The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.16
Bid: 0.155
Ask: 0.165
Change: 0.00 (0.00%)
Spread: 0.01 (6.452%)
Open: 0.16
High: 0.16
Low: 0.16
Prev. Close: 0.16
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

11 Mar 2021 07:00

RNS Number : 8817R
88 Energy Limited
11 March 2021
 

 

11th March 2021

 

This announcement contains inside information

 

 

 

88 Energy Limited

 

Operations Update

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) provides the following update related to its operations in the NPR-A region of the North Slope of Alaska.

 

Highlights

· Merlin-1 drilling commenced

 

 

Details

88 Energy is pleased to report that Rig 111 commenced drilling the Merlin-1 well at 0338 on 10th March 2021 (AK time).

 

The Merlin-1 well will initially be drilled to 1,500', then surface casing will be installed and the Blow Out Preventer system tested. This is expected to take approximately one week to execute.

 

The well will then be deepened through the target horizons in the Nanushuk Formation to a maximum total depth of 6,000'. Logging while drilling and mudlogging will provide initial indications as to the prospectivity of the well during this part of the operation, which is expected take three to five days. A sophisticated wireline logging suite will then be run, including sidewall cores and downhole sampling. Wireline logging is expected to take five to seven days.

 

If the results from the wireline logging are encouraging, then the well will be completed with casing and a flow test conducted.

 

As part of a standard cost review, 88E's share of the cost of Merlin-1 has been revised to US$4m (increased from US$1.4m). The main contributing factors to the cost increase are delays associated with the Executive Order regarding the issuance of the Permit to Drill; costs associated with shutdown and re-start whilst clarification was attained regarding the Executive Order; delays associated with cold weather and the subsequent knock on to mobilisation costs as a result of expediting activities to meet the operational timetable. The Company's current cash position is US$13m, which more than funds its share of the drilling of Merlin-1 and the Company's other planned activities.

 

Given the operational delays, it is now considered unlikely that the Harrier-1 well will be drilled this season.

 

Managing Director, Dave Wall, commented: "Drilling has now commenced at Merlin-1, with results expected within the next 4 weeks.

 

This is an exciting and pivotal time for the Company and our shareholders."

 

About Project Peregrine - Imminent Drilling

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses ~195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project that will reduce to 50% post the completion of funding as part of a recent farm-in, whereby 88E is carried on the first US$10m (of an originally estimated US$12.6m total cost) for the Merlin-1 well.

 

The Merlin-1 well was spudded on 10th March 2021 and is targeting 645 million barrels of gross mean prospective resource#. Flow testing of Merlin-1 is planned, if wireline logging confirms a discovery. A second well, Harrier-1, may commence immediately following completion of operations at Merlin-1, subject to results from Merlin-1, schedule and permit approvals. Harrier-1 is targeting gross mean prospective resource of 417 million barrels#.

 

Independent Resource Assessment#

Project Peregrine: Alaska North Slope

Unrisked Net Entitlement to 88E Prospective Oil Resources (MMstb)

Prospects (Probabilistic Calculations)

Low (1U)

Best (2U)

High (3U)

Mean

COS

Merlin (Nanushuk)

41

270

1,463

645

37%

Harrier (Nanushuk)

48

207

940

417

24%

Harrier Deep (Torok)

42

267

1,336

574

20%

Prospects Total

 

 

 

1,636

 

#Please refer to release dated 23 February 2021 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement.

 

Each of the Merlin and Harrier prospects is located on trend to an existing discovery, in the same play type (Nanushuk topsets). This has de-risked the prospects considerably and resulted in a relatively high independently estimated geological chance of success.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

The below graphics can be found in the pdf version of this announcement available from the Company's website;

- Graphic 1: Project Peregrine and Recent Nanushuk Discoveries

- Graphic 2: Merlin-1 - on trend to large Willow oil field

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director

Tel: +61 8 9485 0990

Email: admin@88energy.com

 

Finlay Thomson, Investor Relations

 

Tel: +44 7976 248471

EurozHartleys Ltd

Dale Bryan

 

Tel: + 61 8 9268 2829

Cenkos Securities

Neil McDonald/Derrick Lee

 

Tel: + 44 131 220 6939

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFFFEVVFIILIL
Date   Source Headline
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.