Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    -0.025 (-1.89%)
Bid:
1.25
Ask:
1.35
Spread: 0.10 (8.00%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

22 Mar 2021 07:00

RNS Number : 9484S
88 Energy Limited
22 March 2021
 

 

22nd March 2021

 

This announcement contains inside information

 

88 Energy Limited

 

Operations Update

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) provides the following update related to its operations in the NPR-A region of the North Slope of Alaska.

 

Highlights

· Merlin-1 production hole drilling to commence imminently

· At market share subscription agreement executed

 

Details

88 Energy is pleased to report that the Merlin-1 surface hole was successfully drilled to 1,512ft as planned. Surface casing has now been cemented and the blow out preventer system tested. A formation integrity test (FIT) was successfully undertaken and the rig is now drilling ahead in the production hole where the primary Nanushuk targets are located. Planned total depth is 6,000'.

 

Logging while drilling and mudlogging will provide initial indications as to the prospectivity of the well during this part of the operation, which is expected take three to five days. A sophisticated wireline logging suite will then be run, including sidewall cores and downhole sampling. Wireline logging is expected to take five to seven days.

 

If the results from the wireline logging are encouraging, then the well will be completed with casing and a flow test conducted.

 

88 Energy has entered into a share subscription agreement (the "Subscription") with ELKO International LLC ("ELKO"), one of the major contractors for the current drilling operations. Under the agreement ELKO has subscribed 360,000,000 new Ordinary Shares at $0.018 (the "Subscription Shares"), raising gross proceeds of $6.48 million at a 225% premium to the placement undertaken on 12th February 2021. There are no fees associated with the Subscription.

 

Application has been made for the Subscription Shares, which will rank pari passu with the existing ordinary shares in the Company, to be admitted to trading on both the ASX and AIM ("Admission"), with Admission expected to occur on 25 March 2021.

 

The Subscription does not require shareholder approval and the issue and allotment of the Subscription Shares will rely on the Company's placement capacity pursuant to ASX Listing Rule 7.1A.

 

Following the issue of the Subscription Shares, the Company will have 12,521,590,431 ordinary shares in issue, all of which have voting rights. The figure of 12,521,590,431 ordinary shares may be used by shareholders as the denominator for the calculations by which they will determine if they are required to notify their interest in, or change their interest in, the Company.

 

Managing Director, Dave Wall, commented: "The endorsement of the project by ELKO as we enter the critical phase of the drilling is encouraging and will serve to fund the Company's share of the recently announced cost overruns.

 

We wish all our shareholders good fortune over the coming days."

 

About Project Peregrine - Imminent Drilling

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses ~195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project that will reduce to 50% post the completion of funding as part of a recent farm-in, whereby 88E is carried on the first US$10m (of an originally estimated US$12.6m total cost) for the Merlin-1 well.

 

The Merlin-1 well was spudded on 10th March 2021 and is targeting 645 million barrels of gross mean prospective resource#. Flow testing of Merlin-1 is planned, if wireline logging confirms a discovery. A second well, Harrier-1, may commence immediately following completion of operations at Merlin-1, subject to results from Merlin-1, schedule and permit approvals. Harrier-1 is targeting gross mean prospective resource of 417 million barrels#.

 

Independent Resource Assessment#

Project Peregrine: Alaska North Slope

Unrisked Net Entitlement to 88E Prospective Oil Resources (MMstb)

Prospects (Probabilistic Calculations)

Low (1U)

Best (2U)

High (3U)

Mean

COS

Merlin (Nanushuk)

41

270

1,463

645

37%

Harrier (Nanushuk)

48

207

940

417

24%

Harrier Deep (Torok)

42

267

1,336

574

20%

Prospects Total

1,636

#Please refer to release dated 23 February 2021 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement.

 

Each of the Merlin and Harrier prospects is located on trend to an existing discovery, in the same play type (Nanushuk topsets). This has de-risked the prospects considerably and resulted in a relatively high independently estimated geological chance of success.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

The below graphics can be found in the pdf version of this announcement available from the Company's website;

- Graphic 1: Project Peregrine and Recent Nanushuk Discoveries

- Graphic 2: Merlin-1 - on trend to large Willow oil field

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director

Tel: +61 8 9485 0990

Email: admin@88energy.com

 

Finlay Thomson, Investor Relations

 

Tel: +44 7976 248471

EurozHartleys Ltd

Dale Bryan

 

Tel: + 61 8 9268 2829

Cenkos Securities

Neil McDonald/Derrick Lee

 

Tel: + 44 131 220 6939

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFIFSIVVIFFIL
Date   Source Headline
26th May 20267:00 amRNSAGM Results
20th May 20267:00 amRNSSouth Prudhoe Augusta-1 Exploration Well Update
18th May 20267:00 amRNSSouth Prudhoe Prospective Resource Upgrade
11th May 20267:00 amRNSAmended PEL93 Farm-In Terms and Exploration Update
7th May 20267:00 amRNSRig Secured for Augusta-1 Exploration Well
27th Apr 20267:00 amRNSProject Phoenix - PA Amendment
24th Apr 20267:00 amRNSNotice of Annual General Meeting
16th Apr 20267:00 amRNSQuarterly Report and Appendix 5B
7th Apr 20267:00 amRNSKad River 3D Survey Secured
30th Mar 20267:00 amRNSAugusta-1 Exploration Well Planning Underway
27th Mar 20267:00 amRNSSuccessful Placement to Raise A$5 Million
25th Mar 20267:37 amRNSProposed placing to raise up to A$5.03 million
23rd Mar 20267:27 amRNSLodgement of Annual Report
10th Mar 20267:00 amRNSCompletion of Small Holding Share Sale Facility
9th Mar 20267:09 amRNSCorporate Presentation
19th Feb 20267:01 amRNSNAPE Presentation
19th Feb 20267:00 amRNSSouth Prudhoe Prospective Resource Update
9th Feb 20269:30 amRNSPEL 93 Update
30th Jan 20267:00 amRNSQuarterly Report and Appendix 5B
27th Jan 20267:00 amRNSSchrader Bluff 3D Seismic Survey Secured
5th Jan 20262:42 pmRNSDirector Dealings
27th Nov 20257:00 amRNSCorporate Presentation
26th Nov 20257:00 amRNSProject Phoenix - 2026 Production Test Program
20th Nov 20257:00 amRNSNew North Slope Acreage Secured
30th Oct 20257:02 amRNSQuarterly Report and Appendix 5B
26th Aug 20257:00 amRNS2025 Half-year Report
22nd Aug 20257:00 amRNSDirectorate Change
18th Aug 20257:00 amRNSSale of Non-Core Permian Basin Interest
1st Aug 20257:53 amRNSSmall Holding Share Sale Facility Update
22nd Jul 20257:00 amRNSQuarterly Report and Appendix 5B
2nd Jul 20257:00 amRNSLicence Extension & New Program Launched at PEL 93
18th Jun 20258:16 amRNSSmall Holding Share Sale Facility Letter
16th Jun 20259:29 amRNSSmall Holding Share Sale Facility
13th May 20257:30 amRNSRestoration - 88 Energy Limited
12th May 20252:39 pmRNSCompletion of Consolidation of Capital
12th May 20257:30 amRNSSuspension - 88 Energy Limited
8th May 20254:42 pmRNSTemporary Suspension of Trading
6th May 20258:20 amRNSResult of AGM
17th Apr 20257:09 amRNSQuarterly Report and Appendix 5B
4th Apr 20257:00 amRNSNotice of AGM and Proposed Capital Consolidation
31st Mar 20257:00 amRNSReceipt of Outstanding Project Phoenix Funds
12th Mar 20257:00 amRNSNotice of AGM and Director Nomination
11th Mar 20259:21 amRNSLodgement of Annual Report
18th Feb 20257:00 amRNSCorporate Presentation
17th Feb 20257:00 amRNSFarm-out for Project Phoenix Horizontal Test Well
30th Jan 20257:00 amRNSMaiden Prospective Resource for Canning Prospect
21st Jan 20257:00 amRNSQuarterly Report and Appendix 5B
31st Dec 20247:19 amRNSProject Phoenix Update
12th Dec 20247:36 amRNSHighly Prospective New Leases in Alaska
10th Dec 20247:00 amRNSInitial Interpretation of PEL 93 2D Seismic

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.