The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 110.50
Bid: 110.00
Ask: 111.00
Change: 0.00 (0.00%)
Spread: 1.00 (0.909%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 110.50
ALTN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production Update

12 Oct 2011 07:00

Hambledon Mining Plc

("Hambledon" or "the Company")

Activities Report for the Quarter Ended 30 September 2011

Hambledon Mining plc (AIM: HMB), the Kazakhstan gold mining and development company, today provides its operational report for the three months from 1 July to 30 September 2011. A copy of this report will be available on the Company's website, www.hambledon-mining.com

Production figures for the three months from 1 July - 30 September 2011:

July August September Total
Milled tonnes (dry) 77,632 69,591 69,268 216,491
Gold grade (g/t) 0.73 1.20 1.25 1.05
Contained gold (gms) 56,593 83,230 86,618 226,441
Contained gold (oz) 1,819 2,675 2,784 7,278
Gold recovery % 82.24 84.01 82.01 82.75
Recovered gold (oz) 1,496 2,247 2,283 6,026
Recovered silver (oz) 3,257 4,135 3,495 10,887

OPEN PIT AND PROCESSING OPERATIONS

The extraction of excess open pit waste material is nearing completion. During the quarter ended 30 September 2011, the Sekisovskoye mining operation averaged 450,000t of material movement each month, totalling 1.368Mt. This increase of 35%, compares with the 1.015Mt excavated in Q3 2010. Substantial improvements to the operations have been achieved over the past six months and once the excessive waste quantities have been removed, the mining operations at Sekisovskoye will be well placed for 2012.

The focus on waste extraction during July meant that less ore was mined. As a result, a significant proportion of ore from the low grade stockpile was treated, resulting in the exceptionally low overall gold grade in that month. In August and September, more regular mining activities resumed so that less ore from the low grade stockpile was treated, resulting in an improved grade of feed to the process plant.

The process plant treated 216,491 tonnes of material and produced a total of 6,026 ounces of gold and 10,887 ounces of silver.

UNDERGROUND

The decline access to the underground deposit advanced according to plan during the quarter with no safety incidents. The development of the underground project remains on target for extraction commencing in Q4 2011. Two separate underground tunnels were completed to provide drill chamber access for the ore zones.

DRILLING

As part of Hambledon's 25,000m drill programme, the results from some forty-seven holes have been announced, totalling approximately 8,000 metres. The drill results released to date have been above expectations. There has been an expansion of resources from all ore zones, notably from Ore Body 11 which will be the first zone to be mined. The next set of drill results will be announced shortly.

INFRASTRUCTURE

Construction of tailings dam No. 3 is complete and the dam has been commissioned. Construction of tailings dam No. 4 has commenced with topsoil removal complete, clay removal 25% complete and construction of the rock embankment 12% complete.

Open pit waste is being used to construct the tailings dam No. 4 embankment which will reduce mining operating costs, minimise land disturbance and decrease the long term rehabilitation liability of the business. The design of this impoundment raise has been completed in accordance with the revised waste management strategy. This will eliminate the need for ongoing construction once tailings dam No.4 and the tailings dam complex raise is complete.

The expansion of the engineering workshops is well advanced with completion scheduled for December 2011.

Tim Daffern, Chief Executive Officer of Hambledon, commented today: "The Q3 results mark a pleasing return to more regular operating performance levels. We are continually striving to enhance the efficiency of our business. The decision to advance the removal of open pit material in order to optimise the performance of the open pit is essentially complete, with a commensurate reduction in operating costs per ounce in quarter three. Over the next quarter, we look forward to updating shareholders with further results from our underground drill campaign and progress of the main transport decline and preparatory works associated with extraction of ores from the underground ore bodies.''

Enquiries;

HAMBLEDON MINING: Telephone +44 (0)207 233 1462Charles Zorab

FAIRFAX I.S. PLC (NOMAD AND BROKER): Telephone +44 (0)207 598 5368Ewan Leggat/Katy Birkin

TAVISTOCK COMMUNICATIONS: Telephone +44 (0)207 920 3150Ed Portman/Jos Simson

Copyright Business Wire 2011

Date   Source Headline
24th Dec 201812:35 pmRNSPrice Monitoring Extension
14th Sep 20181:14 pmBUSNotification of Transaction by Person Discharging Managerial Responsibilities (“PDMR”)
9th Aug 20184:40 pmRNSSecond Price Monitoring Extn
9th Aug 20184:35 pmRNSPrice Monitoring Extension
2nd Jul 201812:40 pmBUSAGM Statement
30th Apr 20184:25 pmBUSFinal Results
26th Feb 20187:09 amBUSFinancing Update
23rd Jan 20184:39 pmRNSTR-1
23rd Jan 20189:00 amRNSPartial conversion of African Resources Limited
17th Jan 201810:10 amRNSTR-1
17th Jan 201810:10 amRNSTR-1
17th Jan 201810:10 amRNSChange in substantial shareholdings
16th Jan 20187:00 amRNSMine development and production update
29th Dec 201710:12 amRNSChanges to the Board
27th Nov 20177:00 amRNSFinal repayment of EBRD loan
22nd Nov 20171:14 pmRNSChanges to the Board
15th Nov 201711:52 amRNSAltyn transparency disclosure 2016
12th Oct 20174:35 pmRNSPrice Monitoring Extension
31st Aug 20175:17 pmRNSInterim report
28th Jun 20172:55 pmRNSResult of AGM
10th May 20174:40 pmRNSSecond Price Monitoring Extn
10th May 20174:35 pmRNSPrice Monitoring Extension
28th Apr 20174:43 pmRNSResults for the year ended 31 December 2016
19th Apr 20177:00 amRNSOperational Update for Q1 2017
10th Apr 20174:35 pmRNSPrice Monitoring Extension
3rd Apr 20172:16 pmRNSReplacement Operational Update for FY 2016
3rd Apr 20177:00 amRNSOperational Update for FY 2016
1st Feb 20177:00 amBUSDirectorate change
20th Dec 20162:42 pmBUSChange of Name
8th Dec 20163:15 pmBUSClarification of All In Sustaining Cost estimate -Sekisovskoye underground mine development
29th Nov 20167:00 amBUSSekisovskoye Underground Mine Development and Production Update
24th Oct 20167:00 amBUSSekisovskoye underground mine development update
1st Sep 20167:00 amBUSHalf-year Report
14th Jul 20161:00 pmBUSDirectorate change
28th Jun 201610:57 amBUSAGM Statement
21st Jun 201611:32 amBUSHolding(s) in Company
8th Jun 20167:29 amBUSCompany Update
7th Jun 20161:13 pmBUSTotal Voting Rights
1st Jun 20167:00 amBUSMine Development and Company Update
31st May 201611:42 amBUSTransparency Disclosure
31st May 201610:36 amBUSClarification announcement regarding appointment of proxy
18th May 201610:56 amBUSIssue of US$2m 10% p.a. Convertible Notes due 1 May 2021
29th Apr 20164:22 pmBUSFinal Results
15th Apr 20164:35 pmRNSPrice Monitoring Extension
29th Feb 201612:30 pmBUSIssue of US$10m - 10% p.a. Convertible Bond due 28 February 2021
29th Feb 201611:40 amBUSDirectorate Change
24th Feb 20167:00 amBUSSekisovskoye Mine Award
16th Feb 20168:45 amBUSDirector/PDMR Shareholding - Replacement
16th Feb 20167:00 amBUSDirector/PDMR Shareholding
2nd Feb 201611:09 amBUSSekisovskoye Underground Mine Development and Capital Expenditure Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.