The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 69.00
Bid: 68.00
Ask: 70.00
Change: -1.00 (-1.43%)
Spread: 2.00 (2.941%)
Open: 69.50
High: 69.50
Low: 69.00
Prev. Close: 70.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zafar mine design complete and construction starts

21 Feb 2023 07:00

RNS Number : 5010Q
Anglo Asian Mining PLC
21 February 2023
 

21 February 2023

Anglo Asian Mining PLC

Mine Design completed and start of construction at Zafar

 

Anglo Asian Mining PLC ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to announce it has completed a Mining Scoping Study (the "Mining Study") for the Zafar underground mine. Development work and the construction of two portals has also started.

 

The Mining Study included a review of geotechnical conditions, optimal mining methods and mine scheduling and design. The mine will be constructed using sub-level caving ("SLC") supplemented by sub-level open stoping ("SLOS") on the margins of the mineralised zone. A primary haulage decline to access the ore body and a parallel ventilation decline are being constructed. The ventilation decline can be used as an escapeway which reduces risk. A schematic of the proposed design is shown in Figure 1.

 

The Zafar mine has JORC Mineral Resources of 28,000 tonnes of copper, 73,000 ounces of gold and 36,000 tonnes of zinc. The design is based on ore production of 700,000 tonnes per annum and a 0.5 per cent. copper equivalent cut-off grade.

 

The Mining Study was compiled by Mining Plus Pty Ltd and is available at https://www.angloasianmining.com/operations/zafar/ andhttp://www.rns-pdf.londonstockexchange.com/rns/5010Q_1-2023-2-20.pdf

 

Figure 1: Isometric view of the Zafar mine- dual decline mine design. Looking north-east

Construction has started on the two portals which are about 850 metres away from the Company's existing processing facilities and about 1,000 metres from the mineralisation with a design gradient of 1:11. Earthworks for the twin portals, power and compressor areas and a large laydown area for equipment have been completed. The Company is in the process of establishing a mine office, a workshop and heavy equipment maintenance facilities. Images of the portals and the surrounding area are shown in Figure 2.

Figure 2: Images of the portal and surrounding area (see key below)

A: Zafar portal area and building for workshop facilities

B: Location of twin portals

C: Portals under construction

D: Building housing the workshop

 

The Mining Study has modelled the costs for the mine. Analysis showed a positive net present value for the project. Sensitivity studies using higher than expected mining costs also produced a positive net present value.

 

Anglo Asian Vice-President, Stephen Westhead commented: "Completing the study provides confidence in our ability to profitably extract an initial 2 million tonnes of ore from the total 5.5 million tonnes as referenced in the JORC report. Once nearing the orebody, underground drilling will be conducted to further evaluate the growth potential of this copper-zinc deposit. The team look forward to updating the market on the developments at Zafar and its contribution to future production."

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014, which was incorporated into UK law by the European Union (Withdrawal) Act 2018, until the release of this announcement.

 

For further information please contact:

 

Anglo Asian Mining plc

Reza Vaziri, Chief Executive Officer

Tel: +994 12 596 3350

Bill Morgan, Chief Financial Officer

Tel: +994 502 910 400

Stephen Westhead, Vice President

Tel: +994 502 916 894

SP Angel Corporate Finance LLP (Nominated Adviser and Broker)

Ewan Leggat

Adam Cowl

Tel: +44 (0) 20 3470 0470

Hudson Sandler (Financial PR)

Charlie Jack

Harry Griffiths

Tel: +44 0) 20 7796 4133

 

Competent Person Statement

The information in the announcement that relates to exploration results, minerals resources and ore reserves is based on information compiled by Dr Stephen Westhead, who is a full-time employee of Anglo Asian Mining with the position of Vice-President, who is a Fellow of The Geological Society of London, a Chartered Geologist, Fellow of the Society of Economic Geologists, Fellow of the Institute of Materials, Minerals and Mining and a Member of the Institute of Directors.

 

Stephen Westhead has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Stephen Westhead consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

 

Stephen Westhead has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a "competent person" as defined by the AIM rules. Stephen Westhead has reviewed the mineral resources included in this announcement.

 

Notice to editors

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in south-west Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company produced 57,618 gold equivalent ounces ("GEOs") for the year ended 31 December 2022.

 

In December 2021, the Company undertook a private placement which acquired 19.8 per cent. of Libero Copper & Gold Corporation ("Libero"). Libero is listed on the TSX Venture Exchange in Canada and owns, or has the option to acquire, several copper exploration properties in North and South America, including Mocoa in Colombia, one of the world's largest undeveloped copper-molybdenum resources. Two further follow-on investments have been made in Libero to maintain the Company's shareholding at 19.8 per cent.

 

On 5 July 2022, the Parliament of Azerbaijan ratified amendments to the Company's Production Sharing Agreement, which granted it legal title to three additional concessions with a combined area of 882 square kilometres, including the Garadagh porphyry copper deposit, with a Soviet classified resource of over 300,000 tonnes of copper. https://www.angloasianmining.com/

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
PFUPPUGCPUPWGBU
Date   Source Headline
22nd May 20157:00 amRNSDirector Loan
14th Apr 20157:00 amRNSQ1 2015 Gedabek Update
19th Mar 201511:54 amRNSDirector Dealing
12th Mar 20152:37 pmRNSDirector Dealing
9th Mar 20158:40 amRNSFlotation Plant Update - Gedabek Mine Azerbaijan
14th Jan 20157:15 amRNSQ4 2014 and FY 2014 Production Update Gedabek
6th Jan 20151:35 pmRNSDirector Share Dealing
20th Nov 20143:32 pmRNSFlotation Plant Construction and Production Update
19th Nov 20147:00 amRNSIncrease in JORC Ore Reserve at Gedabek mine
15th Oct 201410:30 amRNSQ3 2014 Production and Operational Update
23rd Sep 20147:00 amRNSInterim Results
18th Jul 20147:00 amRNSQ2 2014 and H1 2014 Operations Update
30th Jun 20142:39 pmRNSResult of AGM
30th Jun 20147:00 amRNSAGM Statement
5th Jun 20143:44 pmRNS29% Increase in Resource - Gedabek (Replacement)
5th Jun 20147:00 amRNS29 per cent Increase in Resource at Gedabek
4th Jun 20143:58 pmRNSPosting of Report and Accounts and Notice of AGM
28th May 20147:00 amRNSFinal Results
22nd May 20147:00 amRNSLoan Agreement
14th May 20144:41 pmRNSSecond Price Monitoring Extn
14th May 20144:35 pmRNSPrice Monitoring Extension
14th May 20142:30 pmRNSUpdate re Final Results
6th May 20147:01 amRNSNew Copper Sales Contract - Gedabek Azerbaijan
17th Apr 20148:30 amRNSGedabek and Gosha Q1 2014 Update
28th Feb 20149:36 amRNSDirector's Shareholding
20th Feb 20143:10 pmRNSDirector's Shareholding
31st Jan 20147:00 amRNSTotal Voting Rights
23rd Jan 20149:33 amRNSDirector's Dealing and Issue of Equity
15th Jan 20147:00 amRNSQ4 Operations and FY 2013 Update for Gedabek Mine
8th Jan 20147:00 amRNSHighly Positive Exploration Update at Gedabek
20th Dec 20137:00 amRNSGedabek Gold Mine Update Azerbaijan
2nd Dec 20137:00 amRNSNew High Grade Gold Discovered at Gedabek Mine
18th Nov 20137:00 amRNSAppointment of Director of Geology
21st Oct 20139:00 amRNSHolding(s) in Company
16th Oct 20137:34 amRNSInvestor Evenings - Dublin and Manchester
11th Oct 201310:32 amRNSGedabek Resource Increase to 1.12 Moz of gold
10th Oct 20137:00 amRNSRecord Gold Production Q3 2013 - Gedabek
9th Oct 20137:00 amRNSDebt Refinancing - USD37M Loan Facility
26th Sep 20137:00 amRNSInterim Results
11th Sep 20137:00 amRNSGedabek & Gosha Gold Mining Update Azerbaijan
11th Jul 20137:00 amRNSQ2 2013 Gedabek Operations Update
8th Jul 20137:00 amRNSCopper Sales Update, Gedabek
1st Jul 20139:40 amRNSResult of AGM
28th Jun 20137:00 amRNSAGM Statement
5th Jun 20135:49 pmRNSNotice of AGM and Posting of R&A
5th Jun 20137:00 amRNSAgitation Leaching Plant - Full Commissioning
28th May 20137:00 amRNSFinal Results
22nd May 20137:00 amRNSAnalyst Conference Call for Final Results
10th Apr 20137:00 amRNSQ1 2013 Production and Operations Update - Gedabek
6th Feb 20137:00 amRNSCompany Gold Production Update, Azerbaijan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.