Positive Metallurgical Test Results Received for Marampa Tailings

 

African Minerals Limited (AIM:AMI), the mineral exploration company with significant interests in Sierra Leone, West Africa, is pleased to announce the receipt of positive metallurgical test results for tailings situated at the Marampa Iron Ore Project located in Sierra Leone (the "Marampa Project").

The Company holds a 65% interest and Cape Lambert Iron Ore Limited ("Cape Lambert") (ASX: CFE), the manager of the Marampa Project, holds a 35% interest in the Marampa Project.

The highlights of the test results are as follows:

 

 HIGHLIGHTS

Metallurgical test results have now been received for a bulk, composite sample of historical hematite tailings located at the Marampa Project;

A test regime comprising wet, high intensity magnetic separation for roughing and cleaning and reverse flotation cleaning of the middlings fraction produced a high-grade concentrate suitable for the manufacture of blast furnace feed pellets;

The hematite concentrate produced from the tailings graded 65% iron and 3.9% silica for a mass and iron recovery of 46% and 91.6% respectively; and

Air core drilling of the tailings commenced in late March 2009, and drill samples will be used to prepare a representative bulk tailings sample for follow-up bench scale metallurgical test work in Australia.

 

BACKGROUND

In January this year, Cape Lambert collected, through face and test pit sampling, a 370kg bulk tailings sample for metallurgical test work. This sample was despatched to independent, Australian metallurgical testing group, AMMTEC Limited, where a sighter test program has now been completed. The objective of the sighter test program was to assess a number of beneficiation options to enable the production of a hematite concentrate with greater than or equal to 65% Fe for, blast furnace or direct reduction, pellet production.

The metallurgical test regime comprised wet, high intensity magnetic separation for roughing and cleaning, and reverse flotation cleaning of the middlings fraction produced a high-grade concentrate suitable for the manufacture of blast furnace feed pellets or sinter (Table 1). Importantly, the high-grade concentrate was produced with a mass recovery of 46.2% and a high iron recovery of 91.6%. It is expected that further cleaning of the concentrate will enhance its quality, with a small reduction in mass and iron recovery, thereby enabling it to be utilised for direct reduction pellet production.

Table 1: Summary Metallurgical Test Results - Marampa Project Tailings

Item

Mass

(%)

Fe Recovery

(%)

Fe Grade

(%)

SiO2 Grade

(%)

Al2O3 Grade

(%)

P Grade

(%)

S Grade

(%)

Feed

100.0

100.0

32.8

45.3

4.2

0.021

0.007

Concentrate

46.2

91.6

65.0

3.9

1.5

0.019

0.001

Tail

53.8

8.4

5.1

81.4

6.2

0.025

0.006

AIR CORE DRILLING

Shallow, air core drilling of the hematite tailings situated at the Marampa Project commenced in late March 2009. The objective of the drilling program is to enable a JORC compliant resource estimate to be completed for the tailings, and to provide representative samples to prepare a bulk tailings sample for follow-up bench scale metallurgical test work in Australia

MARAMPA INVESTMENT SUMMARY

On 1 October 2008, the Company formalised an agreement with Cape Lambert under which the latter made a 30% investment in the Marampa Project. Under the terms of the investment, Cape Lambert paid an initial scrip consideration of 44 million fully paid ordinary shares, committed to sole fund US$25 million towards a feasibility study, and assumed management of the Marampa Project. Cape Lambert may terminate its investment in the Marampa Project subject to achieving a minimum expenditure of US$5 million toward a feasibility study. On 22 January 2009Cape Lambert increased its investment in the Marampa Project to 35% with payment of a further scrip consideration of 17 million shares.

Cape Lambert's near term work plan for the Marampa Project is to evaluate the development of a tailings retreatment operation, and to explore the extensions to the hematite mineralisation and regional targets

The Marampa Project has reduced barriers to entry compared to a "Greenfields" project through its connection by an 84km railway to an existing deep water port, stockpiling and ship loading facility located at Pepel ("Rail and Port Infrastructure"). Pursuant to its investment, Cape Lambert has a right of access to the Rail and Port Infrastructure, which is currently leased from the government of Sierra Leone by African Minerals.

Enquiries: 

African Minerals Limited

Tel: +44 (0) 1481 726833

Frank Timis

Alan Watling

 

 

 

Canaccord Adams Limited

Tel: +44 (0) 20 7050 6500

Mike Jones

 

 

 

Mirabaud Securities Limited

Tel: +44 (0) 20 7878 3360

Rory Scott

 

 

 

Citigate Dewe Rogerson

Tel: +44 (0) 20 7638 9571

Martin Jackson

 

George Cazenove

Test Work Summary:

The "as received" tailings sample (P80=562µm) was screened at 710µm and the +710µm fraction (approximately 14.8% of the mass) set aside. This was done to protect the laboratory scale magnetic separation equipment; in future tests this material will be added to the middlings fraction prior to size reduction. The -710µm material was first processed using wet, high intensity magnetic separation ("WHIMS") to produce a rougher concentrate and then the rougher concentrate was cleaned using WHIMS. The middlings fraction representing only 12% of the feed was reduced to a P80=106µm prior to reverse flotation cleaning. The WHIMS and reverse flotation concentrates were then combined to form a final concentrate.

Competent Persons Attribute:

The metallurgical information in this report is based on information compiled by GV Ariti who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Ariti has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Ariti has reviewed the contents of this announcement and consents to the inclusion in this report of the matters based on his information in the form and the context in which it appears.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIFMMTMMBBBJL
Date   Source Headline
2nd Apr 20154:59 pmRNSAppointment of Joint Administrators
26th Mar 20154:10 pmRNSAppointment of Administrators
17th Mar 20154:28 pmRNSDirectorate Change
6th Mar 20154:07 pmRNSAdministrators appointment and Nomad resignation
3rd Mar 201511:25 amRNSEnforcement of security by PXF Facility Lenders
27th Feb 20154:51 pmRNSTransfer of PXF and Sierra Leone legal proceedings
16th Feb 20157:02 amRNSDirectorate Change
10th Feb 20157:00 amRNSFinancing Update
2nd Feb 20157:00 amRNSFinancing Update
12th Jan 201511:04 amRNSFinancing Update
29th Dec 20148:06 amRNSResignation of director
12th Dec 201412:23 pmRNSTemporary Marampa Access Agreement and Loan
1st Dec 201411:16 amRNSFinancing and Operations Update
20th Nov 20145:36 pmRNSFinancing Update
20th Nov 20147:59 amRNSSuspension - African Minerals Limited
12th Nov 20144:40 pmRNSSecond Price Monitoring Extn
12th Nov 20144:35 pmRNSPrice Monitoring Extension
12th Nov 20144:04 pmRNSFinancing Update
3rd Nov 20147:00 amRNSCorporate Update
3rd Oct 20148:47 amRNSLitigation Update
30th Sep 201411:25 amRNSInterim Results 2014
29th Sep 20141:34 pmRNSHolding(s) in Company
19th Sep 20147:03 amRNSTonkolili Iron Ore Project funding and operational
11th Sep 20147:00 amRNSNotice of Results
22nd Aug 20141:27 pmRNSChange of Directors
15th Aug 20145:02 pmRNSFunding Update and Management Change
13th Aug 20144:11 pmRNSResult of AGM
13th Aug 20147:00 amRNSHolding(s) in Company
13th Aug 20147:00 amRNSHolding(s) in Company
6th Aug 20147:00 amRNSMarket Update
16th Jul 20147:00 amRNSDirectorate Change
3rd Jul 20147:00 amRNSQ2 2014 and H1 2014 Export Tonnage
3rd Jul 20147:00 amRNSPhase 2 Concentrator Engineering Study Results
2nd Jul 20145:53 pmRNSPosting of 2013 Annual Report
30th Jun 20142:56 pmRNSAnnual Report for the year ended 31 December 2013
27th Jun 20143:02 pmRNSLitigation Outcome and Annual Report posting delay
26th Jun 20147:00 amRNSDe-sliming DSO Fines for enhanced product quality
5th Jun 20147:00 amRNSMedia Reports
21st May 20147:00 amRNSRecord Production and Sales for AML in Q1 2014
13th May 20147:00 amRNSIncrease in DSO Resource
21st Mar 20147:00 amRNSNotice of Results
18th Mar 20148:54 amRNSHolding(s) in Company
17th Feb 20147:00 amRNSAusenco appointed Tonkolili Phase II FEED Engineer
3rd Feb 20147:00 amRNSAdditional Listing on Options and Shares Vesting
31st Jan 20145:10 pmRNSDirector Share Dealings and Share Options
27th Jan 20147:00 amRNSQ4 and FY 2013 Production Report
22nd Jan 20142:56 pmRNSHolding(s) in Company
16th Jan 20147:00 amRNSAdditional Listing on Exercise of Share Options
10th Jan 20147:00 amRNSFY 2013 Production Update
20th Dec 20134:58 pmRNSRelated Party Transactions

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.