Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMI.L Regulatory News (AMI)

  • There is currently no data for AMI

Marampa Test Results

16 Apr 2009 11:15

RNS Number : 6762Q
African Minerals Ltd
16 April 2009
 



16 April 2009

For immediate release

African Minerals Limited

("African Minerals" or "the Company")

 

Positive Metallurgical Test Results Received for Marampa Tailings

 

African Minerals Limited (AIM:AMI), the mineral exploration company with significant interests in Sierra Leone, West Africa, is pleased to announce the receipt of positive metallurgical test results for tailings situated at the Marampa Iron Ore Project located in Sierra Leone (the "Marampa Project").

The Company holds a 65% interest and Cape Lambert Iron Ore Limited ("Cape Lambert") (ASX: CFE), the manager of the Marampa Project, holds a 35% interest in the Marampa Project.

The highlights of the test results are as follows:

 

 HIGHLIGHTS

Metallurgical test results have now been received for a bulk, composite sample of historical hematite tailings located at the Marampa Project;

A test regime comprising wet, high intensity magnetic separation for roughing and cleaning and reverse flotation cleaning of the middlings fraction produced a high-grade concentrate suitable for the manufacture of blast furnace feed pellets;

The hematite concentrate produced from the tailings graded 65% iron and 3.9% silica for a mass and iron recovery of 46% and 91.6% respectively; and

Air core drilling of the tailings commenced in late March 2009, and drill samples will be used to prepare a representative bulk tailings sample for follow-up bench scale metallurgical test work in Australia.

 

BACKGROUND

In January this year, Cape Lambert collected, through face and test pit sampling, a 370kg bulk tailings sample for metallurgical test work. This sample was despatched to independent, Australian metallurgical testing group, AMMTEC Limited, where a sighter test program has now been completed. The objective of the sighter test program was to assess a number of beneficiation options to enable the production of a hematite concentrate with greater than or equal to 65% Fe for, blast furnace or direct reduction, pellet production.

The metallurgical test regime comprised wet, high intensity magnetic separation for roughing and cleaning, and reverse flotation cleaning of the middlings fraction produced a high-grade concentrate suitable for the manufacture of blast furnace feed pellets or sinter (Table 1). Importantly, the high-grade concentrate was produced with a mass recovery of 46.2% and a high iron recovery of 91.6%. It is expected that further cleaning of the concentrate will enhance its quality, with a small reduction in mass and iron recovery, thereby enabling it to be utilised for direct reduction pellet production.

Table 1: Summary Metallurgical Test Results - Marampa Project Tailings

Item

Mass

(%)

Fe Recovery

(%)

Fe Grade

(%)

SiO2 Grade

(%)

Al2O3 Grade

(%)

P Grade

(%)

S Grade

(%)

Feed

100.0

100.0

32.8

45.3

4.2

0.021

0.007

Concentrate

46.2

91.6

65.0

3.9

1.5

0.019

0.001

Tail

53.8

8.4

5.1

81.4

6.2

0.025

0.006

AIR CORE DRILLING

Shallow, air core drilling of the hematite tailings situated at the Marampa Project commenced in late March 2009. The objective of the drilling program is to enable a JORC compliant resource estimate to be completed for the tailings, and to provide representative samples to prepare a bulk tailings sample for follow-up bench scale metallurgical test work in Australia

MARAMPA INVESTMENT SUMMARY

On 1 October 2008, the Company formalised an agreement with Cape Lambert under which the latter made a 30% investment in the Marampa Project. Under the terms of the investment, Cape Lambert paid an initial scrip consideration of 44 million fully paid ordinary shares, committed to sole fund US$25 million towards a feasibility study, and assumed management of the Marampa Project. Cape Lambert may terminate its investment in the Marampa Project subject to achieving a minimum expenditure of US$5 million toward a feasibility study. On 22 January 2009Cape Lambert increased its investment in the Marampa Project to 35% with payment of a further scrip consideration of 17 million shares.

Cape Lambert's near term work plan for the Marampa Project is to evaluate the development of a tailings retreatment operation, and to explore the extensions to the hematite mineralisation and regional targets

The Marampa Project has reduced barriers to entry compared to a "Greenfields" project through its connection by an 84km railway to an existing deep water port, stockpiling and ship loading facility located at Pepel ("Rail and Port Infrastructure"). Pursuant to its investment, Cape Lambert has a right of access to the Rail and Port Infrastructure, which is currently leased from the government of Sierra Leone by African Minerals.

Enquiries: 

African Minerals Limited

Tel: +44 (0) 1481 726833

Frank Timis

Alan Watling

 

 

 

Canaccord Adams Limited

Tel: +44 (0) 20 7050 6500

Mike Jones

 

 

 

Mirabaud Securities Limited

Tel: +44 (0) 20 7878 3360

Rory Scott

 

 

 

Citigate Dewe Rogerson

Tel: +44 (0) 20 7638 9571

Martin Jackson

 

George Cazenove

Test Work Summary:

The "as received" tailings sample (P80=562µm) was screened at 710µm and the +710µm fraction (approximately 14.8% of the mass) set aside. This was done to protect the laboratory scale magnetic separation equipment; in future tests this material will be added to the middlings fraction prior to size reduction. The -710µm material was first processed using wet, high intensity magnetic separation ("WHIMS") to produce a rougher concentrate and then the rougher concentrate was cleaned using WHIMS. The middlings fraction representing only 12% of the feed was reduced to a P80=106µm prior to reverse flotation cleaning. The WHIMS and reverse flotation concentrates were then combined to form a final concentrate.

Competent Persons Attribute:

The metallurgical information in this report is based on information compiled by GV Ariti who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Ariti has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Ariti has reviewed the contents of this announcement and consents to the inclusion in this report of the matters based on his information in the form and the context in which it appears.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIFMMTMMBBBJL
Date   Source Headline
16th May 20127:00 amRNSCRM subscribes to Convertible Bond
14th May 20122:01 pmRNSAdditional Listing on Exercise of Share Options
2nd May 20124:12 pmRNSAdditional Listing on Exercise of Share Options
1st May 20127:00 amRNSDirectorate Change
11th Apr 20127:00 amRNSPreliminary Results
2nd Apr 20121:11 pmRNSReceipt of SISG funds and Secured Loan repayment
30th Mar 201212:33 pmRNSAML and SISG complete $1.5Bn investment
24th Feb 20127:00 amRNSAdditional Listing on Exercise of Share Options
16th Feb 20126:01 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
14th Feb 20125:47 pmRNSAdditional Listing on Exercise of Share Options
13th Feb 20127:00 amRNSShandong due to complete, $868m financing closed
9th Feb 20127:00 amRNSDrawdown of $417.7m Standard Bank Facility
31st Jan 20128:13 amRNSSuccessful Arrangement of $868m Financing Package
31st Jan 20127:00 amRNSOffering Of Up To $350 Million Convertible Bonds
27th Jan 20126:12 pmRNSFinancing arrangements for Phase 1 expansion
15th Dec 201111:57 amRNSUpdate on Shandong, Commissioning & Marketing
5th Dec 20118:59 amRNSTR-1: Notifications of Major Interests in Shares
15th Nov 20117:18 amRNSAdditional Listing on Exercise of Share Options
4th Nov 20117:00 amRNSLoading of First Tonkolili Iron Ore Shipment
31st Oct 20112:11 pmRNSTR-1 (UK) Notification of Major Interests in Share
25th Oct 20113:05 pmRNSAdditional Listing on Exercise of Share Options
19th Oct 20111:34 pmRNSAdditional Listing on Exercise of Share Options
5th Oct 20119:08 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
5th Oct 20119:08 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
30th Sep 20113:14 pmRNSDirector/PDMR Shareholding
30th Sep 20117:00 amRNSInterim Results
9th Sep 20112:54 pmRNSRESOLUTIONS PASSED AT 9 Sept 2011 AGM
18th Aug 20117:00 amRNSArrangement of c$90m equipment financing & update
15th Aug 20117:00 amRNSNotice of AGM
1st Aug 20117:00 amRNSAML Executes Agreements with SISG to Invest $1.5bn
29th Jul 20113:36 pmRNSAdditional Listing
28th Jul 201110:01 amRNSChange of Adviser
19th Jul 20111:36 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
19th Jul 20111:35 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
12th Jul 20118:35 amRNSDirectorate Change
30th Jun 20117:00 amRNS2010 Annual Report & Accounts Posted
27th Jun 20119:12 amRNSAdditional Listing on Exercise of Share Options
1st Jun 20117:26 amRNSUpdate on Negotiations with Shandong Iron & Steel
31st May 20112:08 pmPRNFinal Results
24th May 201111:00 amRNSMemorandum of Understanding with CCCC
19th May 20117:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
6th May 20117:26 amRNSAdditional Listing
3rd May 201111:53 amRNSRevised MoU for $1.5bn SISG Investment
27th Apr 201112:06 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
21st Apr 20113:35 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
14th Apr 20117:00 amRNSAdditional Listing on Exercise of Share Warrants
12th Apr 20117:00 amRNSAppointment of Independent Non-Executive Directors
12th Apr 20117:00 amRNSPreliminary Results for the year ended 31/12/2010
8th Apr 20112:56 pmRNSAdditional Listing on Exercise of Share Options
22nd Mar 20117:00 amRNSAdditional Listing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.