Rainbow Rare Earths Phalaborwa project shaping up to be one of the lowest cost producers globally. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1075
Bid: 0.105
Ask: 0.11
Change: 0.005 (4.76%)
Spread: 0.005 (4.762%)
Open: 0.105
High: 0.11
Low: 0.11
Prev. Close: 0.105
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Hickory-1 Surface Hole Completed

23 Mar 2023 07:00

RNS Number : 9075T
88 Energy Limited
23 March 2023
 

 

 

88 Energy Limited

Hickory-1 Surface Hole Completed

Highlights

· Hickory-1 surface hole successfully drilled to 3,570 feet, cased and BOP system tested successfully.

· Operations progressing with Nordic Calista's Rig-2 now preparing to drill ahead.

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to report that the Hickory-1 surface hole was successfully drilled to 3,570 feet, the surface casing installed and cemented and the Blow Out Preventer (BOP) system tested successfully.

Nordic Calista's Rig-2 is now preparing to drill ahead, with the Hickory-1 exploration well expected to intersect the three primary SMD targets, before drilling ahead into the secondary SFS and BFF reservoirs targets. The KUP reservoir is a tertiary target and will be drilled subject to remaining time in the season, borehole conditions and other technical considerations.

The Company anticipates the primary and secondary target zones to be intersected within the next two weeks, before determining whether to drill ahead to the tertiary target and reaching permitted Total Depth (TD) of approximately 12,500 feet.

 

Logging while drilling and mudlogging are set to provide initial indications as to the prospectivity of the target zones at the Hickory-1 location. A sophisticated, targeted wireline logging program is planned to be run after reaching TD, which includes side wall cores (both pressurised and non-pressurised), triple combo, dielectric scanner and Nuclear Magnetic Resonance.

The wireline logging program is expected to take approximately five to seven days to complete. It is designed to gather extensive data which will be used to optimise the planned Hickory-1 flow test program scheduled for the 2023/24 winter season (subject to well results).

The Company will provide further updates subsequent to Hickory-1 achieving TD.

 

Figure 1: Nordic Calista Rig-2 at the Hickory-1 drilling location, adjacent to the Dalton Highway, North Slope Alaska.

 

 

 

Figure 2: Hickory-1 well designed to test up to 6 stacked targets.

 

 

This announcement has been authorised by the Board.

 

Media and Investor Relations:

 

88 Energy Ltd

 

Ashley Gilbert, Managing Director

 

Tel: +61 8 9485 0990

Email: investor-relations@88energy.com

 

Fivemark Partners, Investor and Media Relations Tel: +61 410 276 744

Andrew Edge / Michael Vaughan Tel: +61 422 602 720

 

EurozHartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald / Derrick Lee

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

About Project Phoenix

Project Phoenix (88E 75.2% WI) is located on the central North Slope of Alaska and encompasses approximately 82,846 gross acres. It is situated on-trend to recent discoveries by Pantheon Resources Plc (LSE: PANR) in multiple, newly successful play types across top, slope and bottom-set sands of the Mid Schrader Bluff, Canning and Seabee formations. Independent mapping has demonstrated that these plays extend into the Phoenix acreage.

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1: Project Phoenix lease area, including mapped play fairways, Franklin Bluffs 3D area and planned Hickory-1 well location.

 

Project Phoenix holds an estimated unrisked total of 647MMbbl of conventional prospective oil resources (mean unrisked, net to 88E), independently assessed by Lee Keeling and Associates (LKA) in Q3 2022 (see 88E ASX release dated 23 August 2022). The acreage has been significantly de-risked by the recent Pantheon drilling and flow tests on their adjacent acreage to the North, coupled with data from Icewine-1 well logs (encountered 380 ft of net oil pay within SMD sands) and a modern 3D seismic data set (FB3D).

 

 

 

Phoenix: Alaska North Slope

Unrisked Net Entitlement to 88E 1,6 Prospective Oil Resources (MMstb) 4,5

Prospects (Probabilistic Method)

Low (1U)

Best (2U)

High (3U)

Mean

COS3

Shelf Margin Delta (SMD A, B & C)

44

140

326

145

81%

Slope Fan System (SFS)

24

84

217

89

50%

Basin Floor Fan (BFF)

75

341

930

358

50%

Kuparuk (KUP)

24

56

98

56

72%

Prospects Total

 167

621

 1,570

647 2

 

 

1. 88 Energy net resources have been calculated using a 75.227% working interest and a 16.5% royalty.

2. The unrisked means, which have been arithmetically summed, are not representative of expected total from the prospects and implies a success case in all reservoir intervals. 88 Energy cautions that the arithmetically summed 1U estimate may be a conservative estimate and the arithmetically summed 3U estimate may be optimistic when compared to a statistical aggregation of probability distributions.

3. COS represents the geological chance of success as assessed by 88 Energy and reviewed and endorsed by LKA. 

4. Prospects are subject to a phase risk (oil vs gas). Chance of oil has been assessed as 100% for all targets except for the Kuparuk Formation which has been assessed as 70%. Phase risk has not been applied to the unrisked numbers.

5. The Prospective Resources have not been adjusted for the chance of development. Quantifying the chance of development (COD) requires consideration of both economic and other contingencies, such as legal, regulatory, market access, political, social license, internal and external approvals and commitment to project finance and development timing. As many of these factors are outside the knowledge of LKA they must be used with caution.

6. Please refer to ASX announcement dated 23 August 2022 for further details in relation to the prospective resources estimate and associated risking with Phoenix.

 

Cautionary Statement: The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially movable hydrocarbons.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEASDAADADEFA
Date   Source Headline
6th Nov 20137:00 amPRNIssue of Equity
4th Nov 20137:00 amPRNListed Options Expiry and Issue of Equity
28th Oct 20137:00 amPRNQuarterly Report September 2013
28th Oct 20137:00 amPRNIssue of Equity
25th Oct 20137:00 amPRNResponse to ASX Price Query
21st Oct 20137:00 amPRNIssue of Equity
14th Oct 20138:01 amPRNIssue of Equity
10th Oct 20137:00 amPRNTangiers signs underwriting agreement
8th Oct 20137:00 amPRNTangiers terminates FOA with CWH Resources
7th Oct 20137:10 amPRNIssue of Equity
1st Oct 20137:00 amPRNChange in Director Interest Notice
1st Oct 20137:00 amPRNChange in Director Interest Notice
1st Oct 20137:00 amPRNChange in Director Interest Notice
1st Oct 20137:00 amPRNIssue of Equity
24th Sep 20137:00 amPRNIssue of Equity
23rd Sep 20137:26 amPRNIssue of Equity
18th Sep 20137:00 amPRNLetter to Listed Optionholders
16th Sep 20137:00 amPRNIssue of Equity
16th Sep 20137:00 amPRNLetter to Shareholders
23rd Aug 20138:50 amPRNHalf-yearly Report
18th Jul 20137:00 amPRNQuarterly Report June 2013
26th Jun 20137:00 amPRNJoint Company Secretary Change
30th May 20137:35 amPRNResult of AGM
28th May 20137:00 amPRNTangiers appoints Joint Australian Broker
22nd May 20137:00 amPRNTangiers executes farm-out agreement
21st May 20137:00 amPRNTangiers appoints Joint UK Broker
10th May 20137:00 amPRNTangiers takes another key step in growth strategy
30th Apr 20137:00 amPRNNotice of AGM
29th Apr 20137:00 amPRNQuarterly Report March 2013
28th Mar 20137:00 amPRNIssue of Options
22nd Mar 20137:00 amPRNFull Year Statutory Accounts
21st Feb 20137:00 amPRNAppointment of Joint Company Secretary
15th Feb 20137:00 amPRNResignation of Joint Company Secretary
14th Feb 20137:32 amPRNIssue of Equity
4th Feb 20138:33 amPRN3D seismic data confirms Tarfaya potential
31st Jan 20139:30 amPRNQuarterly Report December 2012
24th Dec 20127:00 amPRNPreviously Exercised Options
20th Dec 20127:00 amPRNNotification of Cancellation of Shares
20th Dec 20127:00 amPRNLetter to Shareholders
3rd Dec 20127:00 amPRNTangiers Enters Farm-out Agreement for Morocco
3rd Dec 20127:00 amPRNTangiers Signs HOA to Farm-out Australian Blocks
28th Nov 20127:48 amPRNIssue of Options
27th Nov 20127:01 amPRNQueensland Block Relinquished to Focus on Africa
22nd Nov 20127:59 amPRNIssue of Equity
19th Nov 20127:00 amPRNChange of Registered Office
16th Nov 20129:28 amPRNGeneral Meeting Results
14th Nov 20127:00 amPRNIssue of Equity
30th Oct 20129:43 amPRNQuarterly Report for 30 September 2012
16th Oct 20129:52 amPRNNotice of EGM
5th Oct 20127:21 amPRNIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.