The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAAOG.L Regulatory News (AAOG)

  • There is currently no data for AAOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

5 Aug 2019 07:00

RNS Number : 8205H
Anglo African Oil & Gas PLC
05 August 2019
 

Anglo African Oil & Gas PLC / Index: AIM / Epic: AAOG / Sector: Oil & Gas

 

ANGLO AFRICAN OIL & GAS PLC ('AAOG' or the 'Company')

Operational Update

 

Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to provide an operational update following the successful results from drilling the TLP-103C well at the producing Tilapia oil field in the Republic of the Congo. This update sets out details of the Company's plan to re-enter TLP-103C and seek to bring the Djeno reservoir into production.

Overview of operational plan

The Company will seek to bring the Djeno into production by re-entering well TLP-103C and drilling a sidetrack just below the Mengo horizon. This sidetrack will be designated TLP-103CST1 and will initially deviate away from TLP-103C for a short distance before continuing vertically downwards. This design reduces the risk of shifting too far from the original location where the Company logged positive results.

TLP-103CST1 will vertically intersect the Top Djeno and then continue into the Middle Djeno, which was below the total depth of TLP-103C. Once the Middle Djeno has been tested, the Company will determine whether the Djeno can be brought into production from either horizon. In parallel, limited but necessary upgrades will be carried out to the topside facilities to ensure that the Company can produce from the well immediately following testing.

Technical details of the drilling plan

TLP-103CST1 is designed as a low side sidetrack. A land drilling rig will be used to clean out the 9 5/8" casing down to the current casing shoe depth at 2,100m measured depth (MD), using seawater with hi-viscosity mud sweeps. The well will then be displaced to a potassium chloride polymer water-based mud system, and a casing pressure test will be conducted to 80% of the casing burst rating. A further 5m of the original 8 ½" hole will be cleaned out, and a formation integrity test will be performed prior to drilling out the remainder of the lower cement plug to re-enter the previous 8 ½" open hole.

In preparation for drilling the sidetrack, a new cement plug will be set inside the 8 ½" open hole below the 9 5/8" casing shoe. The kick off plug is designed to have a compressive strength in excess of the formation strength to allow for successful kick off operations.

The 8 ½" hole sidetrack will be drilled directionally from a planned kick off point of 2,200mMD (approximately 100m below 9 5/8" casing shoe). Drilling parameters have been defined to achieve a 3 degree/100ft dogleg, dropping angle from 35 degrees to 0 degrees inclination, maintaining the same azimuth to attain a ±200m step out compared to TLP-103C at the same true vertical depth.

The 8 ½" hole section will continue to be drilled vertically down to an approximate target depth of 2,900m true vertical depth (TVD), through both the upper and middle Djeno reservoir targets.

Drilling through the reservoir sections will be carefully monitored so that the differential pressure will be maintained at a minimum 100-200psi above hydrostatic pressure so as to minimise formation invasion and minimise the potential for loss of circulation

A comprehensive suite of formation evaluation logs will be acquired across the Top and Middle Djeno reservoirs, including resistivity, sonic, density-neutron, spectral gamma ray, formation pressures, formation samples and mechanical sidewall cores will be retrieved.

Following this, a 7" liner will be run and cemented across the open hole interval in readiness for producing the Djeno reservoirs. Using High Shot Density perforation guns, the Djeno reservoir will be perforated prior to running the Completion string. Assuming that all results at this stage are positive, the well will be flowed tested and cleaned before putting TLP-103CST1 on production, utilising the existing surface facilities.

The Company has posted on its website two technical drawings which illustrate the above plan.

Planning of operations

The Company has identified two suitable drilling rigs, both currently situated in the Republic of the Congo, which have drilling slots available this year. The company is evaluating commercial offers from both rig companies and will update the market once the chosen rig is contracted.

Topside infrastructure

As stated above, the Company intends to minimise the scope of initial works in order to control capital costs ahead of drilling TLP-103CST1. Following these initial works, the topside facilities are estimated to be able to handle production of approximately 2,000bopd. The Company is, however, developing plans to further improve the topside facilities based upon several different levels of potential future production, with the exact plan to be finalised only once actual flow rates are known.

 

The Company confirms that the court in the Republic of the Congo has lifted the seizure order obtained by SMP against certain of the Company's subsidiary's assets.

The Company will provide further updates on the above operational points and plans in due course.

**ENDS**

 

For further information please visit www.aaog.com or contact:

Anglo African Oil & Gas plc

Tel: c/o St Brides Partners +44 20 7236 1177

David Sefton, Executive Chairman

James Berwick, Chief Executive Officer

 

 

 

finnCap Ltd (Nominated Adviser and Broker)

Tel: +44 20 7220 0500

Christopher Raggett, Giles Rolls, Teddy Whiley (Corporate Finance)

 

Camille Gochez (ECM)

 

 

 

St Brides Partners (Financial PR)

Tel: +44 20 7236 1177

Frank Buhagiar, Hugo de Salis

 

 

Notes to Editors

Anglo African Oil & Gas (AAOG) is an AIM-listed independent oil and gas company that owns a 56% stake in the producing Tilapia oil field in the Republic of the Congo. The Company boasts a low-cost production story in a prolific hydrocarbon region with significant exploration upside, differentiating it substantially from its E&P peers. Additionally, management's remuneration is tied to hitting production milestones, reflecting their strong focus on cost control.

Tilapia is located close to multi-billion-barrel fields that include the ENI-operated Litchendjili field and the 5,000bopd Minsala Marine field. Tilapia currently produces approximately 38 bopd from two near-surface intervals. It has an undeveloped discovery in the lower Mengo sands with gross contingent resources of 8.1m barrels and a deeper exploration prospect, with gross prospective resources of 58.4m barrels, in the productive Djeno interval from which the adjacent Minsala field produces. 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBIGDILGGBGCS
Date   Source Headline
23rd Jul 201910:45 amRNSHolding(s) in Company
17th Jul 20194:30 pmRNSHolding(s) in Company
17th Jul 20197:00 amRNSCompletion of Financing
15th Jul 20197:00 amRNSDispute with Société de Maintenance Pétrolière
12th Jul 20197:00 amRNSUpdate regarding financing arrangements
8th Jul 20197:00 amRNSUpdate and clarification on financing process
3rd Jul 20197:00 amRNSProposed Fundraise of £8.25m
1st Jul 20194:41 pmRNSSecond Price Monitoring Extn
1st Jul 20194:35 pmRNSPrice Monitoring Extension
28th Jun 20191:17 pmRNSReceipt of payment from SNPC
28th Jun 201912:22 pmRNSResult of AGM
28th Jun 20198:45 amRNSFinal Results
28th Jun 20197:00 amRNSTurner Pope Investor Evening
14th Jun 201911:35 amRNSPublication of Independent Report for Tilapia
7th Jun 20197:00 amRNSOperational Update
5th Jun 20195:41 pmRNSNotice of AGM
30th Apr 20197:00 amRNSUpdate on New Licence for Tilapia Oil Field
29th Mar 20191:30 pmRNSUpdate on Well TLP103C & SNPC Cost Reimbursements
21st Feb 20193:05 pmRNSHolding(s) in Company
20th Feb 20193:02 pmRNSHolding(s) in Company
18th Feb 20197:00 amRNSSNPC Costs Reimbursements
13th Feb 20197:00 amRNSProduction Plan for TLP-103C
1st Feb 20197:00 amRNSTurner Pope Investor Evening
29th Jan 20194:40 pmRNSSecond Price Monitoring Extn
29th Jan 20194:35 pmRNSPrice Monitoring Extension
29th Jan 20193:00 pmRNSOil Capital Conference Presentation
29th Jan 20192:05 pmRNSSecond Price Monitoring Extn
29th Jan 20192:00 pmRNSPrice Monitoring Extension
29th Jan 20191:49 pmRNSResults from Djeno
18th Jan 20197:00 amRNSHolding(s) in Company
18th Jan 20197:00 amRNSHolding(s) in Company
17th Jan 201911:05 amRNSHolding(s) in Company
16th Jan 20194:15 pmRNSHolding(s) in Company
9th Jan 201911:34 amRNSPlacing to raise £6.0 million
7th Jan 20197:00 amRNSMultiple discoveries confirmed at Tilapia Field
3rd Jan 20197:00 amRNSUpdate on Wells TLP-101 and TLP-102
27th Dec 201811:05 amRNSSecond Price Monitoring Extn
27th Dec 201811:00 amRNSPrice Monitoring Extension
27th Dec 20187:00 amRNSPositive Operational Update From Tilapia Drill
17th Dec 201811:30 amRNSResult of General Meeting
17th Dec 20187:00 amRNSOperational and Corporate Update
11th Dec 20181:23 pmRNSHolding(s) in Company
30th Nov 20184:37 pmRNSNotice of GM
29th Nov 20187:00 amRNSFinancing Facility Conversion and Issue of Equity
26th Nov 20187:30 amRNSFinancing Facility Conversion and Issue of Equity
26th Nov 20187:00 amRNSResumption of Drilling and Compensation
19th Nov 20182:05 pmRNSSecond Price Monitoring Extn
19th Nov 20182:00 pmRNSPrice Monitoring Extension
19th Nov 20187:01 amRNSManagement Share Incentive Scheme
19th Nov 20187:00 amRNSFinancing Facility Drawdown

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.