GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0575
Bid: 0.055
Ask: 0.06
Change: 0.00 (0.00%)
Spread: 0.005 (9.091%)
Open: 0.0575
High: 0.0575
Low: 0.0575
Prev. Close: 0.0575
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

15 Nov 2018 07:00

RNS Number : 4106H
Alba Mineral Resources PLC
15 November 2018
 

Alba Mineral Resources plc

("Alba" or "the Company")

 

 

Extended Well Test ("EWT") Hits Significant Production Milestone, KL3 Exceeds 10,000 Barrels

Horse Hill-1 ("HH-1") Portland and Kimmeridge Oil Discovery, Weald Basin, UK

 

Alba Mineral Resources plc (AIM: Alba) announces that Horse Hill Developments Ltd, the operator of the HH-1 Kimmeridge Limestone and conventional Portland Sandstone oil discovery ("HHDL" or the "Operator"), has informed the Company that total oil production from the 2018 EWT has reached 13,920 barrels ("bbl"), approximately 2.21 million litres, with gross oil sales of approximately US$1.1 million.

 

The Operator has advised that:

 

- 2018 HH-1 oil production comprises 10,248 bbl (1.63 million litres) of 40° API oil from the Kimmeridge Limestone 3 ("KL3") and 3,672 bbl (c. 584,000 litres) of 35° API oil from the Portland;

- No formation water was returned to surface from either the KL3 or Portland; and

- The KL4 EWT programme is planned to commence shortly following the ongoing final KL3 pressure build up test.

 

HH-1 is located in licence PEDL137 in which Alba holds an 11.765% effective interest.

The Operator has further advised of the achievement of the following 2018 EWT milestones to date:

 

- Approximately US$1.1 million gross 2018 HH-1 oil sales achieved to date from the KL3 and Portland (this figure excludes the KL4 oil reservoir, which will be tested shortly).

- 13,920 bbl (2.21 million litres) total KL3 and Portland production as of 0700 14 November.

- 10,248 bbl (1.63 million litres) of 40° API produced solely from the KL3 as of 0700 14 November.

- 15,860 bbl (2.52 million litres) aggregate total oil production from the 2016 and 2018 tests.

 

Finally, the Operator has provided the following KL3 EWT Update:

 

- 10,248 bbl of KL3 oil was produced over 30 days of sustained daily natural and pumped flow from an 83 ft perforated interval. The programme included 9 days of pressure build-ups (or "shut-ins") and downhole sampling. Production was achieved via a variety of choke sizes whilst maintaining stable bottom hole pressures. No formation water was returned to surface; however, small intermittent slugs of completion brine were recorded.

- KL3 produced at an initial metered sustained natural flow rate of 771 barrels of oil per day ("bopd"), with a maximum recorded half hourly rate of 902 bopd. The average sustained daily rate over the full test period was 342 bopd. Prior to the final shut-in period the well was producing oil at a stable bottom hole pressure of around 800 psi.

- Total KL3 gas production to date is 3.5 million cubic feet ("cu ft"), with daily produced amounts through the enclosed flare falling within the Environment Agency's permitted limits and parameters.

- EWT results to date indicate that the KL3 oil pool "seen" by HH-1 is commercially viable.* Consequently, following completion of the KL4 EWT, continued test production of a commingled KL3 and KL4 oil stream is planned.

- Other than at weekends, when planning restrictions apply, over 40 road tankers (of 220 barrels crude oil capacity) have exported KL3 crude oil to BP's Hamble oil terminal, with around 500 barrels of stock tank oil remaining at the site for subsequent export. The KL3's Brent quality crude has been sold at prevailing Brent crude oil prices less a small deduction for handling.

- KL4, which flowed at a reported stable dry oil rate of 901 barrels of oil per day over a 4-hour period in 2016, will be flow tested after completion of the current KL3 pressure build-up.

 

George Frangeskides, Alba's Executive Chairman, commented:

 

"It is very encouraging to Alba, as a significant stakeholder in the Horse Hill project, to learn that the 2018 EWT's total test production has now reached almost 14,000 barrels of oil, with over 10,000 barrels to date from the single Kimmeridge KL3 horizon. These production figures mark a significant milestone in the history of the Project."

 

"We now look forward to the forthcoming KL4 EWT programme and the prospect of KL3 and KL4 commingled test production."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

*NB: Alba awaits the Operator's definitive analysis of the commercial viability of the Kimmeridge limestones following the completion of the current testing programme.

 

Qualified Person's Statement

 

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

 

 

For further information please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman +44 20 7264 4366

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray +44 20 7213 0880

 

First Equity Limited (Broker)

Jason Robertson +44 20 7374 2212

 

Yellow Jersey PR (Financial PR/ IR)

Tim Thompson / Harriet Jackson / Henry Wilkinson +44 77 1071 8649

alba@yellowjerseypr.com

 

Glossary

 

°API

a measure of the density of crude oil, as defined by the American Petroleum Institute

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended well test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

 

Alba's Project & Investment Portfolio

 

Mining

 

Amitsoq (Graphite, Greenland): Alba owns a 90 per cent interest in the Amitsoq Graphite Project in Southern Greenland and has an option over the remaining 10 per cent.

 

Clogau (Gold, Wales): Alba owns a 90 per cent interest in Gold Mines of Wales Limited ("GMOW"), the ultimate owner of the Clogau Gold project situated in the Dolgellau Gold Belt in Wales.

 

Inglefield Land (Copper, Cobalt, Gold): Alba owns 100 per cent of mineral exploration licence 2017/40 in north-west Greenland.

 

Limerick (Base Metals, Ireland): Alba owns 100 per cent of the Limerick base metal project in the Republic of Ireland.

 

Melville Bay (Iron Ore, Greenland): Alba is entitled to a 51 per cent interest in mineral exploration licence 2017/41 in Melville Bay, north-west Greenland. The licence area benefits from an existing inferred JORC resource of 67 Mt @ 31.4% Fe.

 

Thule Black Sands (Ilmenite, Greenland): Alba owns 100 per cent of mineral exploration licences 2017/29 and 2017/39 in the Thule region, north-west Greenland.

 

Oil & Gas

 

Brockham (Oil & Gas, UK): Alba has a direct 5 per cent interest in Production Licence 235, which comprises the previously producing onshore Brockham Oil Field.

 

Horse Hill (Oil & Gas, UK): Alba holds a 18.1 per cent interest in Horse Hill Developments Limited, the company which has a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (licences PEDL 137 and PEDL 246 covering a total area of 142.9 km²) in the UK Weald Basin.

 

Web: www.albamineralresources.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLFFVFLSLSLIT
Date   Source Headline
16th Jun 201612:50 pmRNSDirector Shareholding
27th May 201610:30 amRNSResult of AGM
26th May 201610:59 amRNSAmitsoq Project Update
29th Apr 20163:30 pmRNSPublication of Annual Report and Notice of AGM
25th Apr 20167:00 amRNSFinal Results
14th Apr 201611:58 amRNSAmitsoq Project Update
21st Mar 20163:23 pmRNSHolding(s) in Company
21st Mar 20168:00 amRNSHorse Hill Update
16th Mar 20167:00 amRNSBoard and Officer Changes, Change of Reg Office
9th Mar 20167:00 amRNSFurther Update on Horse Hill-1 Flow Test
2nd Mar 20167:00 amRNSFurther Update on Horse Hill-1 Flow Test
1st Mar 20167:00 amRNSFurther Update on Horse Hill-1 Flow Test
26th Feb 20163:18 pmRNSPlacing to raise £525,000
17th Feb 20167:00 amRNSHorse Hill-1, Further Update on Flow Test
16th Feb 20167:00 amRNSHorse Hill-1 Oil Discovery, Update on Flow Test
8th Feb 20167:00 amRNSHorse Hill Flow Test Operations Commence
4th Feb 20167:00 amRNSAmitsoq Project Update
4th Jan 20167:00 amRNSHorse Hill-1 Final Flow Test Consent
16th Dec 201510:02 amRNSResult of GM
30th Nov 20153:06 pmRNSAmitsoq Project Update
30th Nov 201511:15 amRNSHorse Hill-1 Flow Test Consent
30th Nov 20157:00 amRNSPublication of Circular and Notice of GM
9th Nov 20154:58 pmRNSHolding(s) in Company
9th Nov 20154:54 pmRNSHolding(s) in Company
29th Oct 20157:00 amRNSPlacing to raise £160,000
23rd Oct 20153:42 pmRNSCompletion of Acquisition of Horse Hill Interest
19th Oct 201512:18 pmRNSPlacing to raise £385,000
16th Oct 201511:17 amRNSAcquisition of Horse Hill interest - update
6th Oct 20157:53 amRNSOption secured over graphite project in Greenland
25th Sep 20157:00 amRNSConditional Horse Hill Acquisition and Options
26th Aug 20157:05 amRNSSchlumberger Independent Assessment of Horse Hill
21st Aug 20157:00 amRNSHalf Yearly Report
18th Jun 20157:00 amRNSIndependent Assessment of the Horse Hill Licences
12th Jun 20157:00 amRNSPlacing to raise £355,000
8th Jun 20157:00 amRNSDirectorate Change
5th Jun 20157:30 amRNSRestoration - Alba Mineral Resources Plc
5th Jun 20157:00 amRNSIndependent Assessment of Horse Hill-1 Well
4th Jun 20157:30 amRNSSuspension - Alba Mineral Resources Plc
4th Jun 20157:30 amRNSAnnouncement regarding temporary suspension
28th May 201511:18 amRNSResult of AGM
13th May 20152:00 pmRNSHorse Hill Licence Extensions, UK Weald Basin
11th May 20157:00 amRNSUpdate - Horse Hill, UK Weald Basin
5th May 20154:26 pmRNSPublication of Annual Report & Notice of AGM
1st May 20154:16 pmRNSIssue of Equity
30th Apr 20154:38 pmRNSFinal Results
28th Apr 20157:00 amRNSUpdate - Horse Hill, UK Weald Basin
15th Apr 20157:00 amRNSClarification re: 9 April Announcement
10th Apr 201510:01 amRNSHolding(s) in Company
9th Apr 20157:00 amRNSSignificant upgrade on Horse Hill discovery
8th Apr 20152:30 pmRNSCompletion of Acquisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.