Watch LIVE the focusIR May Investor webinar with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 69.00
Bid: 68.00
Ask: 70.00
Change: -1.00 (-1.43%)
Spread: 2.00 (2.941%)
Open: 69.50
High: 69.50
Low: 69.00
Prev. Close: 70.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant copper identified at Xarxar

13 Mar 2023 07:09

RNS Number : 7222S
Anglo Asian Mining PLC
13 March 2023
 

13 March 2023

Anglo Asian Mining plc

Significant copper mineralisation identified at Xarxar

Development of Geological Block Model and Open Pit Mining Study are underway

 

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer primarily focused in Azerbaijan, is pleased to announce it has identified significant copper mineralisation at Xarxar. An initial exploration model of the mineralisation has been prepared. A geological block model and open pit mining study are currently being developed and will be published in the coming weeks.

 

Anglo Asian has identified significant mineralisation at the Xarxar mineral deposit by an in-depth review and verification of data acquired from AzerGold CJSC and in-house geological field work. This gives the Company confidence that the Xarxar deposit contains significant copper mineralisation.

 

AzerGold CJSC drilled 15 core drill holes at Xarxar with a total length of 4,923 metres. Three of the drill holes (totalling 1,140 metres) had been sampled and assayed by AzerGold CJSC. Geological core logging, sampling and assaying of the remaining drill core has been conducted by Anglo Asian. The Company has also reviewed other information acquired from AzerGold CJSC which included geochemical and geophysical data together with maps and interpretative reports.

 

The Company commenced a core drilling programme at Xarxar immediately following its acquisition. It has also constructed a portal and is developing an exploration tunnel towards the ore body.

 

Anglo Asian Vice-President, Stephen Westhead commented: "We are very excited about the acquisition of Xarxar and the potential copper that it can bring to the Anglo Asian production pipeline. Surface drilling and underground exploration tunnelling is ongoing, and the Company looks forward to reporting the results soon. Metallurgical testwork is under way to assess the processing options. The Xarxar Contract Area has very good exploration potential with both known mineral occurrences and targets identified by the previously conducted ZTEM survey." 

About the Xarxar Contract Area

The Xarxar contract area borders the Gedabek contract area to the north, east and west and the two contract areas are contiguous. Xarxar hosts the Xarxar deposit and multiple other mineral occurrences. A map of the Xarxar and Gedabek contract areas is shown in figure 1.

 

 

Figure 1: Gedabek and Xarxar Contract Area boundaries showing the position of ongoing projects.

An initial exploration model of the mineralisation has been prepared which will be dynamically updated. A section through the exploration model showing the geometry of the Xarxar deposit is exhibited in figure 2.

 

Figure 2: Section through the 3D exploration model of the Xarxar deposit

The mineralisation including the recent drilling is hosted within a zone that is over 500 metres in the broadly east-west direction by about 290 metres in the north-south direction. Mineralisation is exposed at surface in some areas, but the upper contact ranges from 25 metres to 115 metres from the surface and continues to a depth of over 500 metres. The model is based on a cut-off of 0.2 per cent. copper.

 

The structural positioning of the mineral-forming process was largely controlled by a north-east striking fault system, where a 300 x 300 metre quartz-diorite-porphyry stock is in direct contact with the metasomatite host rock.

 

The mineralisation is copper-dominant and comprises mainly oxides and secondary sulphides, with minerals such as malachite, azurite, pyrite, chalcocite and bornite, together with some primary chalcopyrite as common minerals in the deposit, and minor barite and magnetite minerals are also recorded. The main copper mineralisation lenses are located in the central part of the Xarxar deposit, with approximate east-west orientations. The depth of oxide, transition and sulphide zones is being studied.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014, which was incorporated into UK law by the European Union (Withdrawal) Act 2018, until the release of this announcement.

 

For further information please contact:

 

Anglo Asian Mining plc

Reza Vaziri, Chief Executive Officer

Tel: +994 12 596 3350

Bill Morgan, Chief Financial Officer

Tel: +994 502 910 400

Stephen Westhead, Vice President

Tel: +994 502 916 894

SP Angel Corporate Finance LLP (Nominated Adviser and Broker)

Ewan Leggat

Adam Cowl

Tel: +44 (0) 20 3470 0470

Hudson Sandler (Financial PR)

Charlie Jack

Harry Griffiths

 

Tel: +44 0) 20 7796 4133

 

Competent Person Statement

The information in the announcement that relates to exploration results, minerals resources and ore reserves is based on information compiled by Dr Stephen Westhead, who is a full-time employee of Anglo Asian Mining with the position of Vice-President, who is a Fellow of The Geological Society of London, a Chartered Geologist, Fellow of the Society of Economic Geologists, Fellow of the Institute of Materials, Minerals and Mining and a Member of the Institute of Directors.

 

Stephen Westhead has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Stephen Westhead consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

 

Stephen Westhead has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a "competent person" as defined by the AIM rules. Stephen Westhead has reviewed the mineral resources included in this announcement.

 

Notice to editors

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in south-west Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company produced 57,618 gold equivalent ounces ("GEOs") for the year ended 31 December 2022.

 

In December 2021, the Company undertook a private placement which acquired 19.8 per cent. of Libero Copper & Gold Corporation ("Libero"). Libero is listed on the TSX Venture Exchange in Canada and owns, or has the option to acquire, several copper exploration properties in North and South America, including Mocoa in Colombia, one of the world's largest undeveloped copper-molybdenum resources. Two further follow-on investments have been made in Libero to maintain the Company's shareholding at 19.8 per cent.

 

On 5 July 2022, the Parliament of Azerbaijan ratified amendments to the Company's Production Sharing Agreement, which granted it legal title to three additional concessions with a combined area of 882 square kilometres, including the Garadagh porphyry copper deposit, with a Soviet classified resource of over 300,000 tonnes of copper. https://www.angloasianmining.com/

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGPUQUWUPWUMW
Date   Source Headline
11th Oct 20187:00 amRNSQ3 2018 Production and Operations Review
8th Oct 20187:00 amRNSExercise of Share Options and Issue of Equity
19th Sep 20187:00 amRNSInterim Results and Maiden Dividend
18th Sep 20187:00 amRNSGedabek Open Pit - JORC Resources and Reserves
17th Sep 20187:00 amRNSH1 Geological Exploration Activities and Results
13th Sep 20187:00 amRNSAirborne Geophysical Survey at Gedabek
5th Sep 20189:30 amRNSCorporate Presentation and Net Cash
3rd Sep 201811:30 amRNSTechnical Presentation and Paper
29th Aug 20188:30 amRNSApproval of Capital Reduction by the Court
31st Jul 20187:00 amRNSTotal Voting Rights
30th Jul 201811:30 amRNSResult of General Meeting
19th Jul 20185:09 pmRNSExercise of Share Options and Issue of Equity
17th Jul 20187:00 amRNSQ2 & H1 2018 Production and Operations Review
13th Jul 201810:00 amRNSPosting of Circular and Notice of General Meeting
5th Jul 201811:00 amRNSPDMR Exercise of Share Options and Issue of Equity
29th Jun 20184:15 pmRNSResult of AGM
29th Jun 20187:00 amRNSAGM Statement
7th Jun 20189:30 amRNSNotice of General Meeting
24th May 20187:00 amRNSFinal Results
3rd May 201811:16 amRNSNew Corporate Presentation
16th Apr 20187:25 amRNSQ1 2018 Production and Operations Review
3rd Apr 201812:00 pmRNSRepayment of Director Loan
26th Mar 20189:00 amRNS2017 Exploration Activities & Results
13th Mar 20187:00 amRNSLaunch of 2018 Exploration Programme
12th Feb 20187:00 amRNS$15 million Syndicated 2-year 7% Loan Facility
6th Feb 201812:30 pmRNSUpdated Corporate Presentation
6th Feb 20187:00 amRNSFY2018 Production Guidance of 78,000 - 84,000 GEOs
16th Jan 20184:40 pmRNSSecond Price Monitoring Extn
16th Jan 20184:35 pmRNSPrice Monitoring Extension
16th Jan 20187:00 amRNSQ4 & FY 2017 Production and Operations Review
10th Jan 20184:40 pmRNSSecond Price Monitoring Extn
10th Jan 20184:35 pmRNSPrice Monitoring Extension
10th Jan 20182:05 pmRNSSecond Price Monitoring Extn
10th Jan 20182:00 pmRNSPrice Monitoring Extension
10th Jan 20181:13 pmRNSUpdate re Director Loan
26th Oct 20177:00 amRNSExploration and Development Activity Update
19th Oct 201710:15 amRNSBritish Ambassador to Azerbaijan visits Gedabek
13th Oct 20177:00 amRNSQ3 2017 Production Update
2nd Oct 20177:00 amRNSCompletion of Ugur JORC Resource
21st Sep 20177:00 amRNSInterim Results
13th Sep 20178:00 amRNSCommencement of Production from Ugur Open Pit Mine
11th Sep 20179:47 amRNSPresentation at Conference of Metallurgists
14th Aug 20177:00 amRNSUgur Gold Deposit - JORC Resource and Reserves
31st Jul 20178:30 amRNSTotal Voting Rights
27th Jul 20174:30 pmRNSDirector Dealing
27th Jul 20177:00 amRNSIssue of Equity and Director Shareholding
24th Jul 201710:33 amRNSUgur Gold Deposit Development & Gedabek Update
17th Jul 20177:00 amRNSQ2 and H1 2017 Production and Operations Update
3rd Jul 20177:00 amRNSResult of AGM
30th Jun 20177:00 amRNSAGM Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.