The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAfrican Eagle Resources Regulatory News (AFE)

  • There is currently no data for AFE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

14 Jun 2005 07:00

African Eagle Resources PLC14 June 2005 African Eagle Resources plc ENCOURAGING INITIAL DRILLING RESULTS AT MKUSHI PROJECT, ZAMBIA African Eagle Resources ("the Company", ticker AFE) is pleased to announceresults from the first 6 drill holes completed at its Mkushi copper project incentral Zambia. Mineralised intercepts include 12m at 3.2% copper, 33m at 1.9%and 16.7m at 1.5%. African Eagle's Operations Director Chris Davies comments, "These early results are very encouraging, showing substantial widths and goodgrades. They are just the first results from a substantial programme at Mkushi.Drilling is progressing well and we expect further results quite soon andthroughout the coming weeks". African Eagle's Mkushi Project is located 180 km northeast of the capital Lusakaand 160 km southeast of Kitwe, a major mining centre of the Zambian Copperbelt.The project area contains a chain of at least seven known copper deposits alongthe 15 km long Mtuga shear zone. Two of these deposits were mined in the past:Mtuga, which was mined to a depth of 80m from underground during the 1920's andMunshiwemba, which was mined by open pit in the 1960's, but only to a depth of30m. A resource estimate dating from 1990 reported that a global resource of 30million tonnes at 1.2% copper could still exist on the property, containing morethan 350,000 tonnes of copper. African Eagle's current drilling programme isdesigned to check and extend this previous work. The first six holes were drilled at the northernmost deposit, named Coloquo.For a location map, see the Company's web site www.africaneagle.co.uk/projects-mkushi. They are the first of a phase I programme of 23 relativelyshallow diamond drill holes planned at four of the known deposits. Seven moredrill holes have been completed at Zone H and drilling is now underway at Mtuga.The drill samples from these holes are being prepared and submitted for assay. The holes were inclined at 50o and their depths varied between 74m and 119m.All six holes intersected mineralisation. The widths and grades of theintersections were as follows: Drill Hole From (m) Interval (m) Copper % Gold g/t Silver g/tMC1 35.5 16.7 1.5 0.16 4.7including 40.7 7.0 3.2 0.36 10.8and 46.6 1.1 9.7 1.68 40.2MC2 75.6 12.5 0.7MC3 54.0 5.3 0.5and 66.3 9.5 0.8and 87.4 8.7 0.8MC4 42.5 24.3 0.7including 56.9 4.8 2.5 1.9MC5 60.1 33.1 1.9 1.8including 71.2 1.3 6.8 0.12 5.3MC6 51.4 16.8 2.4 0.18 6.2including 49.9 12.2 3.2 0.23 8.6and 57.1 4.8 6.7 0.52 15.7 These copper grades and widths are very promising, and the precious metal assaysshow that both gold and silver are associated with the copper minerals in thesystem. Given the likelihood of high tonnages, the potential value of the goldand silver in the copper concentrate could be quite significant. For example,0.2g/t of gold adds almost 10% to the value of each tonne of 1% copper ore. The drill cores showed that the copper mineralisation at Mkushi occurs in rocksmuch older than the Copperbelt deposits, comprising sheared aplite, pegmatiteand porphyry intrusions within host rocks of the Mkushi Gneiss. This geologicalsetting suggests that the mineralisation may be of porphyry copper style. The Company is also carrying out rotary air core drilling to evaluate thetonnage, grade and mineralogy of copper bearing tailings from the former miningoperations at Munshiwemba and Mtuga. Geophysical surveys including IP andmagnetics covering the entire Mtuga shear zone will also begin shortly with aview to generating additional drill targets. Reports of previous explorationidentified numerous other copper targets, many of which have received little orno assessment to date. African Eagle considers that the exploration potential along the mineralisedMtuga shear is substantial. If the results from the planned programme confirmthe potential, African Eagle will embark on a feasibility study to confirm andexpand on the historical resources. The project area is favourably situated, with a major power line and a goodwater supply within the area and bitumen roads and a rail link nearby. Copperconcentrates could be shipped easily to the nearby smelters in the Copperbelt. In summary, these early results from African Eagle's ambitious 2005 explorationprogramme at Mkushi are promising, showing good grades and thicknesses of coppermineralisation with indications of precious metal credits. Drilling iscontinuing well and the Company expects to receive further assay results overthe coming weeks. John Park ChairmanAfrican Eagle Resources plc 14 June, 2005 For further information Tel MobileJohn Park (Chairman) African Eagle 020 7248 6059 077 7980 1159 or Mark Parker (MD)Leesa Peters or Amanda Harris Conduit PR 020 7618 8708 07979 955 923 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
6th Feb 20074:49 pmRNSDirector Shareholding
31st Jan 20077:01 amRNSProgress Report
28th Dec 20067:00 amRNSTotal Voting Rights
13th Dec 20067:01 amRNSDrilling Report
30th Oct 20067:01 amRNSDep ChairAppt/Drill Results
26th Sep 20068:00 amRNSMkushi 1st Resource Estimate
25th Sep 20067:02 amRNSInterims & Progress Review
8th Aug 20067:01 amRNSEarn In Agreement at Ndola
28th Jul 20067:01 amRNSStrategic Dev Partner
21st Jul 20067:00 amRNSDrilling Report
23rd Jun 200610:22 amRNSDirector Shareholding
12th Jun 20067:00 amRNSDrilling Report
1st Jun 20067:00 amRNSFinal Results
22nd May 20069:58 amRNSIssue of Equity
3rd May 20063:00 pmRNSOption with MDN
24th Apr 20068:33 amRNSMineSite Presentations
20th Apr 20065:26 pmRNSAdditional Listing
7th Apr 20067:00 amRNSDrilling Update
27th Mar 20067:38 amRNSChange of Adviser etc.
21st Mar 20067:01 amRNSUpdated Resource Estimate
15th Mar 20064:14 pmRNSDirector/PDMR Shareholding
24th Feb 20067:01 amRNSIssue of Equity
6th Feb 20067:01 amRNSDrilling Report
3rd Feb 200611:27 amRNSRe Joint Venture
19th Dec 20057:01 amRNSDrilling Report
19th Dec 20057:01 amRNSDrilling Report
14th Dec 20055:23 pmRNSHolding(s) in Company
30th Nov 20057:00 amRNSRe Ndola Project
24th Nov 200511:21 amRNSHolding(s) in Company
23rd Nov 20057:00 amRNSDrilling Report
7th Nov 200512:54 pmRNSHolding(s) in Company
7th Nov 20059:05 amRNSHolding(s) in Company
3rd Oct 20053:44 pmRNSHolding(s) in Company
30th Sep 200512:11 pmRNSHolding(s) in Company
29th Sep 20057:03 amRNSInterim Results
6th Sep 20057:00 amRNSDrilling Report
17th Aug 20054:31 pmRNSHolding(s) in Company
17th Aug 200510:02 amRNSSAR 3-African Eagle Resources
15th Aug 20057:00 amRNSDrilling Report
5th Aug 20057:00 amRNSLicence award
19th Jul 200510:45 amRNSDirector/PDMR Shareholding
4th Jul 20058:25 amRNSDirector/PDMR Shareholding
28th Jun 20057:00 amRNSDrilling Report
14th Jun 20057:00 amRNSDrilling Report
1st Jun 20057:00 amRNSFinal Results
31st May 20057:00 amRNSHolding & warrant exercise
27th May 20057:00 amRNSTanzanian joint venture
23rd May 20057:01 amRNSJoint Venture in Zambia
20th May 20057:00 amRNSChange of Adviser
20th Apr 20057:00 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.