The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAAOG.L Regulatory News (AAOG)

  • There is currently no data for AAOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

5 Aug 2019 07:00

RNS Number : 8205H
Anglo African Oil & Gas PLC
05 August 2019
 

Anglo African Oil & Gas PLC / Index: AIM / Epic: AAOG / Sector: Oil & Gas

 

ANGLO AFRICAN OIL & GAS PLC ('AAOG' or the 'Company')

Operational Update

 

Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to provide an operational update following the successful results from drilling the TLP-103C well at the producing Tilapia oil field in the Republic of the Congo. This update sets out details of the Company's plan to re-enter TLP-103C and seek to bring the Djeno reservoir into production.

Overview of operational plan

The Company will seek to bring the Djeno into production by re-entering well TLP-103C and drilling a sidetrack just below the Mengo horizon. This sidetrack will be designated TLP-103CST1 and will initially deviate away from TLP-103C for a short distance before continuing vertically downwards. This design reduces the risk of shifting too far from the original location where the Company logged positive results.

TLP-103CST1 will vertically intersect the Top Djeno and then continue into the Middle Djeno, which was below the total depth of TLP-103C. Once the Middle Djeno has been tested, the Company will determine whether the Djeno can be brought into production from either horizon. In parallel, limited but necessary upgrades will be carried out to the topside facilities to ensure that the Company can produce from the well immediately following testing.

Technical details of the drilling plan

TLP-103CST1 is designed as a low side sidetrack. A land drilling rig will be used to clean out the 9 5/8" casing down to the current casing shoe depth at 2,100m measured depth (MD), using seawater with hi-viscosity mud sweeps. The well will then be displaced to a potassium chloride polymer water-based mud system, and a casing pressure test will be conducted to 80% of the casing burst rating. A further 5m of the original 8 ½" hole will be cleaned out, and a formation integrity test will be performed prior to drilling out the remainder of the lower cement plug to re-enter the previous 8 ½" open hole.

In preparation for drilling the sidetrack, a new cement plug will be set inside the 8 ½" open hole below the 9 5/8" casing shoe. The kick off plug is designed to have a compressive strength in excess of the formation strength to allow for successful kick off operations.

The 8 ½" hole sidetrack will be drilled directionally from a planned kick off point of 2,200mMD (approximately 100m below 9 5/8" casing shoe). Drilling parameters have been defined to achieve a 3 degree/100ft dogleg, dropping angle from 35 degrees to 0 degrees inclination, maintaining the same azimuth to attain a ±200m step out compared to TLP-103C at the same true vertical depth.

The 8 ½" hole section will continue to be drilled vertically down to an approximate target depth of 2,900m true vertical depth (TVD), through both the upper and middle Djeno reservoir targets.

Drilling through the reservoir sections will be carefully monitored so that the differential pressure will be maintained at a minimum 100-200psi above hydrostatic pressure so as to minimise formation invasion and minimise the potential for loss of circulation

A comprehensive suite of formation evaluation logs will be acquired across the Top and Middle Djeno reservoirs, including resistivity, sonic, density-neutron, spectral gamma ray, formation pressures, formation samples and mechanical sidewall cores will be retrieved.

Following this, a 7" liner will be run and cemented across the open hole interval in readiness for producing the Djeno reservoirs. Using High Shot Density perforation guns, the Djeno reservoir will be perforated prior to running the Completion string. Assuming that all results at this stage are positive, the well will be flowed tested and cleaned before putting TLP-103CST1 on production, utilising the existing surface facilities.

The Company has posted on its website two technical drawings which illustrate the above plan.

Planning of operations

The Company has identified two suitable drilling rigs, both currently situated in the Republic of the Congo, which have drilling slots available this year. The company is evaluating commercial offers from both rig companies and will update the market once the chosen rig is contracted.

Topside infrastructure

As stated above, the Company intends to minimise the scope of initial works in order to control capital costs ahead of drilling TLP-103CST1. Following these initial works, the topside facilities are estimated to be able to handle production of approximately 2,000bopd. The Company is, however, developing plans to further improve the topside facilities based upon several different levels of potential future production, with the exact plan to be finalised only once actual flow rates are known.

 

The Company confirms that the court in the Republic of the Congo has lifted the seizure order obtained by SMP against certain of the Company's subsidiary's assets.

The Company will provide further updates on the above operational points and plans in due course.

**ENDS**

 

For further information please visit www.aaog.com or contact:

Anglo African Oil & Gas plc

Tel: c/o St Brides Partners +44 20 7236 1177

David Sefton, Executive Chairman

James Berwick, Chief Executive Officer

 

 

 

finnCap Ltd (Nominated Adviser and Broker)

Tel: +44 20 7220 0500

Christopher Raggett, Giles Rolls, Teddy Whiley (Corporate Finance)

 

Camille Gochez (ECM)

 

 

 

St Brides Partners (Financial PR)

Tel: +44 20 7236 1177

Frank Buhagiar, Hugo de Salis

 

 

Notes to Editors

Anglo African Oil & Gas (AAOG) is an AIM-listed independent oil and gas company that owns a 56% stake in the producing Tilapia oil field in the Republic of the Congo. The Company boasts a low-cost production story in a prolific hydrocarbon region with significant exploration upside, differentiating it substantially from its E&P peers. Additionally, management's remuneration is tied to hitting production milestones, reflecting their strong focus on cost control.

Tilapia is located close to multi-billion-barrel fields that include the ENI-operated Litchendjili field and the 5,000bopd Minsala Marine field. Tilapia currently produces approximately 38 bopd from two near-surface intervals. It has an undeveloped discovery in the lower Mengo sands with gross contingent resources of 8.1m barrels and a deeper exploration prospect, with gross prospective resources of 58.4m barrels, in the productive Djeno interval from which the adjacent Minsala field produces. 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBIGDILGGBGCS
Date   Source Headline
5th May 20217:00 amRNSCancellation - Anglo African Oil & Gas PLC
4th May 20215:30 pmRNSAnglo African Oil & Gas
4th May 20215:05 pmRNSCancellation of Trading on AIM & Option Agreement
29th Jan 20217:00 amRNSBoard Change
5th Nov 20208:00 amRNSSuspension of Trading on AIM
5th Nov 20207:30 amRNSSuspension - Anglo African Oil & Gas Plc
1st Oct 202012:06 pmRNSResult of AGM
29th Sep 20207:00 amRNSIssue of Equity
8th Sep 20203:45 pmRNSInterim Results
8th Sep 20203:45 pmRNSPosting of Annual Report and Notice of AGM
2nd Sep 20208:24 amRNSIssue of Equity
18th Aug 20207:00 amRNSIssue of Equity
26th Jun 20204:41 pmRNSSecond Price Monitoring Extn
26th Jun 20204:36 pmRNSPrice Monitoring Extension
11th Jun 20207:00 amRNSConvertible Loan Facility
9th Jun 20202:06 pmRNSSecond Price Monitoring Extn
9th Jun 20202:01 pmRNSPrice Monitoring Extension
19th May 202011:05 amRNSSecond Price Monitoring Extn
19th May 202011:00 amRNSPrice Monitoring Extension
15th May 20206:19 pmRNSExtension for Financial Reporting Deadline
15th May 20204:41 pmRNSSecond Price Monitoring Extn
15th May 20204:36 pmRNSPrice Monitoring Extension
11th May 20202:06 pmRNSSecond Price Monitoring Extn
11th May 20202:01 pmRNSPrice Monitoring Extension
7th May 202011:05 amRNSSecond Price Monitoring Extn
7th May 202011:00 amRNSPrice Monitoring Extension
7th May 20207:00 amRNSResponse to Share Price Movement
6th May 20202:05 pmRNSSecond Price Monitoring Extn
6th May 20202:00 pmRNSPrice Monitoring Extension
4th May 202012:45 pmRNSResult of General Meeting & AIM Rule 15
23rd Apr 202011:06 amRNSSecond Price Monitoring Extn
23rd Apr 202011:00 amRNSPrice Monitoring Extension
21st Apr 20202:05 pmRNSSecond Price Monitoring Extn
21st Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 20207:00 amRNSProposed amendment to consideration & Notice of GM
16th Apr 202012:29 pmRNSResult of General Meeting
8th Apr 202010:00 amRNSHolding(s) in Company
6th Apr 20205:30 pmRNSHolding(s) in Company
1st Apr 20207:00 amRNSFinancing Update & Issue of Equity
26th Mar 20202:00 pmRNSPosting of Circular and Notice of GM
24th Mar 20207:00 amRNSAmendment to Consideration Payment & Notice of GM
19th Mar 20207:00 amRNSBoard Changes and Financing Update
5th Mar 20204:41 pmRNSSecond Price Monitoring Extn
5th Mar 20204:35 pmRNSPrice Monitoring Extension
5th Mar 202012:30 pmRNSHolding(s) in Company
27th Feb 20201:15 pmRNSIssue of Equity and ISA Update
10th Feb 20204:41 pmRNSSecond Price Monitoring Extn
10th Feb 20204:35 pmRNSPrice Monitoring Extension
10th Feb 20202:06 pmRNSSecond Price Monitoring Extn
10th Feb 20202:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.