Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Sierra Leone update

14 Oct 2005 07:00

Cluff Gold PLC14 October 2005 14 October 2005 AIM: CLF CLUFF GOLD PLC Completion of Drill Programme at Baomahun Gold Prospect, Sierra Leone Cluff Gold Plc ("Cluff Gold" or "the Company") today announces the completion ofits first drilling programme at the Baomahun Gold Prospect ("Baomahun") inSierra Leone. Highlights: • 27 drillholes were completed for a total of 4600m over less than a quarter strike extent of the 3.4 kilometre gold anomaly corridor • Significant high gold values in drill hole intersections • Assay results confirm mineralisation remains open in all directions from the Central and Western Zones • Completion of a ground geophysical survey has identified anomalies interpreted to be buried sulphide mineralisation, coincident with other gold findings to date • Resource update currently being undertaken by SRK Consultants The drilling programme concentrated on three sub-parallel structures, theEastern, Central and Western Zones, which have been explored and trial mined inthe past. The combined strike extent of these structures covered by the recentdrilling constitutes less than 25% of the 3.4km known gold anomaly on theprospect. The programme completed 27 inclined holes for a total of 4600 metres. The holeswere programmed to confirm previous exploration drilling results and determineadditional possible strike extensions to known mineralisation. Ten, seven andten holes were completed on the Eastern, Central and Western Zones respectively. Assay results from the Eastern Zone were published on 22 June 2005. The company has received assay results from the other two zones and below is atable of some of the significant intersections. Hole ID Dip (degrees) Intercept From (m) DDH11 45 5m@0.90g/t 13 DDH12 45 4m@6.47g/t 144 Includes 1m@13.76g/t DDH13 45 9m@4.11g/t 139 and and 166.5 4m@4.97g/t DDH16 45 5m@1.12g/t 42 DDH17 45 7m@2.5g/t 76 Includes 1m@10.48g/t DDH21 45 22m@3.34g/t 101.3 DDH22 45 DDH23 45 8.6m@2.17g/t 140 Includes 1m@11.4g/t DDH25 45 32m@3.76g/t 162 Includes 13m@6.37g/t DDH26 45 14m@1.88g/t 60 DDH27 45 7.4m@2.66g/t and 109.6 and 131.3 18.10m@3.05g/t Includes 5.3m@8.37g/t The mineralisation remains open in all directions on both structures. TheCompany has currently expended over US$1m on the prospective Baomahun projectand will make a further announcement soon, upon the completion of the resourceupdate which is currently being undertaken by SRK Consultants. In addition, the Company has completed a ground geophysical survey of 12 linekilometres over a strike length of 2.4 kilometres using three different methods:SP (SELF Potential), VLF (Very Low Frequency) and magnetics. The identifiedanomalies, interpreted to be buried sulphide mineralisation, are coincident withboth the gold in soil anomalies and the high gold values in drill holeintersections. Geological core logging has shown that high gold mineralisationis associated with sulphide mineralisation, mostly pyrrhotite. Douglas Chikohora, Technical Director of Cluff Gold plc, comments, '"We arepleased with the assay results which have served to confirm the historical drilldata and extended strike and down dip extensions of the mineralised structureson the prospect. In particular, holes 25 and 27 demonstrate that the Centraland Western Zones are both wider and higher grade further to the north and atdepth. The results from the ground geophysics programme will be used togenerate additional drill targets along strike of the Eastern, Central andWestern Zones in the previously established 3.4 kilometre gold anomaly corridor. We believe, from recent airborne geophysical survey work, that the geology inthis corridor is similar to the areas recently tested by the drilling and areindicative of a large mineralised system.'' About Baomahun: Baomahun is located about 180 km east of the capital, Freetown, in the SouthernProvince of the country and the geological setting is similar to the LakeVictoria goldfields in Tanzania. Cluff has a right to earn a 60% interest inBaomahun by funding the project to the completion of a bankable feasibilitystudy or to a maximum of US$5 million. This right is to be acquired fromWinston Mines which owns the two exploration licences relating to Baomahun,covering an area of approximately 137 km(2). For further information, please contact: Cluff Gold Numis Securities Parkgreen CommunicationsJ.G. Cluff / Douglas Chikohora John Harrison Cathy Malins / Annabel LeatherChairman / Technical Director Tel: 020 7776 1500 Tel: 020 7493 3713Tel: 020 7340 9790 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
18th Apr 20161:28 pmRNSForm 8.3 - Perseus Mining Limited
18th Apr 201611:45 amRNSForm 8.3 - Perseus Mining Limited
18th Apr 201611:27 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
18th Apr 201610:54 amRNSSCHEME OF ARRANGEMENT BECOMES EFFECTIVE
18th Apr 201610:12 amRNSForm 8.5 (EPT/NON-RI)
18th Apr 20169:23 amRNSForm 8.3 - Perseus Mining Ltd
18th Apr 20167:30 amRNSSuspension - Amara Mining Plc
15th Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
15th Apr 201611:58 amRNSCOURT SANCTION OF SCHEME ARRANGEMENT
15th Apr 201611:46 amRNSForm 8.3 - Perseus Mining Limited
14th Apr 20161:34 pmRNSForm 8.5 (EPT/RI) - Amara Mining PLC
14th Apr 201611:50 amRNSForm 8.3 - Perseus Mining Limited - Replacement
14th Apr 201611:42 amRNSForm 8.3 - Perseus Mining Limited
14th Apr 201610:33 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
13th Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
13th Apr 201611:42 amRNSForm 8.3 - Perseus Mining Limited
12th Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
12th Apr 201611:44 amRNSForm 8.3 - Perseus Mining Ltd
11th Apr 20164:53 pmRNSForm 8.3 - Amara Minig
11th Apr 201612:01 pmRNSForm 8.3 - Perseus Mining Limited
11th Apr 201611:08 amRNSHolding(s) in Company
11th Apr 201610:56 amRNSForm 8.3 - [Amara Mining Plc]
11th Apr 201610:24 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
11th Apr 20169:07 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
8th Apr 20168:00 pmEQSDGAP-Regulatory: Form 8.3 - Amara Mining PLC
8th Apr 20161:25 pmRNSRESULTS OF COURT AND GENERAL MEETING
8th Apr 20161:20 pmRNSForm 8.3 - Amara Mining PLC
8th Apr 201611:57 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
8th Apr 201611:56 amRNSForm 8.3 - Perseus Mining Limited
8th Apr 201610:57 amRNSForm 8.3 - [Amara Mining Plc]
8th Apr 201610:56 amRNSHolding(s) in Company
7th Apr 20161:19 pmRNSForm 8.3 - Amara Mining PLC
7th Apr 201611:56 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
6th Apr 20162:32 pmRNSForm 8.3 - Amara Mining PLC
6th Apr 201611:31 amRNSForm 8.3 - Perseus Mining Limited
6th Apr 20169:46 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
5th Apr 20161:56 pmRNSForm 8.3 - Perseus Mining Limited - Acorn Capital
5th Apr 20161:17 pmRNSForm 8.3 - Amara Mining PLC
5th Apr 20169:18 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
4th Apr 20163:03 pmRNSForm 8.3 - Amara Mining PLC
4th Apr 201611:43 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
4th Apr 20169:51 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
1st Apr 20165:29 pmRNSForm 8.3 - Amara Mining PLC
1st Apr 20163:31 pmRNSForm 8.3 - Perseus Mining Limited
1st Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
1st Apr 201611:48 amRNSForm 8.3 - Perseus Mining Ltd
1st Apr 20167:00 amRNSForm 8.3 - Amara Mining PLC
31st Mar 201612:56 pmRNSForm 8.3 - Perseus Mining Ltd
31st Mar 201610:51 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
31st Mar 201610:49 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.