Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

Share Price is delayed by 15 minutes
Get Live Data
936.00    10.00 (1.08%)
Bid:
926.00
Ask:
934.00
Spread: 8.00 (0.864%)
Market Cap: £255.84m
ALTN Live PriceLast checked at - London Stock Exchange

Intraday Altyngold Share Chart

Drill Results

30 Mar 2011 07:00

Hambledon Mining plc

("Hambledon" or "Company")

Sekisovskoye Underground Project - Drilling Update

30 March 2011

Hambledon is currently undertaking a substantial underground drill programme to validate and expand the geological resources at Sekisovskoye.

Key results from the programme to date are as follows:

Eight drill holes completed Over 1,700 metres drilled Significant intersections include: Hole D121 - 33m at 4.78 g/t Au Hole D121 - 60.4m at 5.6 g/t Au Hole D122 - 8m at 10.75 g/t Au Hole D122 - 44m at 5.74 g/t Au Hole D124 - 26.3m at 5.13 g/t Au Hole D125 - 33m at 4.5g/t Au

As announced on 10 January 2011, Hambledon has committed to, and commenced, an 18 month drill programme of approximately 25,000 metres to be completed at an average rate of 1,500 metre per month. An extension of this drill programme will be undertaken once the underground decline is constructed below the existing 320 metre level, which sits some 85 metres below the base of the current open pit.

To date, 8 drill holes have been completed and the results have confirmed the geometry of the resource and validity of the current resource model. Significantly, the drill holes have also expanded the known dimensions and increased the volume of ore in zone 8, one of the main zones, by over 22%. Further details of the drill hole results are included in Appendix 1 below.

The analytical works were carried out in the Altai Ken-Bayitu laboratory with independent assay verification to be undertaken by the Alex Stewart Group in Karabalta, Kyrgyzstan.

The Sekisovskoye deposit is in the Rudny Altai metallogenic belt and is one of seven gold fields in East Kazakhstan. The host rocks are very coarse grained, altered, igneous breccia zones of variable composition within granitoid intrusives. The breccias range up to 700 metres in width by 160 metres in breadth, with steep northeasterly dips, and extend to drilled depths greater than 950 metres. The breccias are cut by mostly concordant dykes of various compositions and a system of cross-cutting faults. Gold mineralisation is restricted to the igneous breccias between barren igneous dykes dipping northeast. The zones of mineralisation show wide variation in thickness from 0.35 meters to 30 metres with an average of 2.2 metres and localised pinch and swell structure, with variable gold and silver content.

The drill results confirm the high grade mineralisation with average in-situ grades between 5-6 g/t of gold, and 6-7 g/t of silver. The mined grade post dilution is expected to average 4.2 g/t of gold.

The current geological model and JORC resource, which is currently in excess of 2.0M ounces of Gold and 2.9M ounces of Silver, is being updated and will be released in conjunction with publication of the Company's annual report and accounts for the financial year to December 2010 in Q2 2011. Further resource updates will be announced with the drill results.

A revised underground mine design and infrastructure engineering study is being undertaken by Golders Associates Limited which will enable updated mine reserves to be issued in December 2011.

Appendix 1

Sekisovskoye 2011 - Drill result summary as of 19 March 2011:

HOLE COORDINATES DEPTH GOLD MINERALIZATION_ore intervals
X Y Z AZI DIP drilled core total FROM TO LENGTH

AA-AKBLAB, AU,g/t

D109 7675.184 6860.351 323.6 227.5 -51.9 222.2 222.2 222.2
73.10 74.60 1.5 1.11
95.40 96.10 0.7 1.52
170.60 171.50 0.9 1.52
182.90 184.00 1.1 2.42
D111 7619.21 6759.07 322.8 229 -39 205.8 205.8 205.8
19.00 19.25 0.25 7.82
67.50 69.00 1.5 2.68
166.00 167.30 1.3 1.4
172.70 174.30 1.6 1.4
188.20 198.30 10.1 3.31
D113 7675.256 6860.447 324.2058 228.5 -25.9 195 195 195
137.25 137.40 0.15 13.92
142.50 144.00 1.5 1.42
159.00 160.40 1.4 1.55
166.50 168.00 1.5 1.03
D114 7675.263 6860.438 324.4852 228 -14 199.4 199.4 199.4
115.40 116.90 1.5 1.58
158.90 161.90 3.0 4.91
166.40 167.90 1.5 4.54
191.90 193.40 1.5 1.86
D121 7619.21 6759.071 323 226 -86 205.3 205.3 205.3 0.00 4.90 4.9 1.72
7.50 15.00 7.5 2.76
20.00 53.00 33 4.78
58.00 68.50 10.50 1.59
73.50 74.50 1 4.92
78.60 79.60 1 1.32
92.60 93.60 1 1.3
97.60 98.60 1 1.22
104.60 165.00 60.4 5.6
170.00 171.00 1 1.08
176.00 179.00 3 1.6
180.00 181.00 1 1.04
D122 7618.779 6758.649 322.8089 227 -71 176.3 176.3 176.3 0.00 4.00 4 2.9
8.00 16.00 8 10.75
21.00 39.00 18 1.91
47.00 48.00 1 1.12
51.00 54.00 4 3.1
59.00 103.00 44 5.74
111.00 122.00 11 1.94
126.00 127.00 1 1.52
128.00 129.00 1 1.2
135.00 136.00 1 13.52
139.00 146.00 7 2.16
157.00 158.00 1 1.7
D123 7618.392 6758.271 322.9357 227 -60 179 179 179 0.00 12.00 12 2.38
15.00 17.00 2 3.65
20.00 38.00 18 2.6
46.00 55.00 9 1.59
61.00 66.00 5 1.81
72.00 99.00 27 2.76
104.00 109.00 5 5.41
D124 7617.93 6757.8 322.96 227 -46 190.4 190.4 190.4 2.80 6.10 3.3 12.5
16.00 17.00 1 4.93
27.60 34.50 6.9 4.05
37.50 38.50 1 1.4
42.80 48.70 5.9 5.97
52.70 79.00 26.3 5.13
84.00 85.00 1 1
92.50 97.50 5 1.12
99.80 108.00 8.2 1.79
116.00 118.00 2 1.87
130.00 137.00 7 1.87
141.00 144.00 3 1.02
151.00 153.00 2 3.29
156.00 158.00 2 2.53
164.00 165.00 1 1.26
167.10 169.00 1.9 1.04
D125 7617.3 6757.22 322.95 227 -30 189.8 189.8 189.8 3.00 4.00 1 7.32
11.00 15.00 4 2.38
37.00 70.00 33 4.5
91.00 92.00 1 1.32
109.00 110.00 1 1.78
123.00 124.00 1 1.38
Total 1763.2 1763.2 1763.2

Qualified Person

Information in this report relating to the exploration results is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM, MIMMM, MCIM, Chartered Mining Engineer, Chief Executive Officer of Hambledon Mining plc. Timothy Daffern has in excess of 21 years experience in mineral project development and evaluation including exploration and is a Qualified Person under the AIM Rules.

ENQUIRIES:

HAMBLEDON MINING

Telephone +44 (0)207 233 1462
Charles Zorab

FAIRFAX I.S. PLC

Nominated Adviser and Joint Broker
Telephone +44 (0)207 598 5368
Ewan Leggat / Katy Birkin

AMBRIAN PARTNERS LIMITED

Joint Broker
Telephone +44 (0)207 634 4700
Samantha Harrison

Copyright Business Wire 2011

Date   Source Headline
12th Oct 20117:00 amBUSProduction Update
11th Oct 201112:32 pmBUSHolding(s) in Company
27th Sep 20119:30 amBUSHalf-yearly Report
15th Sep 201111:31 amBUSAcquisition
31st Aug 20112:34 pmBUSDrilling Update
2nd Aug 20119:17 amRNSAppointment of Non-executive Director
29th Jul 20114:27 pmRNSGrant of Options
11th Jul 20118:05 amBUSProduction Update
19th May 20117:00 amBUSDrilling Update
4th May 20117:00 amBUSFinal Results
12th Apr 20117:00 amBUSActivities Report
6th Apr 20114:59 pmBUSHolding(s) in Company
30th Mar 201111:20 amBUSResult of EGM
30th Mar 20117:00 amBUSDrill Results
14th Mar 20117:00 amBUSProposed Firm Placing and Open Offer and Notice of General Meeting
11th Mar 201110:32 amBUSStatement Regarding Press Speculation
3rd Mar 20119:30 amBUSChange of Adviser
22nd Feb 20117:00 amBUSUnderground Capital Costs
8th Feb 20117:00 amBUSUnderground Mine Development
10th Jan 201110:33 amBUSProduction Update
10th Jan 20117:00 amBUSProduction Update
15th Dec 20105:57 pmBUSHolding(s) in Company
13th Dec 201012:37 pmBUSHolding(s) in Company
10th Dec 201012:46 pmBUSHolding(s) in Company
10th Dec 201012:24 pmBUSHolding(s) in Company
1st Dec 20102:17 pmBUSHolding(s) in Company - Replacement
10th Nov 201012:33 pmBUSHolding(s) in Company
8th Nov 20105:39 pmBUSIssue of options
5th Nov 201012:11 pmBUSDirector/PDMR Shareholding
2nd Nov 20109:29 amBUSDirectorate Change
13th Oct 20101:06 pmBUSHolding(s) in Company
13th Oct 201011:47 amBUSHolding(s) in Company
12th Oct 20108:30 amBUSProduction Update
5th Oct 201012:38 pmBUSHolding(s) in Company
22nd Sep 20109:00 amBUSHolding(s) in Company
21st Sep 20107:00 amBUSHalf-yearly Report
17th Sep 20107:10 amBUSDirectorate Change
9th Aug 201012:29 pmBUSHolding(s) in Company
8th Jul 20107:00 amBUSProduction Update
6th Jul 201012:29 pmBUSHolding(s) in Company
23rd Jun 201012:11 pmBUSResult of AGM
23rd Jun 20107:43 amBUSAGM Statement
25th May 20101:03 pmBUSNotice of AGM
19th May 20107:00 amBUSPurchase of Ore
12th May 20107:00 amBUSFinal Results
7th May 201012:11 pmBUSHolding(s) in Company
14th Apr 20108:07 amBUSProduction Update
29th Mar 20104:35 pmRNSHolding(s) in Company
9th Mar 20107:00 amBUSHolding(s) in Company
11th Feb 201011:13 amBUSUpdate

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.