If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Sierra Leone update

14 Oct 2005 07:00

Cluff Gold PLC14 October 2005 14 October 2005 AIM: CLF CLUFF GOLD PLC Completion of Drill Programme at Baomahun Gold Prospect, Sierra Leone Cluff Gold Plc ("Cluff Gold" or "the Company") today announces the completion ofits first drilling programme at the Baomahun Gold Prospect ("Baomahun") inSierra Leone. Highlights: • 27 drillholes were completed for a total of 4600m over less than a quarter strike extent of the 3.4 kilometre gold anomaly corridor • Significant high gold values in drill hole intersections • Assay results confirm mineralisation remains open in all directions from the Central and Western Zones • Completion of a ground geophysical survey has identified anomalies interpreted to be buried sulphide mineralisation, coincident with other gold findings to date • Resource update currently being undertaken by SRK Consultants The drilling programme concentrated on three sub-parallel structures, theEastern, Central and Western Zones, which have been explored and trial mined inthe past. The combined strike extent of these structures covered by the recentdrilling constitutes less than 25% of the 3.4km known gold anomaly on theprospect. The programme completed 27 inclined holes for a total of 4600 metres. The holeswere programmed to confirm previous exploration drilling results and determineadditional possible strike extensions to known mineralisation. Ten, seven andten holes were completed on the Eastern, Central and Western Zones respectively. Assay results from the Eastern Zone were published on 22 June 2005. The company has received assay results from the other two zones and below is atable of some of the significant intersections. Hole ID Dip (degrees) Intercept From (m) DDH11 45 5m@0.90g/t 13 DDH12 45 4m@6.47g/t 144 Includes 1m@13.76g/t DDH13 45 9m@4.11g/t 139 and and 166.5 4m@4.97g/t DDH16 45 5m@1.12g/t 42 DDH17 45 7m@2.5g/t 76 Includes 1m@10.48g/t DDH21 45 22m@3.34g/t 101.3 DDH22 45 DDH23 45 8.6m@2.17g/t 140 Includes 1m@11.4g/t DDH25 45 32m@3.76g/t 162 Includes 13m@6.37g/t DDH26 45 14m@1.88g/t 60 DDH27 45 7.4m@2.66g/t and 109.6 and 131.3 18.10m@3.05g/t Includes 5.3m@8.37g/t The mineralisation remains open in all directions on both structures. TheCompany has currently expended over US$1m on the prospective Baomahun projectand will make a further announcement soon, upon the completion of the resourceupdate which is currently being undertaken by SRK Consultants. In addition, the Company has completed a ground geophysical survey of 12 linekilometres over a strike length of 2.4 kilometres using three different methods:SP (SELF Potential), VLF (Very Low Frequency) and magnetics. The identifiedanomalies, interpreted to be buried sulphide mineralisation, are coincident withboth the gold in soil anomalies and the high gold values in drill holeintersections. Geological core logging has shown that high gold mineralisationis associated with sulphide mineralisation, mostly pyrrhotite. Douglas Chikohora, Technical Director of Cluff Gold plc, comments, '"We arepleased with the assay results which have served to confirm the historical drilldata and extended strike and down dip extensions of the mineralised structureson the prospect. In particular, holes 25 and 27 demonstrate that the Centraland Western Zones are both wider and higher grade further to the north and atdepth. The results from the ground geophysics programme will be used togenerate additional drill targets along strike of the Eastern, Central andWestern Zones in the previously established 3.4 kilometre gold anomaly corridor. We believe, from recent airborne geophysical survey work, that the geology inthis corridor is similar to the areas recently tested by the drilling and areindicative of a large mineralised system.'' About Baomahun: Baomahun is located about 180 km east of the capital, Freetown, in the SouthernProvince of the country and the geological setting is similar to the LakeVictoria goldfields in Tanzania. Cluff has a right to earn a 60% interest inBaomahun by funding the project to the completion of a bankable feasibilitystudy or to a maximum of US$5 million. This right is to be acquired fromWinston Mines which owns the two exploration licences relating to Baomahun,covering an area of approximately 137 km(2). For further information, please contact: Cluff Gold Numis Securities Parkgreen CommunicationsJ.G. Cluff / Douglas Chikohora John Harrison Cathy Malins / Annabel LeatherChairman / Technical Director Tel: 020 7776 1500 Tel: 020 7493 3713Tel: 020 7340 9790 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th Feb 20087:00 amRNSTotal Voting Rights
28th Feb 20084:59 pmRNSHolding(s) in Company
27th Feb 20086:10 pmRNSIncrease in Baomahun Stake
27th Feb 20089:00 amRNSCompletion of Placing
14th Feb 200810:28 amRNSPlacing and Notice of EGM
13th Feb 20081:58 pmRNSExercise of Options
31st Jan 200810:34 amRNSBaomahun Update
24th Jan 20081:11 pmRNSOperational Update
8th Jan 200812:43 pmRNSDirectorate Change
31st Dec 20077:30 amRNSTotal Voting Rights
4th Dec 20075:17 pmRNSDirector/PDMR Shareholding
30th Nov 20072:21 pmRNSTotal Voting Rights
19th Nov 20077:01 amRNSOperational Update
26th Oct 20077:01 amRNSExercise of Options
12th Oct 20079:37 amRNSDirector/PDMR Shareholding
26th Sep 20077:01 amRNSDirector/PDMR Shareholding
24th Sep 20077:03 amRNSInterim Results
13th Sep 20074:45 pmRNSDirectorate Change
13th Sep 20074:39 pmRNSAppointment of Joint Broker
3rd Sep 20077:01 amRNSBaomahun Scoping Study
26th Jul 20072:11 pmRNSAIM Rule 26
17th May 20071:08 pmRNSResult of AGM
17th May 20077:01 amRNSAGM Statement
18th Apr 20077:00 amRNSUpdate at Baomahun
17th Apr 20079:59 amRNSHolding(s) in Company
5th Apr 20077:43 amRNSDirector/PDMR Shareholding
30th Mar 20072:21 pmRNSHolding(s) in Company
30th Mar 20071:02 pmRNSTotal Voting Rights-Replacemt
30th Mar 20078:49 amRNSFinal Results
30th Mar 20077:00 amRNSTotal Voting Rights
27th Mar 20079:55 amRNSUpdate at Baomahun Project
22nd Mar 20074:17 pmRNSHolding(s) in Company
21st Mar 20074:12 pmRNSHolding(s) in Company
16th Mar 200710:38 amRNSResult of EGM
14th Mar 20073:19 pmRNSIssue of Equity
28th Feb 20077:00 amRNSTotal Voting Rights
21st Feb 20073:50 pmRNSPlacing and Notice of EGM
30th Jan 20074:31 pmRNSIssue of Shares
18th Jan 20072:00 pmRNSTotal Voting Rights
12th Jan 200712:17 pmRNSPurchase of Royalty
11th Jan 20077:01 amRNSBaomahun Drilling Update
2nd Jan 20077:01 amRNSDirectorate Change
21st Dec 200611:49 amRNSExercise of Options
21st Dec 20069:23 amRNSTotal Voting Rights
20th Dec 20067:01 amRNSAngovia Resource Update
4th Dec 20061:55 pmRNSHolding(s) in Company
9th Nov 20065:10 pmRNSHolding(s) in Company
25th Oct 20067:01 amRNSExercise of Options
24th Oct 20067:01 amRNSProject Development Decisions
9th Oct 20068:52 amRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.