Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 110.50
Bid: 110.00
Ask: 111.00
Change: -2.50 (-2.21%)
Spread: 1.00 (0.909%)
Open: 113.00
High: 0.00
Low: 0.00
Prev. Close: 113.00
ALTN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production Update

12 Oct 2011 07:00

Hambledon Mining Plc

("Hambledon" or "the Company")

Activities Report for the Quarter Ended 30 September 2011

Hambledon Mining plc (AIM: HMB), the Kazakhstan gold mining and development company, today provides its operational report for the three months from 1 July to 30 September 2011. A copy of this report will be available on the Company's website, www.hambledon-mining.com

Production figures for the three months from 1 July - 30 September 2011:

July August September Total
Milled tonnes (dry) 77,632 69,591 69,268 216,491
Gold grade (g/t) 0.73 1.20 1.25 1.05
Contained gold (gms) 56,593 83,230 86,618 226,441
Contained gold (oz) 1,819 2,675 2,784 7,278
Gold recovery % 82.24 84.01 82.01 82.75
Recovered gold (oz) 1,496 2,247 2,283 6,026
Recovered silver (oz) 3,257 4,135 3,495 10,887

OPEN PIT AND PROCESSING OPERATIONS

The extraction of excess open pit waste material is nearing completion. During the quarter ended 30 September 2011, the Sekisovskoye mining operation averaged 450,000t of material movement each month, totalling 1.368Mt. This increase of 35%, compares with the 1.015Mt excavated in Q3 2010. Substantial improvements to the operations have been achieved over the past six months and once the excessive waste quantities have been removed, the mining operations at Sekisovskoye will be well placed for 2012.

The focus on waste extraction during July meant that less ore was mined. As a result, a significant proportion of ore from the low grade stockpile was treated, resulting in the exceptionally low overall gold grade in that month. In August and September, more regular mining activities resumed so that less ore from the low grade stockpile was treated, resulting in an improved grade of feed to the process plant.

The process plant treated 216,491 tonnes of material and produced a total of 6,026 ounces of gold and 10,887 ounces of silver.

UNDERGROUND

The decline access to the underground deposit advanced according to plan during the quarter with no safety incidents. The development of the underground project remains on target for extraction commencing in Q4 2011. Two separate underground tunnels were completed to provide drill chamber access for the ore zones.

DRILLING

As part of Hambledon's 25,000m drill programme, the results from some forty-seven holes have been announced, totalling approximately 8,000 metres. The drill results released to date have been above expectations. There has been an expansion of resources from all ore zones, notably from Ore Body 11 which will be the first zone to be mined. The next set of drill results will be announced shortly.

INFRASTRUCTURE

Construction of tailings dam No. 3 is complete and the dam has been commissioned. Construction of tailings dam No. 4 has commenced with topsoil removal complete, clay removal 25% complete and construction of the rock embankment 12% complete.

Open pit waste is being used to construct the tailings dam No. 4 embankment which will reduce mining operating costs, minimise land disturbance and decrease the long term rehabilitation liability of the business. The design of this impoundment raise has been completed in accordance with the revised waste management strategy. This will eliminate the need for ongoing construction once tailings dam No.4 and the tailings dam complex raise is complete.

The expansion of the engineering workshops is well advanced with completion scheduled for December 2011.

Tim Daffern, Chief Executive Officer of Hambledon, commented today: "The Q3 results mark a pleasing return to more regular operating performance levels. We are continually striving to enhance the efficiency of our business. The decision to advance the removal of open pit material in order to optimise the performance of the open pit is essentially complete, with a commensurate reduction in operating costs per ounce in quarter three. Over the next quarter, we look forward to updating shareholders with further results from our underground drill campaign and progress of the main transport decline and preparatory works associated with extraction of ores from the underground ore bodies.''

Enquiries;

HAMBLEDON MINING: Telephone +44 (0)207 233 1462Charles Zorab

FAIRFAX I.S. PLC (NOMAD AND BROKER): Telephone +44 (0)207 598 5368Ewan Leggat/Katy Birkin

TAVISTOCK COMMUNICATIONS: Telephone +44 (0)207 920 3150Ed Portman/Jos Simson

Copyright Business Wire 2011

Date   Source Headline
29th Jun 20121:56 pmBUSResult of AGM
21st Jun 201210:46 amBUSUpdate on fines
14th Jun 20123:53 pmRNSUpdate on Dore Export
14th Jun 20123:49 pmRNSDrilling Update
6th Jun 201211:32 amBUSEBRD Loan Agreement
28th May 201210:28 amBUSFinal Results
15th May 20122:57 pmBUSDrilling Update
30th Apr 20128:00 amBUSTotal Voting Rights
25th Apr 201212:21 pmBUSPotential share fraud
25th Apr 201211:58 amBUSHolding(s) in Company
20th Apr 20127:00 amBUSProduction Update
11th Apr 201210:33 amBUSHolding(s) in Company
5th Apr 20126:13 pmBUSProgress Update
22nd Feb 201210:35 amBUSHolding(s) in Company
22nd Feb 20129:20 amBUSLoan Agreement
21st Feb 201211:53 amBUSDrilling Update
17th Feb 20121:52 pmBUSResult of EGM
1st Feb 20129:41 amBUSPlacing of Shares
27th Jan 20124:43 pmBUSEBRD approval
19th Jan 20127:00 amBUSDrilling Report
16th Jan 20121:38 pmBUSProduction Update
12th Jan 20123:34 pmBUSPotential investment by EBRD - Replacement
12th Jan 201211:51 amBUSPotential investment by EBRD
29th Dec 201110:44 amBUSFine for tailings dam leak
8th Nov 20117:00 amBUSCommencement of Underground Mining
7th Nov 20114:36 pmBUSProcess Plant Update
2nd Nov 20115:20 pmBUSProcess Plant Interruption
1st Nov 20115:53 pmBUSDirector/PDMR Shareholding - Replacement
1st Nov 20114:51 pmBUSDirector/PDMR Shareholding
17th Oct 20117:00 amBUSDrilling Update
12th Oct 20117:00 amBUSProduction Update
11th Oct 201112:32 pmBUSHolding(s) in Company
27th Sep 20119:30 amBUSHalf-yearly Report
15th Sep 201111:31 amBUSAcquisition
31st Aug 20112:34 pmBUSDrilling Update
2nd Aug 20119:17 amRNSAppointment of Non-executive Director
29th Jul 20114:27 pmRNSGrant of Options
11th Jul 20118:05 amBUSProduction Update
19th May 20117:00 amBUSDrilling Update
4th May 20117:00 amBUSFinal Results
12th Apr 20117:00 amBUSActivities Report
6th Apr 20114:59 pmBUSHolding(s) in Company
30th Mar 201111:20 amBUSResult of EGM
30th Mar 20117:00 amBUSDrill Results
14th Mar 20117:00 amBUSProposed Firm Placing and Open Offer and Notice of General Meeting
11th Mar 201110:32 amBUSStatement Regarding Press Speculation
3rd Mar 20119:30 amBUSChange of Adviser
22nd Feb 20117:00 amBUSUnderground Capital Costs
8th Feb 20117:00 amBUSUnderground Mine Development
10th Jan 201110:33 amBUSProduction Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.