Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.215
Bid: 0.21
Ask: 0.22
Change: 0.005 (2.38%)
Spread: 0.01 (4.762%)
Open: 0.21
High: 0.23
Low: 0.205
Prev. Close: 0.21
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

29 May 2018 07:22

RNS Number : 4789P
88 Energy Limited
29 May 2018
 

29th May 2018

 

88 Energy Limited 

 

Operations Update

 

88 Energy Limited (ASX: 88E) ("88 Energy" or the "Company") is pleased to announce the following update for its projects located on the North Slope of Alaska.

 

Highlights

· Site clearance works completed at Franklin Bluffs pad

· Memory gauges retrieved successfully

o Pressure build-up analysis underway

· Commencement of flowback at Icewine#2 on schedule for 11th June

 

Project Icewine - Icewine#2 Production Testing

Site works have concluded at the Franklin Bluffs Pad ahead of the scheduled commencement of flow testing of the Icewine#2 well on the 11th June 2018. Memory gauges from 4,000' downhole were successfully retrieved on the 25th June. Processing and analysis of the pressure build-up data will be completed by early next week. The wireline unit also "tagged bottom" confirming that there has been no build-up of debris in the tubing during the shut-in period.

 

Pressure at the wellhead was measured as between just under 3,000 psi (from the the wellhead gauge) and 3,500 psi based on a pressure reading of 5,200 psi at 4,000' (from the downhole pressure gauges). These pressure readings are positive in regards to maintenance of downhole pressure, as expected.

 

The flow testing program has been designed to utilize nitrogen lift to assist the removal of up to an additional 4,000 barrels of fluid from the HRZ reservoir. It is anticipated that this will enable the hydrocarbons in the reservoir to flow naturally to surface at a representative rate. Based on modelling of the reservoir pressure and fracture conductivity, this is estimated to take 10-14 days. The well will then continue to be flowed back to ascertain drawdown pressure and decline rate.

 

A selection of photos from the recent site vist can be viewed in the pdf version of this announcement at this link 

http://www.rns-pdf.londonstockexchange.com/rns/4789P_-2018-5-29.pdf

 

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Mr Brent Villemarette, who is a Non-Executive Director of the Company. Mr Villemarette has more than 30 years' experience in the petroleum industry, is a member of the Society of Petroleum Engineers, and a qualified Reservoir Engineer who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Mr Villemarette has reviewed the information and supporting documentation referred to in this announcement and considers the prospective resource estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

 

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald/Derrick Lee

 

 

Project Icewine Overview

 

In November 2014, the Company entered into a binding agreement with Burgundy Xploration (BEX) to acquire a significant working interest (87.5%, reducing to 77.5% on spud of the first well on the project) in a large acreage position on a multiple objective, liquids rich exploration opportunity onshore Alaska, North America, referred to as Project Icewine. The current gross acreage position is ~475,000 contiguous acres (301,000 acres net to the Company).

 

The Project is located on an all year operational access road with both conventional and unconventional oil potential. The primary term for the State leases is 10 years with no mandatory relinquishment and a low 16.5% royalty.

 

The HRZ liquids-rich resource play has been successfully evaluated based on core obtained in the recently completed (December 2015) Icewine #1 exploration well, marking the completion of Phase I of Project Icewine. Phase II has now commenced, with drilling at the follow-up appraisal well, Icewine#2, commencing early 2Q2017. Production testing is ongoing.

 

Significant conventional prospectivity has also been identified on recently acquired 2D seismic across the project acreage.

 

A map of the Project Icewine Acreage can be viewed in the pdf of this announcement at the link above.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

Exploration incentives provided by the State of Alaska with up to 35% of net operating loss refundable in cash were concluded for all expenditure post 31 December 2017.

 

The primary objective is an untested, unconventional liquids-rich shale play in a prolific source rock, the HRZ shale (Brookian Sequence), that co-sourced the largest oil field in North America; the giant Prudhoe Bay Oil Field Complex. Internal modelling and analysis indicates that Project Icewine is located in a high liquids vapour phase sweetspot analogous to those encountered in other Tier 1 shale plays e.g. the Eagle Ford, Texas.

 

Recently acquired 2D seismic has identified large conventional leads at Project Icewine within the same Brookian petroleum system and shallow to the HRZ shale, including potential high porosity channel and turbiditic sands associated with slope apron and deepwater fan plays. The Brookian conventional play is proven on the North Slope; the USGS (2013) estimated the remaining oil potential to be 2.1 billion barrels within the Brookian sequence. Two recent discoveries in the Brookian have already exceeded these estimates, with Armstrong/Repsol discovering 1.4 billion barrels in 2015 and Caelus announcing a 2.5 billion barrel discovery in 2016. Additional conventional potential exists in the Brookian delta topset play, deeper Kuparuk sands and the Ivishak Formation.

 

A Prospective Resources Report by DeGolyer and MacNaughton, was commissioned by 88 Energy to evaluate the unconventional resource potential of Project Icewine in February 2016 and was released to the market on 6th April 2016.

 

 

 

About 88 Energy: 88 Energy has a 63% working interest and operatorship in ~342,000 acres onshore the prolific North Slope of Alaska ("Project Icewine"). Gross contiguous acreage position for the Joint Venture is ~475,000 acres (88E 301,000 net acres). The North Slope is the host to the 15 billion barrel Prudhoe Bay oilfield complex, the largest conventional oil pool in North America. The Company, with its Joint Venture partner Burgundy Xploration, has identified highly prospective play types that are likely to exist on the Project Icewine acreage - two conventional and one unconventional. The large unconventional resource potential of Project Icewine was independently verified by leading international petroleum resource consultant DeGolyer and MacNaughton. In addition to the interpreted high prospectivity, the project is strategically located on a year-round operational access road and only 35 miles south of Pump Station 1 where Prudhoe Bay feeds into the Trans Alaska Pipeline System. The Company acquired 2D seismic in early 2016 to take advantage of the globally unique fiscal system in Alaska, which allowed for up to 75% of 1H2016 exploration expenditure to be rebated in cash. Results from the seismic mapping and prospectivity review are encouraging, and form the basis of a conventional prospectivity portfolio for Project Icewine. In late 2015, the Company completed its maiden well at the project, Icewine#1, to evaluate an unconventional source rock reservoir play which yielded excellent results from analysis of core obtained from the HRZ shale. The follow-up well with a multi-stage stimulation and test of the HRZ shale, Icewine#2, spud in early 2Q2017. Flow testing at Icewine#2 is scheduled to re-commence in June 2018.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLIFFREIIAFIT
Date   Source Headline
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update
23rd Jun 20237:00 amRNSHickory-1 Flow Testing Program Update
11th May 20237:16 amRNSAGM Presentation
11th May 20237:16 amRNSAGM Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.