The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 70.00
Bid: 69.00
Ask: 71.00
Change: -1.00 (-1.41%)
Spread: 2.00 (2.899%)
Open: 71.50
High: 72.50
Low: 70.00
Prev. Close: 71.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q4 and FY 2021 Operations and production review

13 Jan 2022 07:00

RNS Number : 2768Y
Anglo Asian Mining PLC
13 January 2022
 

 

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

13 January 2022

 

Anglo Asian Mining plc

Q4 and FY 2021 Operations and production review

FY 2021 Production of 64,610 gold equivalent ounces

Strategic investment in Libero Copper & Gold Corporation - first investment outside of Azerbaijan

Ore from Vejnaly stockpiles processed at Gedabek

 

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer primarily operating in Azerbaijan, is pleased to provide an operations and production review for the three and twelve months to 31 December 2021 ("Q4 2021" and "FY 2021" respectively).

 

Note that all references to "US$" are to United States dollars and "CAN$" are to Canadian dollars. An exchange rate of US$1 = CAN$1.29 has been used throughout.

 

Overview

· FY 2021 production within guidance of 64,610 gold equivalent ounces ("GEOs") (FY 2020: 67,249 GEOs)

· Private placement to acquire a strategic interest of 19.9 per cent. in Libero Copper & Gold Corporation ("Libero") completed in December 2021:

o 9.9 per cent. acquired immediately upon closing the subscription agreement for CAN$2.8 million (US$2.2 million)

o 10.0 per cent. providing a total of 19.9 per cent. to be acquired for CAN$3.5 million (US$2.7 million) following approval of the TSX Venture Exchange expected in Q1 2022

· Assessment of the Vejnaly contract area commenced in December 2021:

o A technical study is underway to determine the commercial viability of commencing production from the existing Vejnaly underground mine in H2 2022

o 10,957 dry metric tonnes of stockpiled ore grading 3.91 grammes per tonne of gold and 0.27 per cent. copper were transported to Gebabek, and processed by agitation leaching, in December 2021 with gold recoveries of 95 per cent. producing 1,308 ounces of gold

· Cash of US$37.5 million at 31 December 2021 (30 September 2021: US$30.9 million)

o Free cash flow for FY 2021 within the guidance of US$10 million to US$15 million given in September 2021

o Interim dividend for 2021 totalling US$5.2 million paid in November 2021

o CAN$2.8 million (US$2.2 million) paid for 9.9 per cent. of Libero in December 2021

 

Anglo Asian CEO Reza Vaziri commented: 

"I am very pleased with Anglo Asian's operating performance in 2021, comfortably meeting our guidance for the year with total production of 64,610 gold equivalent ounces. This was achieved despite the logistical difficulties and other disruption due to the COVID-19 pandemic in the first half of the year.

 

"It has been an exciting year for the Company. We are developing new opportunities to grow both in Azerbaijan and abroad, with the three additional contract areas in Azerbaijan, and our recent strategic investment in Libero Copper & Gold Corporation.

 

We enter 2022 in a strong financial position and will continue to execute our planned growth strategy. I look forward to providing an update on our technical study of the Vejnaly underground mine, with a view to commencing production later this year."

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014, which was incorporated into UK law by the European Union (Withdrawal) Act 2018, until the release of this announcement.

 

For further information please contact:

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Bill Morgan

Anglo Asian Mining plc

Tel: +994 502 910 400

Stephen Westhead

Anglo Asian Mining plc

Tel: +994 502 916 894

Ewan Leggat

Adam Cowl

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Tel: +44 (0) 20 3470 0470

Charlie Jack

Elfie Kent

Hudson Sandler

Tel: +44(0) 20 7796 4133

 

 

Notes to editors

 

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company produced 64,610 gold equivalent ounces ("GEOs") for the year ended 31 December 2021.

 

In September 2021, the Company announced a transaction with the Government of Azerbaijan which grants it three additional concessions with a combined area of 882 square kilometres, including the Garadagh porphyry copper deposit, with a Soviet classified resource of over 300,000 tonnes of copper. The transaction is subject to ratification by the parliament of Azerbaijan.

 

In December 2021, the Company completed a private placement to acquire 19.9 per cent. of Libero Copper & Gold Corporation ("Libero"). Libero is listed on the TSX Venture Exchange in Canada and owns, or has the option to acquire, several copper exploration properties in North and South America, including Mocoa in Colombia, one of the world's largest undeveloped copper-molybdenum resources.

https://www.angloasianmining.com/

 

Production overview

 

Q4 2021

· Total production of 15,949 GEOs (Q4 2020: 16,593 GEOs)

· Gold production of 11,589 ounces (Q4 2020: 13,534 ounces):

o 10,561 ounces contained within gold doré

o 16 ounces from sulfidisation, acidification, recycling and thickening ("SART") processing

o 1,012 ounces from flotation processing

· Copper production totalled 743 tonnes (Q4 2020: 696 tonnes):

o 193 tonnes from SART processing

o 550 tonnes from flotation processing

· Silver production totalled 38,673 ounces (Q4 2020: 32,979 ounces):

o 5,430 ounces contained within gold doré

o 16,414 ounces from SART processing

o 16,829 ounces from flotation processing

 

FY 2021

· Total production of 64,610 GEOs (FY 2020: 67,249 GEOs)

· Gold production of 48,680 ounces (FY 2020: 56,864 ounces)

· Copper production totalled 2,649 tonnes (FY 2020: 2,591 tonnes)

· Silver production totalled 154,564 ounces (FY 2020: 122,962 ounces)

 

Sales

· Q4 2021 gold bullion sales of 13,153 ounces at an average of US$1,825 per ounce (Q4 2020: 18,072 ounces sold at an average of US$1,884 per ounce)

· Q4 2021 copper concentrate shipments totalled 4,132 dry metric tonnes ("dmt") with a sales value of US$8.9 million (excluding Government of Azerbaijan profit share) (Q4 2020: 4,211 dmt with a sales value of US$6.3 million)

 

Company financials

· Cash of US$37.5 million at 31 December 2021 (30 September 2021: US$30.9 million)

o Free cash flow for FY 2021 within the guidance of US$10 million to US$15 million given in September 2021

o Interim dividend for 2021 of US$5.2 million paid in November 2021

o CAN$2.8 million (US$2.2 million) paid for 9.9 per cent. of Libero in December 2021

 

Strategic investment of 19.9 per cent. in Libero Copper & Gold Corporation

 

In December 2021, the Company completed a Private Placement to acquire 19.9 per of Libero. Libero is listed on the TSX Venture Exchange ("TSXV") in Canada (ticker: LBC). 9.9 per cent. of Libero was acquired immediately with the remaining 10 per cent. to be acquired following the approval of the TSXV which is expected in Q1 2022. The total cost of the acquisition will be CAN$6.3 million (US$4.9 million).

 

Libero has an extremely attractive portfolio of exploration assets in mining-friendly jurisdictions in North and South America including Mocoa in Colombia, Big Bulk and Big Red in British Columbia, Canada, and Esperanza in Argentina. Mocoa is one of the world's largest undeveloped Copper-Molybdeum resources. Libero has a very experienced and seasoned board of directors and management team. Its Executive Chairman is Ian Slater, who has founded numerous companies and been involved in the Mining industry for 25 years. The Company's management team is led by Ian Harris, Chief Executive Officer and President, who is a mining engineer with over 20 years' experience leading mining projects worldwide including over 10 years working and living in South America. Further information can be found at https://www.liberocopper.com/

 

Anglo Asian has been granted a comprehensive package of participation rights over future share issues of Libero to avoid any dilution of its shareholding. It has also been granted "piggyback" rights, which become effective on the fifth anniversary of the initial subscription and will enable the Company to sell its shares to the public as a secondary offering should Libero sell future shares by way of a prospectus. Anglo Asian will appoint a director to the board of Libero. A technical committee, which will include one Anglo Asian appointee, is being formed to determine the future direction of Libero's exploration programme.

Assessment of the Vejnaly contract area and processing of ore stockpiles

 

Members of the Company's senior management including Reza Vaziri, Chief Executive Officer and President, travelled to Zangilan in early December 2021 to assess its newly-restored Vejnaly contract area, including the existing underground mine at the site.

 

Initial investigations of the site have been carried out and surveying of ore stockpiles has been completed. A technical study is underway to determine the commercial viability of commencing production from the existing underground mine in the second half of 2022. The handover of the surface properties and infrastructure in the Vejnaly contract area and related documents etc. from the Government of Azerbaijan is also ongoing. A contract has recently been signed with a de-mining company and work has already started to find and destroy any land mines, or other abandoned munitions from the recent conflict, on the access road to the mine, in the surrounding areas and the underground mine itself, to ensure safety of the whole area prior to the start-up of operations.

 

10,957 dry metric tonnes of stockpiled Vejnaly ore grading 3.91 grammes per tonne of gold and 0.27 per cent. copper were transported to Gebabek and processed by agitation leaching in December 2021 with gold recoveries of 95 per cent. producing 1,308 ounces of gold.

 

Final Mineral Resource estimation for Zafar

 

The final Mineral Resource estimation for Zafar deposit is now scheduled to be released in Q1 2022.

 

Gedabek - mining, detailed production and sales

 

Anglo Asian continued to mine its existing sites during the period following the exhaustion of the Ugur open pit in late 2020, in line with the previously announced guidance for the year. Ore stockpiled at Vejnaly was also transported and processed at Gedabek in Q4 2021.

 

The Company mined the following amounts and grades of ore in the 12 months to 31 December 2021:

 

9 months to

30 September 2021

3 months to

31 December 2021

12 months to

 31 December 2021

Mine

Ore mined

Average

gold grade

Ore mined

Average

gold grade

Ore mined

Average

gold grade

(tonnes)

(g/t)

(tonnes)

(g/t)

(tonnes)

(g/t)

Open pit

1,290,670

0.78

525,187

0.64

1,815,857

0.74

Gadir - u/g

85,333

1.96

30,610

1.76

115,943

1.91

Gedabek - u/g

154,026

1.52

94,766

1.25

248,792

1.42

Total

1,530,029

0.92

650,563

0.78

2,180,592

0.80

 

 

The Company processed the following amounts and grades of ore by leaching for FY 2020 and 2021:

 

Quarter ended

Ore processed

Gold grade of ore processed

Heap leach pad crushed ore

(tonnes)

Heap leach pad ROM

ore

(tonnes)

Agitation leaching

plant*

(tonnes)

Heap leach pad crushed ore

(g/t)

Heap leach pad ROM

ore

(g/t)

Agitation leaching

plant*

(g/t)

31 March 2020

132,731

258,121

163,379

0.84

0.49

2.53

30 June 2020

139,752

134,675

161,079

0.79

0.44

1.95

30 September 2020

168,945

149,031

181,200

0.87

0.50

2.09

31 December 2020

107,852

172,206

177,487

0.89

0.59

1.81

FY 2020

549,280

714,033

683,145

0.85

0.51

2.17

31 March 2021

110,612

258,097

154,373

0.90

0.61

1.92

30 June 2021

154,619

177,369

164,288

0.81

0.59

1.64

30 September 2021

154,112

194,816

171,029

0.79

0.51

1.65

31 December 2021

113,623

309,374

151,701

0.68

0.49

1.53

FY 2021

532,966

939,656

641,391

0.80

0.54

1.68

 

* includes previously heap leached ore.

 

The Company processed the following amounts of ore and contained metal by flotation for FY 2020 and 2021:

Quarter ended

Ore processed

Gold content

Silver content

Copper content

(tonnes)

(ounces)

(ounces)

(tonnes)

31 March 2020

126,354

1,860

28,831

622

30 June 2020

132,848

1,459

18,354

762

30 September 2020

123,440

1,565

15,530

741

31 December 2020

110,772

859

8,660

693

FY 2020

493,414

5,743

71,375

2,818

31 March 2021

111,060

920

15,782

652

30 June 2021

116,910

1,251

23,870

596

30 September 2021

121,283

1,231

19,939

519

31 December 2021

129,384

1,856

28,480

762

FY 2021

478,637

5,258

88,071

2,529

 

 

The following table summarises gold doré production and sales at Gedabek for FY 2020 and 2021:

 

Gold produced*

(ounces)

Silver

produced*

(ounces)

Gold sales**

(ounces)

Gold Sales price

($/ounce)

Quarter ended

31 March 2020

15,034

3,852

11,236

1,577

30 June 2020

11,455

3,562

12,743

1,713

H1 2020

26,489

7,414

23,979

1,649

30 Sept 2020

14,945

5,487

6,599

1,947

31 Dec 2020

13,276

4,614

18,072

1,884

H2 2020

28,221

10,101

24,671

1,901

FY 2020

54,710

17,515

48,650

1,777

31 March 2021

11,541

4,916

5,635

1,697

30 June 2021

11,789

5,921

13,947

1,808

H1 2021

23,330

10,837

19,582

1,776

30 Sept 2021

12,314

5,473

6,828

1,815

31 Dec 2021

10,561

5,430

13,153

1,825

H2 2021

22,875

10,903

19,981

1,821

FY 2021

46,205

21,740

39,563

1,799

Note

 

* including Government of Azerbaijan's share

** excluding Government of Azerbaijan's share

 

The following table summarises copper concentrate production from both the Company's SART and flotation plants at Gedabek for FY 2020 and 2021:

 

Concentrate

Copper

Gold

Silver

production*

content*

content*

content*

2020

(dmt)

(tonnes)

(ounces)

(ounces)

Quarter ended 31 March

SART processing

221

114

8

12,895

Flotation

2,773

445

825

17,895

Total

2,994

559

833

30,790

Quarter ended 30 June

SART processing

267

151

7

10,857

Flotation

2,904

497

573

9,542

Total

3,171

648

580

20,399

Quarter ended 30 Sept

SART processing

301

165

7

17,148

Flotation

2,965

523

476

8,416

Total

3,266

688

483

25,564

Quarter ended 31 December

SART processing

421

196

15

21,279

Flotation

2,929

500

243

7,086

Total

3,350

696

258

28,365

2021

Quarter ended 31 March

SART processing

473

276

13

19,850

Flotation

2,375

362

353

10,599

Total

2,848

638

366

30,449

Quarter ended 30 June

SART processing

512

301

12

22,428

Flotation

2,652

394

539

15,216

Total

3,164

695

551

37,644

Quarter ended 30 Sept

SART processing

503

265

13

19,526

Flotation

2,600

308

517

11,913

Total

3,103

573

530

31,439

Quarter ended 31 December

SART processing

338

193

16

16,414

Flotation

3,584

550

1,012

16,829

Total

3,922

743

1,028

33,243

Note

 * including Government of Azerbaijan's share.

Certain amounts for SART and flotation production may differ to those previously disclosed due to final reconciliation of production.

 

The following table summarises total copper concentrate production and sales for FY 2020 and 2021. Note that sales of concentrates are initially recorded at provisional amounts until agreement of final assay:

 

Concentrate

Copper

Gold

Silver

Concentrate

 

Concentrate

production*

content*

content*

content*

sales**

sales**

(dmt)

(tonnes)

(ounces)

(ounces)

(dmt)

($000)

Quarter ended

31 March 2020

2,994

559

833

30,790

2,018

2,863

30 June 2020

3,171

648

580

20,399

3,526

4,707

H1 2020

6,165

1,207

1,413

51,189

5,544

7,570

30 Sept 2020

3,266

688

483

25,564

2,084

3,377

31 Dec 2020

3,350

696

258

28,365

4,211

6,763

H2 2020

6,616

1,384

741

53,929

6,295

10,140

FY 2020

12,781

2,591

2,154

105,118

11,839

17,710

31 March 2021

2,848

638

366

30,499

-

-

30 June 2021

3,164

695

551

37,644

3,467

9,066

H1 2021

6,012

1,333

917

68,143

3,467

9,066

30 Sept 2021

3,103

573

530

31,439

3,549

5,712

31 Dec 2021

3,922

743

1,028

33,243

4,132

8,941

H2 2021

7,025

1,316

1,558

64,682

7,681

14,653

FY 2021

13,037

2,649

2,475

132,825

11,148

23,719

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

 

Cash

The Company had cash of US$37.5 million at 31 December 2021 (US$30.9 million at 30 September 2021) and no debt.

 

 

**ENDS**

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBIGDBDXBDGDD
Date   Source Headline
8th May 20247:00 amRNSVendor Financing Facility Agreement
17th Apr 20247:00 amRNSQ1 2024 Production and Operations Review
13th Mar 20247:00 amRNSEstablishment of a Sustainability Committee
20th Feb 20247:00 amRNSXarxar maiden JORC Mineral Resource Estimate
16th Feb 20247:00 amRNSUpdate on investment in Libero Copper & Gold Corp
25th Jan 20247:00 amRNSSignificant copper resource confirmed at Xarxar
19th Jan 20247:00 amRNSCommitment to GISTM
15th Jan 20247:00 amRNSQ4 and FY 2023 Production and Operations Review
12th Dec 20237:08 amRNSCaterpillar Underground Mining Equipment delivery
11th Dec 20237:00 amRNSGilar maiden JORC Mineral Resource completed
7th Nov 20237:00 amRNSAgreement of environmental action plan
23rd Oct 20237:00 amRNSDrill results increase mineralisation at Gilar
16th Oct 20237:00 amRNSQ3 and 9M 2023 Production and Operations review
10th Oct 202312:36 pmRNSLoan from the International Bank of Azerbaijan
9th Oct 20234:00 pmRNSLoan from the International Bank of Azerbaijan
4th Oct 20238:17 amRNSMeeting with residents of Soyudlu village
2nd Oct 202310:09 amRNSPDMR Dealing
28th Sep 20237:00 amRNSFinal Micon environmental report
26th Sep 20232:52 pmRNSEnvironmental report and restart of operations
26th Sep 20237:00 amRNSInterim Results
12th Sep 20237:00 amRNSMicon environmental report update
2nd Aug 202312:11 pmRNSUpdate on Environmental Study & Gedabek operations
17th Jul 20237:00 amRNSGedabek Tailings Dam
13th Jul 20237:00 amRNSQ2 & H1 2023 Production and Operations Review
11th Jul 202311:09 amRNSPayment of 2022 Final Dividend
22nd Jun 20232:42 pmRNSResult of AGM
22nd Jun 20237:00 amRNS2023 Annual General Meeting Statement
20th Jun 20237:00 amRNSNotice of Investor Presentation
19th Jun 20237:00 amRNSForward sale of gold
1st Jun 202310:00 amEQSHardman & Co Q&A on Anglo Asian Mining (AAZ): Mining at a key moment in its evolution
31st May 20239:51 amRNSPosting of 2022 Annual Report and Notice of AGM
31st May 20237:00 amRNSDrill results extend mineralisation at Gilar
16th May 20237:00 amRNS2022 Full year results
10th May 20237:15 amEQSHardman & Co Research on Anglo Asian Mining (AAZ): Growth in copper production poised to explode
17th Apr 20237:00 amRNSQ1 2023 Production and Operations Review
30th Mar 20237:00 amRNSStrategic growth plan
27th Mar 20237:00 amRNS300,000 plus tonnes of copper defined at Garadag
21st Mar 20237:00 amRNSIncreased Mineral Resource Estimate at Gilar
16th Mar 20237:00 amRNSXarxar annual copper production target
13th Mar 20237:09 amRNSSignificant copper identified at Xarxar
9th Mar 20237:00 amRNSRevolving Credit Facility Agreement
23rd Feb 20237:00 amRNS2023 Production Guidance
22nd Feb 20237:00 amRNSEquipment Purchase and flotation plant upgrade
21st Feb 20237:00 amRNSZafar mine design complete and construction starts
20th Feb 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp
24th Jan 20239:00 amRNSPrice Monitoring Extension
24th Jan 20237:00 amRNSGilar drill results extend mineralisation
18th Jan 20237:00 amRNSGilar Portal completed and tunnelling commences
16th Jan 20237:00 amRNSQ4 and FY 2022 Production and Operations review
9th Jan 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.