The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 112.00
Bid: 110.00
Ask: 111.00
Change: 0.00 (0.00%)
Spread: 1.00 (0.909%)
Open: 111.00
High: 112.00
Low: 110.00
Prev. Close: 110.50
ALTN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drill Results

30 Mar 2011 07:00

Hambledon Mining plc

("Hambledon" or "Company")

Sekisovskoye Underground Project - Drilling Update

30 March 2011

Hambledon is currently undertaking a substantial underground drill programme to validate and expand the geological resources at Sekisovskoye.

Key results from the programme to date are as follows:

Eight drill holes completed Over 1,700 metres drilled Significant intersections include: Hole D121 - 33m at 4.78 g/t Au Hole D121 - 60.4m at 5.6 g/t Au Hole D122 - 8m at 10.75 g/t Au Hole D122 - 44m at 5.74 g/t Au Hole D124 - 26.3m at 5.13 g/t Au Hole D125 - 33m at 4.5g/t Au

As announced on 10 January 2011, Hambledon has committed to, and commenced, an 18 month drill programme of approximately 25,000 metres to be completed at an average rate of 1,500 metre per month. An extension of this drill programme will be undertaken once the underground decline is constructed below the existing 320 metre level, which sits some 85 metres below the base of the current open pit.

To date, 8 drill holes have been completed and the results have confirmed the geometry of the resource and validity of the current resource model. Significantly, the drill holes have also expanded the known dimensions and increased the volume of ore in zone 8, one of the main zones, by over 22%. Further details of the drill hole results are included in Appendix 1 below.

The analytical works were carried out in the Altai Ken-Bayitu laboratory with independent assay verification to be undertaken by the Alex Stewart Group in Karabalta, Kyrgyzstan.

The Sekisovskoye deposit is in the Rudny Altai metallogenic belt and is one of seven gold fields in East Kazakhstan. The host rocks are very coarse grained, altered, igneous breccia zones of variable composition within granitoid intrusives. The breccias range up to 700 metres in width by 160 metres in breadth, with steep northeasterly dips, and extend to drilled depths greater than 950 metres. The breccias are cut by mostly concordant dykes of various compositions and a system of cross-cutting faults. Gold mineralisation is restricted to the igneous breccias between barren igneous dykes dipping northeast. The zones of mineralisation show wide variation in thickness from 0.35 meters to 30 metres with an average of 2.2 metres and localised pinch and swell structure, with variable gold and silver content.

The drill results confirm the high grade mineralisation with average in-situ grades between 5-6 g/t of gold, and 6-7 g/t of silver. The mined grade post dilution is expected to average 4.2 g/t of gold.

The current geological model and JORC resource, which is currently in excess of 2.0M ounces of Gold and 2.9M ounces of Silver, is being updated and will be released in conjunction with publication of the Company's annual report and accounts for the financial year to December 2010 in Q2 2011. Further resource updates will be announced with the drill results.

A revised underground mine design and infrastructure engineering study is being undertaken by Golders Associates Limited which will enable updated mine reserves to be issued in December 2011.

Appendix 1

Sekisovskoye 2011 - Drill result summary as of 19 March 2011:

HOLE COORDINATES DEPTH GOLD MINERALIZATION_ore intervals
X Y Z AZI DIP drilled core total FROM TO LENGTH

AA-AKBLAB, AU,g/t

D109 7675.184 6860.351 323.6 227.5 -51.9 222.2 222.2 222.2
73.10 74.60 1.5 1.11
95.40 96.10 0.7 1.52
170.60 171.50 0.9 1.52
182.90 184.00 1.1 2.42
D111 7619.21 6759.07 322.8 229 -39 205.8 205.8 205.8
19.00 19.25 0.25 7.82
67.50 69.00 1.5 2.68
166.00 167.30 1.3 1.4
172.70 174.30 1.6 1.4
188.20 198.30 10.1 3.31
D113 7675.256 6860.447 324.2058 228.5 -25.9 195 195 195
137.25 137.40 0.15 13.92
142.50 144.00 1.5 1.42
159.00 160.40 1.4 1.55
166.50 168.00 1.5 1.03
D114 7675.263 6860.438 324.4852 228 -14 199.4 199.4 199.4
115.40 116.90 1.5 1.58
158.90 161.90 3.0 4.91
166.40 167.90 1.5 4.54
191.90 193.40 1.5 1.86
D121 7619.21 6759.071 323 226 -86 205.3 205.3 205.3 0.00 4.90 4.9 1.72
7.50 15.00 7.5 2.76
20.00 53.00 33 4.78
58.00 68.50 10.50 1.59
73.50 74.50 1 4.92
78.60 79.60 1 1.32
92.60 93.60 1 1.3
97.60 98.60 1 1.22
104.60 165.00 60.4 5.6
170.00 171.00 1 1.08
176.00 179.00 3 1.6
180.00 181.00 1 1.04
D122 7618.779 6758.649 322.8089 227 -71 176.3 176.3 176.3 0.00 4.00 4 2.9
8.00 16.00 8 10.75
21.00 39.00 18 1.91
47.00 48.00 1 1.12
51.00 54.00 4 3.1
59.00 103.00 44 5.74
111.00 122.00 11 1.94
126.00 127.00 1 1.52
128.00 129.00 1 1.2
135.00 136.00 1 13.52
139.00 146.00 7 2.16
157.00 158.00 1 1.7
D123 7618.392 6758.271 322.9357 227 -60 179 179 179 0.00 12.00 12 2.38
15.00 17.00 2 3.65
20.00 38.00 18 2.6
46.00 55.00 9 1.59
61.00 66.00 5 1.81
72.00 99.00 27 2.76
104.00 109.00 5 5.41
D124 7617.93 6757.8 322.96 227 -46 190.4 190.4 190.4 2.80 6.10 3.3 12.5
16.00 17.00 1 4.93
27.60 34.50 6.9 4.05
37.50 38.50 1 1.4
42.80 48.70 5.9 5.97
52.70 79.00 26.3 5.13
84.00 85.00 1 1
92.50 97.50 5 1.12
99.80 108.00 8.2 1.79
116.00 118.00 2 1.87
130.00 137.00 7 1.87
141.00 144.00 3 1.02
151.00 153.00 2 3.29
156.00 158.00 2 2.53
164.00 165.00 1 1.26
167.10 169.00 1.9 1.04
D125 7617.3 6757.22 322.95 227 -30 189.8 189.8 189.8 3.00 4.00 1 7.32
11.00 15.00 4 2.38
37.00 70.00 33 4.5
91.00 92.00 1 1.32
109.00 110.00 1 1.78
123.00 124.00 1 1.38
Total 1763.2 1763.2 1763.2

Qualified Person

Information in this report relating to the exploration results is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM, MIMMM, MCIM, Chartered Mining Engineer, Chief Executive Officer of Hambledon Mining plc. Timothy Daffern has in excess of 21 years experience in mineral project development and evaluation including exploration and is a Qualified Person under the AIM Rules.

ENQUIRIES:

HAMBLEDON MINING

Telephone +44 (0)207 233 1462
Charles Zorab

FAIRFAX I.S. PLC

Nominated Adviser and Joint Broker
Telephone +44 (0)207 598 5368
Ewan Leggat / Katy Birkin

AMBRIAN PARTNERS LIMITED

Joint Broker
Telephone +44 (0)207 634 4700
Samantha Harrison

Copyright Business Wire 2011

Date   Source Headline
6th Oct 20205:00 pmBUSIssue of Equity
30th Sep 20206:25 pmBUSHalf-year Report
10th Aug 20204:41 pmRNSSecond Price Monitoring Extn
10th Aug 20204:36 pmRNSPrice Monitoring Extension
10th Aug 202011:35 amBUSAltyn's production update 2Q 2020
23rd Jul 20204:40 pmRNSSecond Price Monitoring Extn
23rd Jul 20204:35 pmRNSPrice Monitoring Extension
21st Jul 20204:40 pmRNSSecond Price Monitoring Extn
21st Jul 20204:36 pmRNSPrice Monitoring Extension
20th Jul 20209:18 amBUSSubsoil use contract extended until 2030
15th Jul 20204:41 pmRNSSecond Price Monitoring Extn
15th Jul 20204:35 pmRNSPrice Monitoring Extension
13th Jul 20204:36 pmRNSPrice Monitoring Extension
30th Jun 20207:00 amBUSAIX Bond placement complete
26th Jun 20204:41 pmRNSSecond Price Monitoring Extn
26th Jun 20204:36 pmRNSPrice Monitoring Extension
26th Jun 20201:36 pmBUSAGM Statement
15th Jun 20207:00 amBUSSocial responsibility update
9th Jun 20207:00 amBUSProduction and financing update
29th May 20205:00 pmBUSAnnual General Meeting (AGM) - 2020
26th May 20207:00 amBUSDrilling rig delivery
22nd May 20205:00 pmBUSIssue of New Shares
18th May 20207:00 amBUSAltyn Plc: Extension to subsoil mining contract at Sekisovskoye
11th May 20207:00 amBUSQ1 production results
1st May 20207:00 amBUSAnnual Financial Report
16th Apr 20204:41 pmRNSSecond Price Monitoring Extn
16th Apr 20204:36 pmRNSPrice Monitoring Extension
16th Mar 20207:00 amBUSAltyn Plc - Production update
28th Feb 20206:11 pmBUSStandard form for notification of major holdings
11th Dec 201911:02 amBUSBond Issue
9th Dec 201912:07 pmRNSSecond Price Monitoring Extn
9th Dec 201912:02 pmRNSPrice Monitoring Extension
4th Dec 20193:24 pmBUSFunding Update
19th Nov 20194:41 pmRNSSecond Price Monitoring Extn
19th Nov 20194:36 pmRNSPrice Monitoring Extension
29th Oct 201911:15 amBUSIssue of new shares - Replacement
28th Oct 20197:00 amBUSIssue of new shares
15th Oct 20197:00 amBUSCPR Results Teren-Sai (Area #2)
8th Oct 20197:00 amBUSCPR Results (Sekisovskoye)
11th Sep 20197:00 amBUSFunding update
6th Sep 20197:00 amBUSAltyn Plc: Updated Website
2nd Sep 20197:00 amBUSHalf-year Report
11th Jul 20197:00 amBUSUnderground machinery delivery
9th Jul 201912:54 pmBUSResignation of Director
28th Jun 20193:42 pmBUSAGM Statement
1st May 20197:00 amBUSFinal Results
19th Mar 20192:37 pmBUSFunding Update
11th Mar 201912:07 pmRNSSecond Price Monitoring Extn
11th Mar 201912:02 pmRNSPrice Monitoring Extension
24th Dec 201812:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.