The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 112.00
Bid: 110.00
Ask: 111.00
Change: 0.00 (0.00%)
Spread: 1.00 (0.909%)
Open: 111.00
High: 112.00
Low: 110.00
Prev. Close: 110.50
ALTN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drill Results

30 Mar 2011 07:00

Hambledon Mining plc

("Hambledon" or "Company")

Sekisovskoye Underground Project - Drilling Update

30 March 2011

Hambledon is currently undertaking a substantial underground drill programme to validate and expand the geological resources at Sekisovskoye.

Key results from the programme to date are as follows:

Eight drill holes completed Over 1,700 metres drilled Significant intersections include: Hole D121 - 33m at 4.78 g/t Au Hole D121 - 60.4m at 5.6 g/t Au Hole D122 - 8m at 10.75 g/t Au Hole D122 - 44m at 5.74 g/t Au Hole D124 - 26.3m at 5.13 g/t Au Hole D125 - 33m at 4.5g/t Au

As announced on 10 January 2011, Hambledon has committed to, and commenced, an 18 month drill programme of approximately 25,000 metres to be completed at an average rate of 1,500 metre per month. An extension of this drill programme will be undertaken once the underground decline is constructed below the existing 320 metre level, which sits some 85 metres below the base of the current open pit.

To date, 8 drill holes have been completed and the results have confirmed the geometry of the resource and validity of the current resource model. Significantly, the drill holes have also expanded the known dimensions and increased the volume of ore in zone 8, one of the main zones, by over 22%. Further details of the drill hole results are included in Appendix 1 below.

The analytical works were carried out in the Altai Ken-Bayitu laboratory with independent assay verification to be undertaken by the Alex Stewart Group in Karabalta, Kyrgyzstan.

The Sekisovskoye deposit is in the Rudny Altai metallogenic belt and is one of seven gold fields in East Kazakhstan. The host rocks are very coarse grained, altered, igneous breccia zones of variable composition within granitoid intrusives. The breccias range up to 700 metres in width by 160 metres in breadth, with steep northeasterly dips, and extend to drilled depths greater than 950 metres. The breccias are cut by mostly concordant dykes of various compositions and a system of cross-cutting faults. Gold mineralisation is restricted to the igneous breccias between barren igneous dykes dipping northeast. The zones of mineralisation show wide variation in thickness from 0.35 meters to 30 metres with an average of 2.2 metres and localised pinch and swell structure, with variable gold and silver content.

The drill results confirm the high grade mineralisation with average in-situ grades between 5-6 g/t of gold, and 6-7 g/t of silver. The mined grade post dilution is expected to average 4.2 g/t of gold.

The current geological model and JORC resource, which is currently in excess of 2.0M ounces of Gold and 2.9M ounces of Silver, is being updated and will be released in conjunction with publication of the Company's annual report and accounts for the financial year to December 2010 in Q2 2011. Further resource updates will be announced with the drill results.

A revised underground mine design and infrastructure engineering study is being undertaken by Golders Associates Limited which will enable updated mine reserves to be issued in December 2011.

Appendix 1

Sekisovskoye 2011 - Drill result summary as of 19 March 2011:

HOLE COORDINATES DEPTH GOLD MINERALIZATION_ore intervals
X Y Z AZI DIP drilled core total FROM TO LENGTH

AA-AKBLAB, AU,g/t

D109 7675.184 6860.351 323.6 227.5 -51.9 222.2 222.2 222.2
73.10 74.60 1.5 1.11
95.40 96.10 0.7 1.52
170.60 171.50 0.9 1.52
182.90 184.00 1.1 2.42
D111 7619.21 6759.07 322.8 229 -39 205.8 205.8 205.8
19.00 19.25 0.25 7.82
67.50 69.00 1.5 2.68
166.00 167.30 1.3 1.4
172.70 174.30 1.6 1.4
188.20 198.30 10.1 3.31
D113 7675.256 6860.447 324.2058 228.5 -25.9 195 195 195
137.25 137.40 0.15 13.92
142.50 144.00 1.5 1.42
159.00 160.40 1.4 1.55
166.50 168.00 1.5 1.03
D114 7675.263 6860.438 324.4852 228 -14 199.4 199.4 199.4
115.40 116.90 1.5 1.58
158.90 161.90 3.0 4.91
166.40 167.90 1.5 4.54
191.90 193.40 1.5 1.86
D121 7619.21 6759.071 323 226 -86 205.3 205.3 205.3 0.00 4.90 4.9 1.72
7.50 15.00 7.5 2.76
20.00 53.00 33 4.78
58.00 68.50 10.50 1.59
73.50 74.50 1 4.92
78.60 79.60 1 1.32
92.60 93.60 1 1.3
97.60 98.60 1 1.22
104.60 165.00 60.4 5.6
170.00 171.00 1 1.08
176.00 179.00 3 1.6
180.00 181.00 1 1.04
D122 7618.779 6758.649 322.8089 227 -71 176.3 176.3 176.3 0.00 4.00 4 2.9
8.00 16.00 8 10.75
21.00 39.00 18 1.91
47.00 48.00 1 1.12
51.00 54.00 4 3.1
59.00 103.00 44 5.74
111.00 122.00 11 1.94
126.00 127.00 1 1.52
128.00 129.00 1 1.2
135.00 136.00 1 13.52
139.00 146.00 7 2.16
157.00 158.00 1 1.7
D123 7618.392 6758.271 322.9357 227 -60 179 179 179 0.00 12.00 12 2.38
15.00 17.00 2 3.65
20.00 38.00 18 2.6
46.00 55.00 9 1.59
61.00 66.00 5 1.81
72.00 99.00 27 2.76
104.00 109.00 5 5.41
D124 7617.93 6757.8 322.96 227 -46 190.4 190.4 190.4 2.80 6.10 3.3 12.5
16.00 17.00 1 4.93
27.60 34.50 6.9 4.05
37.50 38.50 1 1.4
42.80 48.70 5.9 5.97
52.70 79.00 26.3 5.13
84.00 85.00 1 1
92.50 97.50 5 1.12
99.80 108.00 8.2 1.79
116.00 118.00 2 1.87
130.00 137.00 7 1.87
141.00 144.00 3 1.02
151.00 153.00 2 3.29
156.00 158.00 2 2.53
164.00 165.00 1 1.26
167.10 169.00 1.9 1.04
D125 7617.3 6757.22 322.95 227 -30 189.8 189.8 189.8 3.00 4.00 1 7.32
11.00 15.00 4 2.38
37.00 70.00 33 4.5
91.00 92.00 1 1.32
109.00 110.00 1 1.78
123.00 124.00 1 1.38
Total 1763.2 1763.2 1763.2

Qualified Person

Information in this report relating to the exploration results is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM, MIMMM, MCIM, Chartered Mining Engineer, Chief Executive Officer of Hambledon Mining plc. Timothy Daffern has in excess of 21 years experience in mineral project development and evaluation including exploration and is a Qualified Person under the AIM Rules.

ENQUIRIES:

HAMBLEDON MINING

Telephone +44 (0)207 233 1462
Charles Zorab

FAIRFAX I.S. PLC

Nominated Adviser and Joint Broker
Telephone +44 (0)207 598 5368
Ewan Leggat / Katy Birkin

AMBRIAN PARTNERS LIMITED

Joint Broker
Telephone +44 (0)207 634 4700
Samantha Harrison

Copyright Business Wire 2011

Date   Source Headline
14th Jan 200910:05 amBUSProduction Update
15th Dec 200811:23 amRNSHolding(s) in Company
9th Dec 20084:52 pmBUSHolding(s) in Company
18th Nov 200812:18 pmBUSVAT Refund
14th Nov 200811:34 amRNSDirector/PDMR Shareholding
12th Nov 200811:50 amRNSHolding(s) in Company
7th Nov 200812:42 pmRNSDirector/PDMR Shareholding
30th Oct 20087:05 amRNSHolding(s) in Company
27th Oct 20084:02 pmRNSHolding(s) in Company
9th Oct 20089:00 amRNSProduction Update
29th Sep 20087:00 amRNSGrant of Options to Directors
18th Sep 20087:00 amRNSInterim Results
28th Aug 200812:43 pmRNSHolding(s) in Company
11th Aug 20087:01 amRNSProduction Update
11th Aug 20087:00 amRNSChange of Adviser
22nd Jul 20083:47 pmRNSResult of AGM
17th Jul 20089:17 amRNSHolding(s) in Company
9th Jul 20084:42 pmRNSHolding(s) in Company - Amend
7th Jul 200812:00 pmRNSDirector Shareholding
7th Jul 200811:41 amRNSTotal Voting Rights
7th Jul 20087:00 amRNSOperations Update
7th Jul 20087:00 amRNSOperations Update
4th Jul 20084:33 pmRNSHolding(s) in Company
4th Jul 20084:29 pmRNSHolding(s) in Company
9th Jun 20087:00 amRNSFinal Results
21st May 200812:15 pmRNSIssue of Equity
12th May 20086:00 amRNSOperational Update
1st May 200812:00 pmRNSSeki Fully Operational
23rd Apr 20087:00 amRNSSeki Resumes Production
10th Mar 20087:02 amRNSSekisovskoye Update
19th Feb 200812:31 pmRNSUpdate Sekisovskoye Update
12th Feb 20081:52 pmRNSBoiler accident
1st Feb 20082:28 pmRNSDirector/PDMR Shareholding
24th Jan 20087:00 amRNSProject Update/ Board changes
19th Dec 20077:00 amRNSGold Production Commences
30th Nov 20077:00 amRNSOgnevka production commences
19th Nov 200712:03 pmRNSHolding(s) in Company
19th Nov 20079:07 amRNSAdmission of Placing Shares
19th Nov 20077:01 amRNSUpdate & Placing
8th Oct 200711:56 amRNSDirector Shareholding
28th Sep 200711:27 amRNSTotal Voting Rights
28th Sep 200711:26 amRNSDirector/PDMR Shareholding
17th Sep 20077:00 amRNSInterim Results
20th Aug 20079:17 amRNSAIM Rule 26
17th Jul 200710:15 amRNSAGM Statement
21st Jun 20073:00 pmRNSGrant of Options
5th Jun 20077:01 amRNSFinal Results
18th May 20071:36 pmRNSDirector Shareholding
16th May 20077:01 amRNSSekisovskoye Update
30th Apr 200712:18 pmRNSAdditional Listing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.