The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1625
Bid: 0.16
Ask: 0.165
Change: -0.0025 (-1.49%)
Spread: 0.005 (3.125%)
Open: 0.1675
High: 0.165
Low: 0.165
Prev. Close: 0.1675
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Quarterly Report

5 Apr 2017 08:01

RNS Number : 6291B
88 Energy Limited
05 April 2017
 

 

5 April 2017

 

 

QUARTERLY REPORT

 

Report on Activities for the Quarter ended 31 March 2017

 

The Directors of 88 Energy Limited ("88 Energy" or the "Company", ASX & AIM:88E) provide the following report for the quarter ended 31 March 2017.

 

Highlights

 

· Conventional prospectivity review completed in the quarter identifying resource potential in convential leads, based on internal estimates totalling;

o 1.5 billion barrels of gross mean Prospective Resources (unrisked)

o 1.1 billion barrels of net mean Prospective Resources to 88 Energy (unrisked)

· Rig contract executed with Doyon Drilling Inc.; Arctic Fox rig mobilised to the Franklin Bluffs pad in March 2017

· Icewine#2 Operations commenced in the quarter, with cellar and conductor installation completed

· Icewine#2 Permit to Drill submitted for approval with spud on schedule April 2017

· Oversubscribed placement to domestic and international institutional and sophisticated investors raised A$ 17 million in the quarter

 

 

 

Conventional Prospectivity Review Complete

Additional resource potential was identified for conventional leads across Project Icewine acreage, based on internal estimates was announced in Q12017:

o 710 million barrels of gross mean Prospective Resources (unrisked)

o 550 million barrels of net mean Prospective Resources to 88 Energy (unrisked)

 

The overall Conventional Resource Potential for Project Icewine, including previously reported leads, now totals:

o 1.47 billion barrels gross mean Prospective Resources (unrisked)

o 1.14 billion barrels net mean Prospective Resources to 88 Energy (unrisked)

 

88 Energy completed the interpretation of the 2D seismic data acquired by the Company early in 2016 across Project Icewine and is encouraged by the results of the technical evaluation. The principal objective of the seismic acquisition program, to evaluate the conventional prospectivity across Project Icewine, has been achieved. A conventional Prospect and Lead Portfolio has been developed to complement the unconventional Prospective Resource potential already recognised in the HRZ liquids rich resource play. Stacking of Leads mapped in the Central region and on the Western margin of Project Icewine may, on maturation, offer the opportunity to test multiple stacked objectives with one exploration well.

 

 

On completion of the conventional prospectivity portfolio review, the Alpha and Bravo Leads remain the most significant given their seismic relief and geometries. Of note, the Alpha Lead is located close to the transportation corridor and mature infrastructure so could be developed relatively quickly, in the event of exploration success. The Bravo Lead is the most significant Lead in the Western Play Fairway, with closure delineated on the Company's new 2016 seismic database.

 

Project Icewine Conventional Prospectivity Summary

Prospective Oil Resources - Unrisked Recoverable - MMBO

PROJECT ICEWINE CONVENTIONAL LEAD SUMMARY Prospective Oil Resources - Unrisked Recoverable - MMBO

Lead

Low

Best

High

Gross Mean

Net Mean to 88E (WI: 77.5%)

 Eastern Play Fairway

Alpha

19

71

263

118

91

Romeo

2.1

3.4

5.3

3.6

2.8

Sierra

1.1

2.0

3.4

2.2

1.7

 Central Play Fairway

Golf

60

115

210

128

99

Hotel

10

18

31

19.8

15.3

India

61

116

212

129

100

Juliet

52

99

181

110

85

 Western Play Fairway

Bravo

129

245

449

273

212

Oscar

14.5

26.6

47

29.2

22.6

Papa

7.6

13.9

24.6

15.3

11.9

Charlie*

147

257

432

277

215

Delta*

74.7

131

219

141

109

Foxtrot*

40.9

71.5

120

77

60

Mike*

50

87.5

147

94

73

November*

24.8

45.6

80.4

50.1

39

FINAL TOTAL

1,468

1,137

 

 

 

Prospective resources classified in accordance with SPE-PRMS as at 13th January 2017 using probabilistic and deterministic methods on an unrisked basis. Leads identified from interpretation of modern 2D seismic acquired in 2015/2016 across Project Icewine, which comprises 271,119** gross acres on the Central North Slope of Alaska. 88 Energy is Operator of record at Project Icewine (through its wholly owned subsidiary Accumulate Energy Alaska, Inc) with a 77.5% working interest.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

*Conceptual leads extend into previously open acreage to the west of Icewine Project, which was successfully bid on by 88 Energy in the recent State of Alaska Licensing round, December 2016. Currently delineated on Icewine 2D seismic data and extending onto sparse vintage 2D. Further technical work is required to define the full potential of the Western Play Fairway conceptual leads.

** An additional ~420,000 gross acres (~190,000 net to 88E) is subject to formal award, which is expected in 2017

 

 

 

The conventional leads mapped are predominantly stratigraphic and the majority are considered to be associated with slope apron, turbidites and basin floor fan development. The Tarn Oil Pool, Kuparuk River Unit to the norwest of Project Icewine is considered a proven and productive analogue. The Tarn Oil Pool comprises multiple stacked sands within the Seabee Formation.

 

 

Icewine#2 Operations

On 16th February 2017, Accumulate Energy Alaska Inc. entered into a contract with Doyon Drilling Inc to utilise the Arctic Fox rig to drill the Icewine#2 appraisal well. The Arctic Fox is one of the premier rigs on the North Slope and was mobilised directly to the Franklin Bluffs pad from its previous drilling operation.

 

As of end Q1 2017 the conductor for the Icewine#2 appraisal well had been set and installation of the cellar was complete.

 

Final permit approval and delivery of additional equipment required for spud remain on schedule for an April 2017 spud. Stimulation and flow test of the HRZ shale is expected to commence June-July 2017.

 

 

 

 

Oversubscribed Placement to Raise A$17 million

 

On the 6th of March, the Company announced that it had successfully completed a capital raise of A$17 million, with the placement made to domestic and international institutional and sophisticated investors through the issue of 459,459,460 ordinary shares of no par value at A$0.037 (equivalent to £0.023) per New Ordinary Share.

 

Funds raised under the Placement further strengthen the Company's balance sheet ahead of the upcoming drilling of the Icewine#2 well. Specifically, the proceeds will provide the Company with the financial flexibility to cover any unexpected costs arising from the drilling of Icewine#2, lease payments due in respect of the significant new acreage awarded and ongoing exploration activities.

 

 

 

Corporate

 

 

The ASX Appendix 5B attached to this report contains the Company's cash flow statement for the quarter. The significant cash flows for the period were:

 

· exploration and evaluation expenditure of A$1.3m primarliy relating to Icewine#2 operations including well design and permitting work as well as an initial US$300k payment for the Artic Fox rig;

 

· administration and other operating costs A$0.9m (December 2016 of A$0.9m); and

 

· proceeds from issue of shares A$15.8m (net of costs).

 

 

At the end of the quarter, the Company had cash reserves of A$39.7 million.

 

 

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Mr Brent Villemarette, who is a Non Executive Director of the Company. Mr Villemarette has more than 30 years' experience in the petroleum industry, is a member of the Society of Petroleum Engineers, and a qualified Reservoir Engineer who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Mr Villemarette has reviewed the information and supporting documentation referred to in this announcement and considers the prospective resource estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

 

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities

Neil McDonald/Derrick Lee Tel: +44 131 220 6939

 

This announcement contains inside information.

Project Icewine Overview

In November 2014, the Company entered into a binding agreement with Burgundy Xploration (BEX) to acquire a significant working interest (87.5%, reducing to 77.5% on spud of the first well on the project) in a large acreage position on a multiple objective, liquids rich exploration opportunity onshore Alaska, North America, referred to as Project Icewine. In June 2016, the gross acreage position was expanded to 271,119 contiguous acres (210,250 acres net to the Company). In December 2016 the Company successfully bid on additional acres. On award the Project Icewine gross acreage position will be further expanded to ~690,000 contiguous acres (~400,000 acres net to the Company assuming all rights are taken up).

 

The Project is located on an all year operational access road with both conventional and unconventional oil potential. The primary term for the State leases is 10 years with no mandatory relinquishment and a low 16.5% royalty.

 

The HRZ liquids-rich resource play has been successfully evaluated based on core obtained in the recently completed (December 2015) Icewine #1 exploration well, marking the completion of Phase I of Project Icewine. Phase II has now commenced, with a followup appraisal well, Icewine#2, due to spud early 2Q2017. Icewine#2 has been designed as a vertical well with a multi-stage stimulation and flow test, to assess the production potential of the HRZ.

 

Significant conventional prospectivity has also been identified on recently acquired 2D seismic across the project acreage.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

Generous exploration incentives are provided by the State of Alaska with up to 35% of net operating loss refundable in cash.

 

The primary objective is an untested, unconventional liquids-rich shale play in a prolific source rock, the HRZ shale (Brookian Sequence), that co-sourced the largest oil field in North America; the giant Prudhoe Bay Oil Field Complex. Internal modelling and analysis indicates that Project Icewine is located in a high liquids vapour phase sweetspot analogous to those encountered in other Tier 1 shale plays e.g. the Eagle Ford, Texas.

 

Recently acquired 2D seismic has identified large conventional leads at Project Icewine within the same Brookian petroleum system and shallow to the HRZ shale, including potential high porosity channel and turbiditic sands associated with slope apron and deepwater fan plays. The Brookian conventional play is proven on the North Slope; the USGS (2013) estimated the remaining oil potential to be 2.1 billion barrels within the Brookian sequence. Two recent discoveries in the Brookian have already exceeded these estimates, with Armstrong/Repsol discovering 1.4 billion barrels in 2015 and Caelus announcing a 2.5 billion barrel discovery in 2016. Additional conventional potential exists in the Brookian delta topset play, deeper Kuparuk sands and the Ivishak Formation.

 

A Prospective Resources Report by DeGolyer and MacNaughton, was commissioned by 88 Energy to evaluate the unconventional resource potential of Project Icewine in February 2016 and was released to the market on 6th April 2016.

 

About 88 Energy: 88 Energy has a 77.5% working interest and operatorship in ~271,000 acres onshore the prolific North Slope of Alaska ("Project Icewine"). Gross contiguous acreage position will expand on award of additional leases successfully bid on in the December 2016 State of Alaska North Slope Licensing Round.The North Slope is the host to the 15 billion barrel Prudhoe Bay oilfield complex, the largest conventional oil pool in North America. The Company, with its Joint Venture partner Burgundy Xploration, has identified highly prospective play types that are likely to exist on the Project Icewine acreage - two conventional and one unconventional. The large unconventional resource potential of Project Icewine was independently verified by leading international petroleum resource consultant DeGolyer and MacNaughton. In addition to the interpreted high prospectivity, the project is strategically located on a year-round operational access road and only 35 miles south of Pump Station 1 where Prudhoe Bay feeds into the Trans Alaska Pipeline System. The Company acquired 2D seismic in early 2016 to take advantage of the globally unique fiscal system in Alaska, which allowed for up to 75% of 1H2016 exploration expenditure to be rebated in cash. Results from the seismic mapping and prospectivity review are encouraging, and form the basis of a conventional prospectivity portfolio for Project Icewine. In late 2015, the Company completed its maiden well at the project, Icewine#1, to evaluate an unconventional source rock reservoir play which yielded excellent results from analysis of core obtained from the HRZ shale. A follow-up well with a multi-stage stimulation and test of the HRZ shale, Icewine#2, is due to spud early 2Q2017.

 

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

 

Name of entity

88 Energy Limited

ABN

 

Quarter ended ("current quarter")

80 072 964 179

 

31 March 2017

 

Consolidated statement of cash flows

Current quarter $A'000

Year to date (3 months)$A'000

1.

Cash flows from operating activities

23

23

1.1

Receipts from customers

1.2

Payments for

(1,264)

(1,264)

 

(a) exploration & evaluation

 

(b) development

-

-

 

(c) production

-

-

 

(d) staff costs

(351)

(351)

 

(e) administration and corporate costs

 (574)

 (574)

1.3

Dividends received (see note 3)

-

-

1.4

Interest received

1

1

1.5

Interest and other costs of finance paid

-

-

1.6

Income taxes paid

-

-

1.7

Research and development refunds

-

-

1.8

Other (provide details if material)

-

-

1.9

Net cash from / (used in) operating activities

(2,165)

(2,165)

 

2.

Cash flows from investing activities

-

-

2.1

Payments to acquire:

 

(a) property, plant and equipment

 

(b) tenements (see item 10)

-

-

 

(c) investments

-

-

 

(d) other non-current assets

-

-

2.2

Proceeds from the disposal of:

-

-

 

(a) property, plant and equipment

 

(b) tenements (see item 10)

-

-

 

(c) investments

-

-

 

(d) other non-current assets

-

-

2.3

Cash flows from loans to other entities

-

-

2.4

Dividends received (see note 3)

-

-

2.5

Other (provide details if material)

-

-

2.6

Net cash from / (used in) investing activities

-

-

 

3.

Cash flows from financing activities

17,091

17,091

3.1

Proceeds from issues of shares

3.2

Proceeds from issue of convertible notes

-

-

3.3

Proceeds from exercise of share options

-

-

3.4

Transaction costs related to issues of shares, convertible notes or options

(1,250)

(1,250)

3.5

Proceeds from borrowings

-

-

3.6

Repayment of borrowings

-

-

3.7

Transaction costs related to loans and borrowings

-

-

3.8

Dividends paid

-

-

3.9

Other (provide details if material)

-

-

3.10

Net cash from / (used in) financing activities

15,841

15,841

 

4.

Net increase / (decrease) in cash and cash equivalents for the period

27,303

27,303

4.1

Cash and cash equivalents at beginning of period

4.2

Net cash from / (used in) operating activities (item 1.9 above)

(2,165)

(2,165)

4.3

Net cash from / (used in) investing activities (item 2.6 above)

-

-

4.4

Net cash from / (used in) financing activities (item 3.10 above)

15,841

15,841

4.5

Effect of movement in exchange rates on cash held

(1,302)

(1,302)

4.6

Cash and cash equivalents at end of period

39,677

39,677

 

5.

Reconciliation of cash and cash equivalentsat the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts

Current quarter$A'000

Previous quarter$A'000

5.1

Bank balances

39,677

27,303

5.2

Call deposits

-

-

5.3

Bank overdrafts

-

-

5.4

Other (provide details)

-

-

5.5

Cash and cash equivalents at end of quarter (should equal item 4.6 above)

39,677

27,303

 

6.

Payments to directors of the entity and their associates

Current quarter$A'000

6.1

Aggregate amount of payments to these parties included in item 1.2

222

6.2

Aggregate amount of cash flow from loans to these parties included in item 2.3

-

6.3

Include below any explanation necessary to understand the transactions included in items 6.1 and 6.2

6.1 All transactions involving directors and associates were on normal commercial terms.

 

 

 

7.

Payments to related entities of the entity and their associates

Current quarter$A'000

7.1

Aggregate amount of payments to these parties included in item 1.2

42

7.2

Aggregate amount of cash flow from loans to these parties included in item 2.3

-

7.3

Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2

7.1 Consultant fees paid to associated entities were on normal commercial terms.

 

 

 

8.

Financing facilities availableAdd notes as necessary for an understanding of the position

Total facility amount at quarter end$US'000

Amount drawn at quarter end$US'000

8.1

Loan facilities

32,387

17,613

8.2

Credit standby arrangements

-

-

8.3

Other (please specify)

-

-

8.4

Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well.

On 20 August 2015, 88 Energy entered into a credit agreement with the Bank of America for a facility of up to US$50 million. Interest on the drawdown is paid upfront being Eurodollar rate (1% p.a.) plus the applicable rate (6.5% p.a.). The facility is secured by available Production Tax Credits.

 

 

 

9.

Estimated cash outflows for next quarter

$A'000

9.1

Exploration and evaluation

(14,440)

9.2

Development

-

9.3

Production

-

9.4

Staff costs

(150)

9.5

Administration and corporate costs

(700)

9.6

Other (provide details if material)

-

9.7

Total estimated cash outflows

(15,290)

 

10.

Changes in tenements(items 2.1(b) and 2.2(b) above)

Tenement reference and location

Nature of interest

Interest at beginning of quarter

Interest at end of quarter

10.1

Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced

N/A

 

 

 

10.2

Interests in mining tenements and petroleum tenements acquired or increased

N/A

 

 

 

.

1.1 Compliance statement

1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

2 This statement gives a true and fair view of the matters disclosed.

 

Sign here: . Date: 05 April 2017

(Company Secretary)

 

Print name: Sarah Smith

 

Notes

1. The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSSSWIFWSESL
Date   Source Headline
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.