Less Ads, More Data, More Tools Register for FREE

Pin to quick picksActive Energy Regulatory News (AEG)

Share Price Information for Active Energy (AEG)

Share Price is delayed by 15 minutes
Get Live Data
0.095    0.0025 (2.70%)
Bid:
0.09
Ask:
0.10
Spread: 0.01 (11.111%)
Market Cap: £6.46m
AEG Live PriceLast checked at - London Stock Exchange

Intraday Active Energy Share Chart

Operating Update

30 Jul 2008 14:27

RNS Number : 2276A
Cinpart PLC
30 July 2008
 



30 July 2008

Cinpart plc (the "Company")

Operating Update 

The Board of Directors of Cinpart plc ("Cinpart" or "the Company") are today announcing a trading update and information on business development.

Trading Update 

Trading in the first half of 2008 has been difficult and the Company witnessed a decline in sales for the first 6 months of 2008 compared with the first 6 months of 2007. This is caused by several factors; firstly,  the increase in delivery times associated with the change from air freight to the more cost effective sea freight has meant that customers increased their inventory levels during 2007 to compensate. Therefore, Sales in 2007 are estimated to be 12 - 15% higher than normal due to this factor. Secondlythe down turn in the housing market both in United Kingdom ("UK") and in the United States ("US") has led to a decline in the number of gas appliances being manufactured and distributed to those markets.

However, despite the downturn in sales, the Company has continued to improve gross margins primarily through continued cost savings through more efficient production techniques and sourcing of components. Gross margins in the first half of 2008 are expected to be greater than achieved during the same period last year and we anticipate gross margins to increase approximately 3-4%. However, net profit margins have been affected by an increase in overhead costs in the first half of 2008 although actions are underway to reduce these in the second half of the year. Given the above circumstances the company now re-forecasts a full year profit for 2008 similar to that achieved in 2007.

New Business Development 

Looking to the future, the new Board has taken the view that the Company should not only rely on a single operation supplying a specialist product to a limited number of international customers.  It is therefore necessary for the Company to diversify through developing new business activities.

Cinpart has in the recent past established core competencies in electrical equipment manufacture in a low labour cost location being Thailandthe ability to acquire and successfully transfer manufacturing operations from the UK to the Far East. It has also developed a technical team with the skill and expertise to design, develop, and produce gas ignition systems. These skills can also be applied to any type of electrical equipment. The Company has also established a network of reliable suppliers located throughout the Far East. The plant in Thailand is now equipped with the plant and machinery required to produce circuit boards, metal stamped parts, moulded plastic parts, vacuum encapsulation as well a having a work force of over 120 assembly operators experienced in the assembly of electrical equipment.

With these points in mind the Board has expanded its vision from growth through development of the current business and the acquisition of small scale UK based manufacturing operations for transfer to ThailandThe Board considers that the Company can leverage the competencies and resources outlined and to that end has established a new wholly owned subsidiary in the UK named "Component Imports Ltd". As the name suggests, this company will seek to use the Group's sourcing contacts and expanded utilization of the manufacturing facilities in Thailand The sales and technical support office is located in Edinburgh and the company will seek to source any manufactured item that may be required.  The target market is small to medium sized manufacturers that do not have the scale of operation, resources and/or skills to identify suitable offshore manufacturers themselves.

After technical specification reviews and identification of appropriate supplier, Component Imports Ltd will place orders with the selected suppliers, and arrange shipment, import and delivery to the customer.  Customers may either purchase the imported product directly from Component Imports Ltd or alternately pay a percentage fee for the services outlined.

Component Imports Ltd has already signed a confidentiality agreement with representatives of the Midlands Assembly Network.  This is a UK association of complementary engineering companies that offer a wide range of mechanical, electro-mechanical and electronic sub assemblies to manufacturers across the globe. Under this umbrella arrangement Cinpart anticipates that it will obtain sourcing opportunities from the association members. It is also already been asked to secure a contract for the supply of ceramic plaques for a major manufacturer of hot water boilers.  These are to be sourced from a company in China and the first order is expected following completion of samples currently being prepared

Contact

Kevin Baker – Cinpart Plc
+ 662 709 2647
Ray Zimmerman /Jonathan Evans - Zimmerman Adams International Limited
(020) 7060 1760
Stephen Goschalk – Newland Stockbrokers
(020) 7290 2414

NOTES TO EDITORS

Cinpart (Ticker CINP) is listed within the electronic and electrical equipment sector of the AIM market of the London Stock Exchange. The Company manufactures ignition systems for gas appliances in Thailand and sells to manufacturers of stoves water heaters and boilers throughout the world. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZGGFNFGKGRZM
Date   Source Headline
3rd Jun 20264:29 pmRNSHolding(s) in Company
3rd Jun 20267:00 amRNS-REngagement with Bahrain Economic Development Board
2nd Jun 202611:20 amRNSFirst Month of Trading at Ghummud Delivers Revenue
22nd May 20262:34 pmRNS-ROperational Update on Initial 8 MVA UAE Deployment
14th May 20264:44 pmRNSHolding(s) in Company
12th May 20265:01 pmRNSHolding(s) in Company
11th May 20265:05 pmRNSHolding(s) in Company
11th May 20263:13 pmRNSHolding(s) in Company
8th May 20269:27 amRNSHolding(s) in Company
7th May 20268:31 amRNSHolding(s) in Company
7th May 20267:00 amRNS-RUAE Crypto Mining Licence & Strategic Agreement
5th May 20269:06 amRNSHolding(s) in Company
5th May 20267:00 amRNSAcceleration of Revenue at Ghummud Site
30th Apr 20265:15 pmRNSResult of Placing and Total Voting Rights
30th Apr 20265:01 pmRNSProposed Placing to raise approximately £1.3m
29th Apr 20264:23 pmRNSHolding(s) in Company
28th Apr 202611:49 amRNSHolding(s) in Company
28th Apr 20267:00 amRNSUpdate on Collaboration with Bitdeer Technologies
24th Apr 20267:00 amRNSLOI signed with Bitdeer Middle East Technology Ltd
23rd Apr 20267:00 amRNSHeads of Terms Signed for Taweela Grid Connection
21st Apr 202611:27 amRNSHolding(s) in Company
21st Apr 202611:11 amRNSHolding(s) in Company
21st Apr 202611:10 amRNSHolding(s) in Company
20th Apr 20267:00 amRNSUAE Operation Update Early Energisation at Ghummud
9th Apr 20267:00 amRNSCompletion of Ghummud Acquisition, Issue of Equity
2nd Apr 20267:00 amRNSLoan and Debt Conversion with Zen Ventures
31st Mar 20267:00 amRNS-ROperational Deployment & UAE Expansion Update
17th Mar 20267:00 amRNS-RAcquisition of Grid Infrastructure Asset
17th Mar 20267:00 amRNS-RAcquisition of Grid Infrastructure Asset
10th Mar 20267:00 amRNS-RProposed Acquisition of Ghummud Asset
9th Mar 20267:00 amRNSUAE Project Development Update, Pipeline Expansion
12th Feb 20269:16 amRNSRDIA Approval in the Kingdom of Saudi Arabia
29th Jan 20267:22 amRNS-RNon-binding Heads of Terms Signed
26th Jan 20267:00 amRNS-RProposed UAE Joint Venture
26th Jan 20267:00 amRNSHolding(s) in Company
21st Jan 20261:59 pmRNSHolding(s) in Company
21st Jan 20267:00 amRNSHolding(s) in Company
20th Jan 20267:00 amRNSStrategic Entry into Saudi Arabia via MISA
15th Jan 20262:27 pmRNSOTC Markets ID, Ticker and US IR Appointment
14th Jan 20266:05 pmRNSHolding(s) in Company
13th Jan 20267:00 amRNSBusiness Update
18th Dec 20257:00 amRNS-RProgress Update: CoalSwitch® Commercial Deployment
16th Dec 20257:00 amRNSOptimisation of Digital Infrastructure Capacity
15th Dec 20257:00 amRNS-RCoalSwitch® Strategy and Collaboration with ICE
3rd Dec 202510:06 amRNS25-Year Solar Power Purchase Agreement Signed
31st Oct 20252:17 pmRNSHolding(s) in Company
31st Oct 20252:17 pmRNSHolding(s) in Company
28th Oct 202511:52 amRNSHolding(s) in Company
23rd Oct 20259:50 amRNSHolding(s) in Company
20th Oct 20257:00 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.