If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

Share Price is delayed by 15 minutes
Get Live Data
840.00    -32.00 (-3.67%)
Bid:
836.00
Ask:
848.00
Spread: 12.00 (1.435%)
Market Cap: £229.60m
ALTN Live PriceLast checked at - London Stock Exchange

Intraday Altyngold Share Chart

Drilling Update

19 May 2011 07:00

Hambledon Mining plc

("Hambledon" or "Company")

Latest drilling results from Sekisovskoye Underground Project, Kazakhstan

Hambledon Mining plc (AIM: HMB), the Kazakhstan gold producer, today provides an update on the latest set of drill results received from its substantial underground drill programme at Sekisovskoye.

Results from the drill campaign during March and April 2011:

Seventeen drill holes completed to date, all have intersected gold mineralisation Over 2,730 metres drilled of planned 25,000 metre operation Key mineralised intersections include: Hole D66 - 18m at 3.66 g/t Au Hole D133 - 15m at 4.0 g/t Au Hole D67 - 1m at 10.9 g/t Au

The results from completed drilling continue to show increases in overall width of mineralisation when compared to the drilling undertaken in the 1990s and historically by the Soviet exploration programmes. These width extensions lead to an increased volume of economic mineral resources.

The recent drilling has been aligned to the mine planning work for stope definition. This information is to be used by Golders Associates ("Golders") in their current geological modeling of Sekisovskoye at 1.0 g/t Au cut off grade boundary. This modelling forms the basis for the detailed mine engineering that is also being undertaken by Golders. The result of both studies is that later in 2011 Hambledon will be in a position to update its mineable reserve statement. The analytical works were carried out in the Altai Ken-Bayitu laboratory with independent assay verification undertaken by the Alex Stewart Group in Karabalta, Kyrgyzstan.

The Sekisovskoye deposit comprises approximately ten large mineralised zones intermingled with an additional 190 narrow and sinuous mineralisation zones. The zones of mineralisation show wide variation in thickness from 0.35 metres to 30 metres with an average of 2.2 metres and localised pinch and swell structure, with variable gold and silver content.

Tim Daffern, CEO, commented:

"Our positive progress in the drilling programme has resulted in gold mineralisation in line with management expectations. We hope to update shareholders before the end of the June with the next batch of underground drill results. To date, 17 drill holes have been completed and the results have confirmed the geometry of the resource and validity of the current resource model"

Appendix 1

Sekisovskoye 2011 - Drill result summary as of May 2011, hole 9 (complete) to hole 17.

? HOLE COORDINATES DEPTH GOLD MINERALIZATION_ore intervals
X Y Z AZI DIP drilled core total FROM TO LENGTH AA-AKB LAB, AU, g/t
9 D125 7617.3 6757.22 322.95 225 -30 189.8 189.8 189.8 3.00 4.00 1 7.32
11.00 15.00 4 2.38
37.00 70.00 33 4.5
91.00 92.00 1 1.32
109.00 110.00 1 1.78
123.00 124.00 1 1.38
145.00 147.00 2 2.16
170.00 171.00 1 1.5
177.00 178.00 1 1.29
10 D135 7613.814 6640.819 327.047 41 0 75.1 75.1 75.1 15.00 16.00 1 1.59
11 D136 7611.787 6639.246 325.657 230 -68 164.1 164.1 164.1 38.00 53.00 15 1.52
98.70 99.70 1 1.37
158.00 159.00 1 1.52
12 D67 7449.712 6930.709 324.24 225 -46.4 209.4 209.4 209.4 17.00 18.00 1 1.26
30.50 31.50 1 1.14
38.70 39.80 1.1 5
135.00 136.00 1 10.9
170.70 171.40 0.7 1.17
174.80 176.00 1.2 2.11
205.00 206.00 1 1.33
13 D139 7586.18 6614.071 326.905 227 0 175.6 175.6 175.6 71.00 72.00 1 1.26
124.00 126.00 2 2.29
14 D66 7453.59 6934.41 324.56 49 -43 70.5 70.5 70.5 7.00 8.00 1 1.7
12.00 13.00 1 1.88
17.00 18.00 1 1.06
22.00 34.00 12 3.66
37.00 43.00 6.00 2.87
64.00 65.00 1.00 4.82
15 D137 7609.407 6637.11 324.849 224 -33.1 91.9 91.9 91.9 4.00 5.00 1.00 1.34
16 D134 7564.42 6649.838 325.01 230 -41 61.5 61.5 61.5 3.00 4.00 1 1.85
29.00 30.00 1 1.3
36.00 37.00 1 1.38
17 D133 7564.67 6650.032 324.145 226 -78 123 123 123 8.40 9.40 1.00 1.34
20.80 21.80 1.00 4.65
24.80 25.80 1.00 2.13
30.70 31.60 0.90 1.29
40.30 41.30 1.00 1.12
48.00 49.00 1.00 1.24
50.00 51.00 1.00 1
55.00 56.00 1.00 1.48
69.00 77.00 8.00 1.15
87.00 88.00 1.00 3.93
93.00 108.00 15.00 4
111.00 112.00 1.00 1.62
114.00 115.00 1.00 1.14

Qualified Person

Information in this report relating to the exploration results is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM, MIMMM, MCIM, Chartered Mining Engineer, Chief Executive Officer of Hambledon Mining plc. Timothy Daffern has in excess of 21 years experience in mineral project development and evaluation including exploration and is a Qualified Person under the AIM Rules.

ENQUIRIES:

HAMBLEDON MINING:

Telephone +44 (0)207 233 1462

Charles Zorab

FAIRFAX I.S. PLC (NOMAD AND JOINT BROKER):

Telephone +44 (0)207 598 5368

Ewan Leggat/Katy Birkin

AMBRIAN PARTNERS LTD (JOINT BROKER):

Telephone +44 (0)207 634 4700

Samantha Harrison/Shaun Whyte

TAVISTOCK COMMUNICATIONS:

Telephone +44 (0)207 920 3150

Ed Portman/Jos Simson

Copyright Business Wire 2011

Date   Source Headline
14th Jan 20107:30 amBUSProduction Update
12th Jan 201011:41 amBUSHolding(s) in Company
23rd Dec 20094:14 pmRNSDirector/PDMR Shareholding
14th Dec 200912:45 pmBUSDirector/PDMR Shareholding
9th Oct 20098:11 amBUSProduction Update
30th Sep 20095:26 pmBUSHolding(s) in Company
23rd Sep 20097:00 amBUSIssue of Equity
18th Sep 20095:35 pmBUSHolding(s) in Company
17th Sep 20097:00 amBUSHalf-yearly Report
10th Sep 20094:06 pmBUSHolding(s) in Company
20th Jul 200910:38 amBUSAGM Statement
14th Jul 200910:15 amBUSProduction Update
9th Jul 200911:50 amRNSHolding(s) in Company
19th Jun 200912:30 pmBUSAnnual Financial Report
9th Jun 20097:00 amBUSFinal Results
9th Jun 20097:00 amBUSProduction Update
15th Apr 20099:23 amBUSProduction Update
11th Mar 200911:49 amBUSDirector/PDMR Shareholding
11th Mar 20097:00 amBUSMine Equipment Update
23rd Feb 20093:58 pmBUSHolding(s) in Company
14th Jan 200910:05 amBUSProduction Update
15th Dec 200811:23 amRNSHolding(s) in Company
9th Dec 20084:52 pmBUSHolding(s) in Company
18th Nov 200812:18 pmBUSVAT Refund
14th Nov 200811:34 amRNSDirector/PDMR Shareholding
12th Nov 200811:50 amRNSHolding(s) in Company
7th Nov 200812:42 pmRNSDirector/PDMR Shareholding
30th Oct 20087:05 amRNSHolding(s) in Company
27th Oct 20084:02 pmRNSHolding(s) in Company
9th Oct 20089:00 amRNSProduction Update
29th Sep 20087:00 amRNSGrant of Options to Directors
18th Sep 20087:00 amRNSInterim Results
28th Aug 200812:43 pmRNSHolding(s) in Company
11th Aug 20087:01 amRNSProduction Update
11th Aug 20087:00 amRNSChange of Adviser
22nd Jul 20083:47 pmRNSResult of AGM
17th Jul 20089:17 amRNSHolding(s) in Company
9th Jul 20084:42 pmRNSHolding(s) in Company - Amend
7th Jul 200812:00 pmRNSDirector Shareholding
7th Jul 200811:41 amRNSTotal Voting Rights
7th Jul 20087:00 amRNSOperations Update
7th Jul 20087:00 amRNSOperations Update
4th Jul 20084:33 pmRNSHolding(s) in Company
4th Jul 20084:29 pmRNSHolding(s) in Company
9th Jun 20087:00 amRNSFinal Results
21st May 200812:15 pmRNSIssue of Equity
12th May 20086:00 amRNSOperational Update
1st May 200812:00 pmRNSSeki Fully Operational
23rd Apr 20087:00 amRNSSeki Resumes Production
10th Mar 20087:02 amRNSSekisovskoye Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.