The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.16
Bid: 0.155
Ask: 0.165
Change: 0.00 (0.00%)
Spread: 0.01 (6.452%)
Open: 0.16
High: 0.16
Low: 0.16
Prev. Close: 0.16
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Merlin-1 Testing Program Update

14 Jul 2021 07:00

RNS Number : 1287F
88 Energy Limited
14 July 2021
 

 

 

14 July 2021

 

This announcement contains inside information

 

88 Energy Limited

 

Merlin-1 Testing Program Update

 

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM:88E, OTC:EEENF) is pleased to provide the following update in relation to its operations on the North Slope of Alaska and the ongoing testing programme following the drilling of the Merlin-1 well.

 

Highlights

 

· Additional Phase One geochemical analysis of fluid extracts from Merlin-1 core samples again demonstrates the presence of hydrocarbons.

· Results from Phase Two of side-wall core trim analysis are expected in the next few weeks, including quantitative extraction, SARA, isotopes and biomarker analysis.

· Phase Two is designed to confirm not only the presence of oil but also the nature of the source rock, enhancing understanding of the likely quality of the oil as well as migration pathways.

· VAS and gas analysis results also expected in coming weeks.

· Final analysis and results from Merlin-1 post well testing program expected to be concluded by end of July with announcement of full results summary targeted for early August.

 

88 Energy has received additional Phase One results for the remaining thirteen of eighteen specifically selected trims from the Merlin-1 side wall cores. Five of these thirteen trims confirmed the presence of hydrocarbons. This is in addition to the presence of hydrocarbons being confirmed in two of the first five trim results previously received (see 88E release dated 24 June 2021).

 

The additional five trims which confirmed the presence of hydrocarbons were again at depths that were among the most prospective zones noted during drilling as well as during post well testing analysis. The weight of evidence related to the prospectivity of these zones continues to build and is highly encouraging.

 

Phase Two of the geochemical analysis program on the side-wall core trims has commenced. This includes quantitative extraction, SARA (saturate, aromatic, resin and asphaltene analysis), isotopes and biomarkers analysis. Phase Two results are expected to be received in the next two to three weeks, with the analysis designed to confirm not only the presence of oil but also the nature of the source rock. This is targeted at enhancing understanding of the likely quality of the oil as well as migration pathways, which is critical for understanding regional implications on prospectivity across Project Peregrine.

 

The Company is also expecting the preliminary results of the Volatiles Analysis Service (VAS) in the next couple of weeks, as well as analysis of gases collected in isotubes while drilling. VAS and gas analysis further enhances knowledge of the depths at which oil accumulations may occur across the project area as well as wettability of the reservoir rocks.

 

Testing Program and Status

 

The Company continues to be highly encouraged by the preliminary results received to date from the Merlin-1 testing program, with analysis and interpretation of results ongoing and expected to be concluded by the end of July and a full summary of results targeted to be announced in early August. Once complete, these will be consolidated and integrated into the Project Peregrine database, which will form the basis of future farm-out and exploration decisions on the acreage.

 

The table below provides an overview of the samples taken during drilling and related testing program and results received to date and or pending to be received.

 

 

Merlin- 1

RDT fluids

Sidewall core

Cuttings

PVT flashing (field)

PVT flashing (lab)

RCA and SCAL

 

Alternative core program and Geochem

 

VAS

 

All 3 Depths showed evidence of up to 65% HC saturation

 

Isotopes indicate thermogenic oil source. Samples tested as water, more prospective zones not sampled

 

Additional core fluorescence noted in lab photos, cuts observed across multiple trims.

 

2 / 5 initial screening samples returned evidence of hydrocarbons.

Initial blind interpretation received indicating presence of oil across multiple intervals, most of which correlate to shows in core and logs.

Fluid samples from RDT determined to be from secondary zones only, however provide salinity / pressure data.

NMR to ascertain physical and mechanical properties of reservoirs

 

(to be completed)

5 / 13 more samples returned further evidence of hydrocarbons.

Awaiting final results which will integrate tops and log data

 

(to be completed)

 

 

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

About Project Peregrine

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses ~195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project, post completion of the acquisition of APDC's 50% interest in the project.

 

Project Peregrine and Recent Nanushuk Discoveries

 

The Merlin-1 well was spudded in March 2021 and targeted 645 million barrels of gross mean prospective resource#. Drilling is now complete, and interpretation of results is underway. A second well, Harrier-1, is planned to be drilled in 2022 and is targeting gross mean prospective resource of 417 million barrels#.

 

Independent Resource Assessment#

 

Project Peregrine: Alaska North Slope

Unrisked Net Entitlement to 88E Prospective Oil Resources (MMstb)

Prospectus (Probabilistic Calculations) 

Low

(1U)

Best

(2U)

High

(3U)

Mean

COS

Merlin (Nanushuk)

41

270

1,463

645

37%

Harrier (Nanushuk)

48

207

940

417

24%

Harrier Deep (Torok)

42

267

1,336

574

20%

Prospects Total

1,636

#Please refer to release dated 23 February 2021 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement. The Resource Assessment table does not incorporate the results of the Merlin-1 well.

 

The Merlin-1 well and the Harrier prospect are located on trend to an existing discovery, in the same play type (Nanushuk topsets). This has de-risked the prospects considerably and resulted in a relatively high independently estimated geological chance of success.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

The below graphics can be viewed in the pdf version of this announcement, which is available on the Company's website www.88energy.com;

 

· Project Peregrine and Recent Nanushuk Discoveries

· Merlin-1 - on trend to large Willow oil field

 

 

Media and Investor Relations:

 

88 Energy Ltd

Ashley Gilbert, Managing Director

 

Tel: +61 8 9485 0990

Email: investor-relations@88energy.com

Finlay Thomson, Investor Relations

 

Tel: +44 7976 248471

Fivemark Partners, Investor and Media Relations

Andrew Edge / Michael Vaughan

 

Tel: +61 410 276 744

Tel: +61 422 602 720

 

EurozHartleys Ltd

Dale Bryan

 

Tel: + 61 8 9268 2829

Cenkos Securities

Neil McDonald / Derrick Lee

 

Tel: + 44 131 220 6939

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGPUPAMUPGGAW
Date   Source Headline
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.