Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.75
Bid: 2.70
Ask: 2.80
Change: -0.05 (-1.79%)
Spread: 0.10 (3.704%)
Open: 2.80
High: 2.90
Low: 2.75
Prev. Close: 2.80
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q2 2018 PRELIMINARY PRODUCTION RESULTS

11 Jul 2018 07:00

RNS Number : 2307U
Ariana Resources PLC
11 July 2018
 

 

 

 

 

 

 

11 July 2018

AIM: AAU

 

Q2 2018 PRELIMINARY PRODUCTION RESULTS

 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company with gold mining operations in Turkey, is pleased to announce its preliminary production results for the quarter ended 30 June 2018 for the Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

Second Quarter Preliminary Production Results*:

 

· Gold production for the quarter was 7,171 ounces (Q1: 4,866 ounces), a 47% increase quarter on quarter ("QoQ").

 

· Total ore processed for the quarter was 49,325 tonnes (Q1: 44,897 tonnes) at an average head grade to the plant of 4.77 g/t gold.

 

· Quarterly open pit ore mined was c. 70,400 tonnes, at an average mined grade of 4.18 g/t gold, and total material movement for the quarter was c. 758,000 tonnes.

 

· Average metallurgical plant recovery of gold for the quarter remains consistently high at 94.3%.

 

· The Company maintains its full year production guidance of at least 20,000 ounces of gold.

 

* All figures are given gross with respect to the JV.

 

Dr. Kerim Sener, Managing Director, commented:

 

"The results of the past quarter are our best to date, outperforming overall quarterly feasibility-study expectations by 92%. The tonnage of ore mined has exceeded 70,000 tonnes during the period and grades remain substantially above 4 g/t gold. This production rate has ensured a very healthy stockpile position representing over four months of mill feed. Processing rates were also maintained at the highest rates through the period, which on an annualised basis suggests that the processing plant is already capable of achieving throughput of almost 200,000 tonnes per annum, or 33% above the designed rate. We remain confident in delivering positively against our production guidance of at least 20,000 ounces for the year. I would like to take this opportunity to thank our JV operational team in the achievement represented by the results of this past quarter."

 

 

Q2 2018 Preliminary Production Results

 

Unit

Q2 2018 (preliminary)

Q1 2018

Q2 2017

Open Pit - material moved (wet)

Tonnes

758,310

913,666

449,081

Open Pit - ore mined (wet)

Tonnes

70,426

68,591

59,702

Open Pit - mined grade

g/t Au

4.18

4.50

2.27

Process plant throughput

Tonnes

49,325

44,897

34,317

Plant feed grade

g/t Au

4.77

3.85

2.41

Metallurgical recovery rate

%

94.3

95.1

93.9

Gold produced

Troy Ounces

7,171

4,866

2,145

Silver produced

Troy Ounces

49,508

30,864

15,634

 

 

The Company will publish full results for the quarter ending 30 June 2018 by early August 2018.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

Adam James / James Stearns

Yellow Jersey PR Limited

Tel: +44 (0) 7544 275 882

Tim Thompson / Harriet Jackson

/ Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note

 

About Ariana Resources:

 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAXXEFLPPEFF
Date   Source Headline
16th Apr 20197:00 amRNSQ1 2019 PRELIMINARY PRODUCTION RESULTS
8th Apr 20197:00 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
1st Apr 20197:00 amRNSNEW CORPORATE WEBSITE
29th Mar 20197:00 amRNSEXPLORATION AND DEVELOPMENT UPDATE
25th Mar 20197:00 amRNSUK INVESTOR SHOW 2019
26th Feb 20197:00 amRNSChange of Registered Office
22nd Feb 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
12th Feb 20197:00 amRNSRETURN OF CAPITAL FROM SUBSIDIARY
25th Jan 20197:00 amRNSDirector/PDMR Shareholding
21st Jan 20194:29 pmRNSSHARE BUY-BACK: UPDATE
21st Jan 20197:00 amRNSKIZILCUKUR DEVELOPMENT UPDATE
16th Jan 20192:13 pmRNSReplacement: Purchase of Own Shares
16th Jan 20197:00 amRNSPurchase of Own Shares
14th Jan 20197:00 amRNSQ4 & FULL YEAR 2018 PRELIMINARY PRODUCTION RESULTS
12th Dec 20187:00 amRNSKIZILCUKUR GOLD PROJECT UPDATE
29th Nov 20188:12 amRNSEXCELLENT EXPLORATION RESULTS AT SALINBAS
29th Nov 20187:00 amRNSEXCELLENT EXPLORATION RESULTS AT SALINBAS
22nd Nov 201811:46 amRNSSHAREHOLDER UPDATE MEETING - DATE AND VENUE CHANGE
14th Nov 20187:00 amRNSCorporate Events
14th Nov 20187:00 amRNSDirector/PDMR Shareholding
12th Nov 20187:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
5th Nov 20187:00 amRNSDirector/PDMR Shareholding
29th Oct 20187:00 amRNSNEW CORPORATE VIDEO
17th Oct 20187:00 amRNSEXCELLENT RESULTS FROM SALINBAS
15th Oct 20187:00 amRNSQ3 2018 PRELIMINARY PRODUCTION RESULTS
3rd Oct 20187:00 amRNSKIZILTEPE MINE SITE VISIT
28th Sep 20187:00 amRNSINTERIM RESULTS
17th Sep 20187:00 amRNSPOTENTIAL TO EXPAND THE IVRINDI GOLD RESOURCE
16th Aug 20187:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
17th Jul 201811:54 amRNSDirector/PDMR Shareholding
16th Jul 20182:15 pmRNSDirector/PDMR Shareholding
11th Jul 20187:00 amRNSQ2 2018 PRELIMINARY PRODUCTION RESULTS
2nd Jul 20184:21 pmRNSDirector/PDMR Shareholding
29th Jun 20184:45 pmRNSDirector/PDMR Shareholding
29th Jun 201812:13 pmRNSResult of AGM
29th Jun 20187:00 amRNSAGM Statement
28th Jun 20187:00 amRNSSALINBAS JORC EXPLORATION TARGET
21st Jun 20181:50 pmRNSDirector/PDMR Shareholding
13th Jun 20187:00 amRNSKIZILCUKUR DEVELOPMENT UPDATE
8th Jun 20185:51 pmRNSDirector/PDMR Shareholding
5th Jun 20181:01 pmRNSDirector/PDMR Shareholding
4th Jun 20187:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2017
31st May 20187:00 amRNSSIGNIFICANT RESOURCE INCREASE AT KEPEZ PROSPECT
9th May 20187:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
8th May 20188:30 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
16th Apr 20187:25 amRNSQ1 2018 PRELIMINARY PRODUCTION RESULTS
10th Apr 20187:00 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
9th Apr 20188:25 amRNSTAVSAN RESOURCE UPDATE
16th Mar 20187:00 amRNSDirector/PDMR Shareholdings
14th Mar 20182:17 pmRNSDirector/PDMR Shareholdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.