the Schramen vein. These channel samples have returned high grade gold and silver intercepts of up to 78g/t Au and 72g/t Ag in a 1.5m long channel sample.

Sampling from cross-cut number 1, taken from the proposed Phase 1 mining area, has confirmed the presence of high grade gold and silver ore as predicted by Ortac's geological model and previous drilling results. Four channel samples were taken across the Schramen vein, two from each side of the Andrej Adit, with eleven samples in total assayed. The results for each channel sample are given in Table 1 below:

 

Andrej Adit Channel Sample Combined Results

Channel Location

Sampled Length (m)

Gold Grade (g/t Au)

Silver Grade (g/t Ag)

North Upper

1.5

78.43

72.37

North Lower

1.5

14.57

23.60

South Upper

1.5

1.51

13.53

South Lower

1.0

4.17

16.15

 

Detailed Results for each sample assayed are given in Table 2 below:

 

Table 2: Andrej Adit Length Weighted Channel Sample Assay Results

Channel Sample

Sample ID

Au

g/t

Ag

g/t

Length

m

Crosscut 1 - North Side Upper

AS01

185.50

135.00

0.50

AS02

33.20

40.60

0.50

AS03

16.60

41.50

0.50

Average

78.43

72.37

1.50

Crosscut 1 - North Side Lower

AS04

11.15

21.50

0.50

AS05

9.36

17.10

0.50

AS06

23.20

32.20

0.50

Average

14.57

23.60

1.50

Crosscut 1 - South Side Upper

AS07

0.98

10.30

0.50

AS08

0.89

7.80

0.50

AS09

2.65

22.50

0.50

Average

1.51

13.53

1.50

Crosscut 1 - South Side Lower

AS10

2.84

15.70

0.50

AS11

5.49

16.60

0.50

Average

4.17

16.15

1.00

 

Ortac's CEO Vassilios Carellas comments: "We are encouraged by the progress made so far, the leadership of the Slovak District Mining Bureau and the engagement with all interested parties, and we will be working closely with them to address any and all concerns that have arisen. Looking forward it is likely that a review by the Slovak Central Mining Bureau may occur, as indeed will calls arise for a judicial review of the process itself. These are to be expected and are part of a normal, healthy and transparent engagement process".

The technical information in this press release was compiled and prepared by Mr Owen Mihalop (MCSM, BSc (Hons), MSc, MIMMM, CEng), Technical Director, Ortac Resources Limited. By virtue of his education, membership of a recognised professional association and relevant work experience, Mr Mihalop is a Competent Person as defined by the JORC Code (2004). Mr Mihalop consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. 

 

**ENDS**

 

 

For further information please visit www.ortacresources.com or contact:

 

Vassilios Carellas Ortac Resources Ltd Tel: +44 (0) 20 7389 9050

Stewart Dickson Cantor Fitzgerald Europe Tel: +44 (0) 20 7894 7000

Catherine Leftley Cantor Fitzgerald Europe Tel: +44 (0) 20 7894 7000

Jeremy Stephenson Cantor Fitzgerald Europe Tel: +44 (0) 20 7894 7000

Jonathan Williams RFC Ambrian Limited Tel: +44 (0) 20 3440 6800

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKKDNFBKDBBB
Date   Source Headline
15th Jun 20227:00 amRNSMaiden Botswana Exploration Programme
12th May 202211:06 amRNSSecond Price Monitoring Extn
12th May 202211:00 amRNSPrice Monitoring Extension
12th May 20229:05 amRNSSecond Price Monitoring Extn
12th May 20229:00 amRNSPrice Monitoring Extension
12th May 20227:00 amRNSAgreement with Anglo American & Investor Webinar
29th Apr 20223:29 pmRNSCasa Transaction & Geophysics Update
14th Apr 20222:35 pmRNSBlock Listing Six-Monthly Return
31st Mar 20223:33 pmRNSGrant of Options
21st Mar 20221:56 pmRNSCasa Transaction Update
16th Mar 20227:00 amRNSLegal Settlement Update
24th Feb 20229:05 amRNSSecond Price Monitoring Extn
24th Feb 20229:00 amRNSPrice Monitoring Extension
23rd Feb 20225:26 pmRNSBlock Listing Six-Monthly Return
21st Feb 202211:47 amRNSInvestor Update Conference Call
18th Feb 20226:09 pmRNSSettlement of All Legal Cases
14th Feb 20223:23 pmRNSCasa Mining Transaction Update
1st Feb 20222:06 pmRNSSecond Price Monitoring Extn
1st Feb 20222:01 pmRNSPrice Monitoring Extension
1st Feb 20229:00 amRNSPrice Monitoring Extension
16th Dec 20211:01 pmRNSResult of Annual General Meeting
9th Dec 20215:50 pmRNSVirtual AGM Registration
25th Nov 20218:33 amRNSNotice of Virtual AGM
9th Nov 20217:00 amRNSEx-parte order set aside
4th Nov 20219:00 amRNSVirgo Project Acquisition
27th Oct 20213:07 pmRNSGrant of Options
25th Oct 202110:46 amRNSAssays confirm copper sulphide mineralisation
22nd Oct 20215:23 pmRNSInterim Results
13th Oct 20217:00 amRNSUpdate on media article
30th Sep 202111:11 amRNSAnnual Report – December 2020
22nd Sep 20217:00 amRNSDrilling Intersects Massive Copper Sulphides
17th Sep 202112:40 pmRNSBlock Listing Six-Monthly Return
3rd Sep 20215:06 pmRNSDelay in Publication of Interim Results
27th Aug 20217:00 amRNSBoard Appointment
23rd Aug 20217:00 amRNSBlock Listing Six-Monthly Return
19th Jul 20217:00 amRNSCommencement of drilling
9th Jul 20217:00 amRNSUpdate - Exclusivity Agreement with Anglo American
25th Jun 20217:00 amRNSAnnual Results Filing Extension and Update
7th May 20214:52 pmRNSOption Exercise
5th May 20218:30 amRNSCasa Mining Revised Transaction Terms
4th May 20217:00 amRNSMedia Article
29th Apr 20217:00 amRNSInvestor Conference Call
9th Apr 20217:00 amRNSCasa Mining Update
24th Mar 20214:41 pmRNSSecond Price Monitoring Extn
24th Mar 20214:35 pmRNSPrice Monitoring Extension
24th Mar 20218:53 amRNSResult of Placing
24th Mar 20217:00 amRNSProposed Placing and Acquisition
19th Mar 20217:00 amRNSBlock Listing Six-Monthly Return
16th Mar 20217:00 amRNSSurrender of Share Options
12th Mar 20213:15 pmRNSOption Exercise and TR1 Notification

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.