Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Mining PLC Regulatory News (AAZ)

Share Price Information for Anglo Asian Mining PLC (AAZ)

Share Price is delayed by 15 minutes
Get Live Data
350.00    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 10.00 (2.899%)
Market Cap: £400.20m
AAZ Live PriceLast checked at - London Stock Exchange

Intraday Anglo Asian Mining PLC Share Chart

Drilling Results

27 Oct 2005 07:01

Anglo Asian Mining PLC27 October 2005 For immediate release on 27 October 2005 AIM: AAZ ANGLO ASIAN MINING PLC ("Anglo Asian") First drilling results from Azerbaijan The company has almost completed three deep drill holes in the area believed tobe the location of DDH-1, a drill hole sunk during the Soviet era of occupationin the Ordubad fault zone, close to Piyazbashi in Nakhchivan and outside the 8properties identified with Inferred Resources set out in the AIM AdmissionDocument. It has received the assay results from the first new deep drill hole,which was sunk 4 metres away from DDH-1 to a depth of 360 metres. Samples ofthe core from this hole have been assayed at an approved independent laboratoryand have returned an average gold content of below 0.1 g/t, which compares withSoviet data averaging 3.2 g/t over 298 metres in DDH-1. The directors of Anglo Asian are not yet convinced that these results reflectcorrectly the expected mineralogy of the area around DDH-1. There are a numberof reasons that could have led to the discrepancies between the Soviet eraresults and those from the new hole: 1. Although only 4 metres from a Soviet era deep drill hole believed to be DDH-1, the first new vertical drill hole could have missed what may be a steeply dipping vein; 2. The preparation of the samples may have been unrepresentative; and 3. The presumed location of DDH-1 may have been mis-identified. Since DDH-1 was beyond the detailed maps of the nearby Piyazbashi property, in common Soviet practice, the latitude and longitude of DDH-1 was not set out on the drill log. Its expected location was found by anecdotal evidence. The following actions are underway on this series of three drill holes, whichare in similar rock formations: 1. The samples from the second new drill hole that has been sunk 25 metres south of the first new hole have been split 50 per cent. for retention and the balance is being tested by two different approved laboratories; 2. The location of the DDH-1 is in the process of being verified; and 3. The third new hole is being drilled a further 25 metres to the south of the second new drill hole, which is approximately 30 per cent. complete. Charles Hancock, Chief Executive of Anglo Asian, said, "Whilst we aredisappointed that the assay results from this first hole appear unsatisfactory,it is only the first of an extensive drilling campaign over the next two yearscovering areas including 8 properties with Inferred Resources. Samples by AngloAsian's reporting consultants, Behre Dolbear, prior to the flotation of thecompany, supported the high gold values reported by Azeri and Soviet geologistsin the eight separate properties in Ordubad, Gosha and Gedebek." As no value was attributed at the time of the flotation to the Ordubad faultzone, these assay results do not affect the 15.6 Moz Au eq. Inferred Resourcescited by Behre Dolbear in the AIM Admission Document. Anglo Asian will continueits drilling, resampling and refurbishing campaign across a number of itsproperties in Azerbaijan with a view to updating reserve and resource figures toWestern Standards. Two further drill rigs are arriving in Azerbaijan within thenext 7 days. Further commentary on these and other activities underway towardsgold production are contained in the statement accompanying the company'sinterim results announced today. -Ends- For further details, please contact: Anglo Asian Mining PLC Charles Hancock, Chief Executive +44 20 7409 3232 Numis Securities Limited John Harrison +44 20 7776 1590 Parkgreen Communications Justine Howarth +44 20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Nov 20257:00 amRNSDemirli sales agreement
31st Oct 20257:00 amRNSTotal Voting Rights
22nd Oct 20253:45 pmRNSResult of General Meeting
16th Oct 20258:16 amRNSQ3 2025 Production and Operations Review - Replace
16th Oct 20257:00 amRNSQ3 2025 Production and Operations Review
10th Oct 202510:05 amRNSPDMR Shareholding
10th Oct 20257:00 amRNS-RNotice of Trading Update and Investor Presentation
9th Oct 20257:00 amRNSRevised production guidance for FY 2025
29th Sep 202510:34 amRNSHistoric Distributions and Publication of Circular
29th Sep 20257:00 amRNSPDMR Exercise of Share Options and Issue of Equity
25th Sep 20257:00 amRNSInterim Results
21st Jul 20257:10 amRNSGrant of Options
21st Jul 20257:00 amRNSProduction commences at Demirli
15th Jul 20257:00 amRNSQ2 & H1 Production and Operations Review
30th Jun 20251:18 pmRNSChange of registered office
25th Jun 20251:53 pmRNSResult of 2025 Annual General Meeting
25th Jun 20257:00 amRNSAnnual General Meeting Statement
24th Jun 20257:00 amRNSInaugural ESG Rating
20th Jun 202511:00 amRNS-RSenior management appointments
4th Jun 20257:00 amRNSPosting of 2024 Annual Report and Notice of AGM
22nd May 20257:00 amRNS2024 Full Year Results
19th May 20257:00 amRNSProduction commences at the Gilar mine
14th Apr 20257:00 amRNSQ1 2025 Production and Operations Review
24th Mar 20257:00 amRNSFirst ore mined from Gilar
26th Feb 20257:00 amRNSGuidance for 2025
16th Jan 20257:00 amRNSQ4 and FY 2024 Production and Operations Review
26th Nov 20247:00 amRNSResumption of Normal Flotation Production
26th Nov 20247:00 amRNSHistoric Distributions to Shareholders
11th Nov 20247:00 amRNSChange of Auditor
11th Nov 20247:00 amRNSAccess to Demirli
10th Oct 20247:00 amRNSQ3 2024 Production and Operations Review
1st Oct 20247:00 amRNSResumption of Normal Agitation Leaching Production
30th Sep 20241:56 pmRNSDirector Dealing
26th Sep 20247:00 amRNSInterim Results
24th Sep 20247:00 amRNSGaradag Maiden JORC Mineral Resource Estimate
27th Aug 20247:00 amRNSVendor Financing Facility - Receipt of Proceeds
22nd Aug 20247:00 amRNSFull Year 2024 Production Guidance
5th Aug 20243:35 pmRNSTailings Dam Authorisation & Restart of Operations
18th Jul 20247:00 amRNSQ2 & H1 2024 Production and Operations Review
3rd Jul 20247:00 amRNSAmendments to its Production Sharing Agreement
20th Jun 20242:21 pmRNSResults of 2024 Annual General Meeting
20th Jun 20247:00 amRNSAnnual General Meeting Statement
19th Jun 20243:32 pmRNSNotice of Investor Presentation
12th Jun 20247:00 amRNSTailings dam wall raise
11th Jun 20247:00 amRNSPrepayment agreement for the sale of concentrate
29th May 20247:00 amRNSPosting of 2023 Annual Report and Notice of AGM
16th May 20247:00 amRNS2023 Full year results
8th May 20247:00 amRNSVendor Financing Facility Agreement
17th Apr 20247:00 amRNSQ1 2024 Production and Operations Review
13th Mar 20247:00 amRNSEstablishment of a Sustainability Committee

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.