Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Mining PLC Regulatory News (AAZ)

Share Price Information for Anglo Asian Mining PLC (AAZ)

Share Price is delayed by 15 minutes
Get Live Data
307.50    7.50 (2.50%)
Bid:
300.00
Ask:
315.00
Spread: 15.00 (5.00%)
Market Cap: £351.97m
AAZ Live PriceLast checked at - London Stock Exchange

Intraday Anglo Asian Mining PLC Share Chart

2019 Production Guidance

7 Feb 2019 07:00

RNS Number : 2976P
Anglo Asian Mining PLC
07 February 2019
 

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

 

7 February 2019

 

 

Anglo Asian Mining plc

Production Guidance for Full Year 2019

 

Full Year 2019 Metal Production Guidance of 82,000 to 86,000 Gold Equivalent Ounces Building on Record 2018 Production

 

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to announce its highest ever production guidance for the year ended 31 December 2019 ("FY 2019").

 

Overview

 

· Forecast metal production for FY 2019 of between 82,000 to 86,000 gold equivalent ounces ("GEOs") compared to FY 2018 production of 83,736 GEOs (2018 production guidance of 78,000 to 84,000 GEOs)

· Forecast production for FY 2019 of between 65,000 to 67,500 ounces of gold (FY 2018: 72,798 ounces of gold produced) and between 3,100 to 3,300 tonnes of copper (FY 2018: 1,645 tonnes of copper produced)

· Increase in copper production during 2019 resulting from a full year stand-alone operation of the flotation plant offset by lower gold grades of ore processed by the agitation leaching plant

· Between 28,000 to 30,000 GEOs of FY 2019 production in the form of copper and gold concentrate compared FY 2018 production of 17,791 GEOs

 

Anglo Asian CEO Reza Vaziri commented, "2019 will be another year of delivery for Anglo Asian with total metal production of between 82,000 to 86,000 gold equivalent ounces planned by our operations team. This demonstrates the sustainability of our business and builds on our record production of 83,736 gold equivalent ounces in 2018. The increasing proportion of our production as copper and gold in concentrate also highlights the versatility of our processing operations.

 

"One critical pillar underpinning the future growth of the Company is our ongoing exploration and development programme. Two important elements of this programme are the results of the helicopter survey and the publication of the JORC mineral resource for Gardir, our underground mine which is already in production. These are both expected to be announced in this current quarter and should further demonstrate the expansion potential of the Gedabek Contract Area."

 

Assumptions

The production guidance has been calculated using the following budgeted metal prices for 2019:

 

- Gold: $1,250 per ounce

- Silver: $15 per ounce

- Copper: $6,100 per tonne

 

The production guidance is for 100 per cent. of the Company's production which will be subject to an expected 12.75 per cent. production share throughout 2019 with the Government of Azerbaijan under the Company's existing production sharing agreement.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

**ENDS**

 

 

For further information please visit www.angloasianmining.com or contact:

 

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Bill Morgan

Anglo Asian Mining plc

Tel: +994 502 910 400

Stephen Westhead

Anglo Asian Mining plc

Tel: +994 502 916 894

Ewan Leggat

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Tel: +44 (0) 20 3470 0470

Soltan Tagiev

SP Angel Corporate Finance LLP

Tel + 44 (0) 20 3470 0470

Susie Geliher

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Gaby Jenner

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company's main operating location is the Gedabek contract area ("Gedabek") which is a 300 square kilometre area in the lesser Caucasus mountains in western Azerbaijan. The Company developed Azerbaijan's first operating gold/copper/silver mine at Gedabek which commenced gold production in May 2009. Mining at Gedabek was initially from its main open pit, which is an open cast mine with a series of interconnected pits. The Company also operates the high grade Gadir underground mine, which is co-located at the Gedabek site. In September 2017, production commenced at the Ugur open pit mine, a recently discovered gold ore deposit at Gedabek. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

The Company produced 83,736 gold equivalent ounces ('GEOs') for the year ended 31 December 2018. Gedabek is a polymetallic ore deposit that has gold together with significant concentrations of copper in the main open pit mine, and an oxide gold-rich zone at Ugur. The Company therefore employs a series of flexible processing routes to optimise metal recoveries and efficiencies. The Company produces gold doré through agitation and heap leaching operations, copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant and also a copper and precious metal concentrate from its flotation plant. A second dedicated crusher line has been commissioned and is now in operation for the flotation plant to enable it to operate independently of the agitation leaching plant.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company. 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCCKADBABKDPBK
Date   Source Headline
3rd Nov 20257:00 amRNSDemirli sales agreement
31st Oct 20257:00 amRNSTotal Voting Rights
22nd Oct 20253:45 pmRNSResult of General Meeting
16th Oct 20258:16 amRNSQ3 2025 Production and Operations Review - Replace
16th Oct 20257:00 amRNSQ3 2025 Production and Operations Review
10th Oct 202510:05 amRNSPDMR Shareholding
10th Oct 20257:00 amRNS-RNotice of Trading Update and Investor Presentation
9th Oct 20257:00 amRNSRevised production guidance for FY 2025
29th Sep 202510:34 amRNSHistoric Distributions and Publication of Circular
29th Sep 20257:00 amRNSPDMR Exercise of Share Options and Issue of Equity
25th Sep 20257:00 amRNSInterim Results
21st Jul 20257:10 amRNSGrant of Options
21st Jul 20257:00 amRNSProduction commences at Demirli
15th Jul 20257:00 amRNSQ2 & H1 Production and Operations Review
30th Jun 20251:18 pmRNSChange of registered office
25th Jun 20251:53 pmRNSResult of 2025 Annual General Meeting
25th Jun 20257:00 amRNSAnnual General Meeting Statement
24th Jun 20257:00 amRNSInaugural ESG Rating
20th Jun 202511:00 amRNS-RSenior management appointments
4th Jun 20257:00 amRNSPosting of 2024 Annual Report and Notice of AGM
22nd May 20257:00 amRNS2024 Full Year Results
19th May 20257:00 amRNSProduction commences at the Gilar mine
14th Apr 20257:00 amRNSQ1 2025 Production and Operations Review
24th Mar 20257:00 amRNSFirst ore mined from Gilar
26th Feb 20257:00 amRNSGuidance for 2025
16th Jan 20257:00 amRNSQ4 and FY 2024 Production and Operations Review
26th Nov 20247:00 amRNSResumption of Normal Flotation Production
26th Nov 20247:00 amRNSHistoric Distributions to Shareholders
11th Nov 20247:00 amRNSChange of Auditor
11th Nov 20247:00 amRNSAccess to Demirli
10th Oct 20247:00 amRNSQ3 2024 Production and Operations Review
1st Oct 20247:00 amRNSResumption of Normal Agitation Leaching Production
30th Sep 20241:56 pmRNSDirector Dealing
26th Sep 20247:00 amRNSInterim Results
24th Sep 20247:00 amRNSGaradag Maiden JORC Mineral Resource Estimate
27th Aug 20247:00 amRNSVendor Financing Facility - Receipt of Proceeds
22nd Aug 20247:00 amRNSFull Year 2024 Production Guidance
5th Aug 20243:35 pmRNSTailings Dam Authorisation & Restart of Operations
18th Jul 20247:00 amRNSQ2 & H1 2024 Production and Operations Review
3rd Jul 20247:00 amRNSAmendments to its Production Sharing Agreement
20th Jun 20242:21 pmRNSResults of 2024 Annual General Meeting
20th Jun 20247:00 amRNSAnnual General Meeting Statement
19th Jun 20243:32 pmRNSNotice of Investor Presentation
12th Jun 20247:00 amRNSTailings dam wall raise
11th Jun 20247:00 amRNSPrepayment agreement for the sale of concentrate
29th May 20247:00 amRNSPosting of 2023 Annual Report and Notice of AGM
16th May 20247:00 amRNS2023 Full year results
8th May 20247:00 amRNSVendor Financing Facility Agreement
17th Apr 20247:00 amRNSQ1 2024 Production and Operations Review
13th Mar 20247:00 amRNSEstablishment of a Sustainability Committee

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.