If you would like to ask our webinar guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund a question please submit them here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1575
Bid: 0.155
Ask: 0.16
Change: 0.00 (0.00%)
Spread: 0.005 (3.226%)
Open: 0.1575
High: 0.1575
Low: 0.1575
Prev. Close: 0.1575
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Hickory-1 Operations Update

6 Feb 2023 07:01

RNS Number : 9486O
88 Energy Limited
06 February 2023
 

This announcement contains inside information

 

88 Energy Limited

Hickory-1 Operations Update

Highlights

 

· Permit to Drill approved for the Hickory-1 exploration well

· Ice-pad construction to commence imminently ahead of drilling Hickory-1 well

· Mobilisation of Nordic Calista Rig-2 expected to commence mid-February

· Spud of Hickory-1 well on track for early March 2023

· Hickory-1 drilling costs estimated to be US$13.5m gross (88E 75% working interest)

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to confirm that the Permit to Drill (PTD) has been approved by the Alaska Oil and Gas Conservation Commission (AOGCC) for the Hickory-1 well, located in Project Phoenix on the North Slope of Alaska.

In addition, construction of the Hickory-1 ice-pad will commence imminently with mobilisation of the Nordic Calista Rig-2 scheduled to also begin around mid-February from the Pantheon Resources, Alkaid-2 well location. The Hickory-1 drilling location is directly adjacent to the Trans-Alaska Pipeline System (TAPS) and the Dalton Highway.

Planning and Permitting for the Hickory-1 well is now largely complete with the approval of the AOGCC PTD, ahead of targeted spud in early March 2023. Hickory-1 Project Manager, Fairweather, LLC, has completed the tendering and contracting program for the drilling operations with the well cost estimated to be approximately US$13.5 million gross (88E net ~US$10 million). The modest drilling cost is a direct result of the proximity of Project Phoenix and the Hickory-1 well to key infrastructure including the Dalton Highway.

Flow testing of the Hickory-1 well is planned to be undertaken in the 2023/24 winter season, subject to well results, providing sufficient time post-drilling to optimise the flow test design, permitting and implementation.

The Hickory-1 well is designed to appraise up to six conventional reservoir targets within the SMD, SFS, BFF and KUP reservoirs and 647 million barrels of oil1,2. Hickory-1 is permitted to a total depth of 12,500 feet. An optimal drilling location has been selected adjacent to the Dalton Highway utilising an extensive suite of data. This included interpretation of the Icewine-1 well logs, mapping and AVO analysis of the modern Franklin Bluffs 3D seismic data (FB3D) and publicly available information from the recent drilling and flow tests carried out on adjacent acreage by Pantheon Resources.

 

1 Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

2 Mean unrisked resource - Net Entitlement to 88 Energy. Refer announcement released to ASX on 23 August 2022

 

This announcement has been authorised by the Board.

 

 

Media and Investor Relations

 

 

88 Energy Ltd

Ashley Gilbert, Managing Director

 

Tel: +61 8 9485 0990

Email:investor-relations@88energy.com

 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Fivemark Partners, Investor and Media Relations

Michael Vaughan Tel: +61 422 602 720

 

EurozHartleys Ltd, Dale Bryan Tel: + 61 8 9268 2829

Cenkos Securities, Neil McDonald / Derrick Lee Tel: + 44 131 220 6939

 

 

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

 

 

About Project Phoenix

Project Phoenix (88E 75.2% WI) is located on the central North Slope of Alaska and encompasses approximately 82,846 gross acres. It is situated on-trend to recent discoveries by Pantheon Resources Plc (LSE: PANR) in multiple, newly successful play types across top, slope and bottom-set sands of the Mid Schrader Bluff, Canning and Seabee formations. Independent mapping has demonstrated that these plays extend into the Phoenix acreage.

 

Project Phoenix holds an estimated unrisked conventional total of 647MMbbl of prospective oil resources (mean unrisked, net to 88E), independently assessed by Lee Keeling and Associates (LKA) in Q3 2022 (see 88E ASX release dated 23 August 2022). The acreage has been significantly de-risked by the recent Pantheon drilling and flow tests on their adjacent acreage to the North, coupled with data from Icewine-1 well logs (encountered 380 ft of net oil pay within SMD sands) and a modern 3D seismic data set (FB3D).

Figure 1: Project Phoenix lease area, including mapped play fairways, Franklin Bluffs 3D area and planned Hickory-1 well location (subject to permitting, as well as JV and Government approvals).

 

Phoenix: Alaska North Slope

Unrisked Net Entitlement to 88E 1,6 Prospective Oil Resources (MMstb) 4,5

Prospects (Probabilistic Method)

Low (1U)

Best (2U)

High (3U)

Mean

COS3

Shelf Margin Delta (SMD A, B & C)

44

140

326

145

81%

Slope Fan System (SFS)

24

84

217

89

50%

Basin Floor Fan (BFF)

75

341

930

358

50%

Kuparuk (KUP)

24

56

98

56

72%

Prospects Total

 167

621

 1,570

647 2

 

 

1. 88 Energy net resources have been calculated using a 75.227% working interest and a 16.5% royalty.

2. The unrisked means, which have been arithmetically summed, are not representative of expected total from the prospects and implies a success case in all reservoir intervals. 88 Energy cautions that the arithmetically summed 1U estimate may be a conservative estimate and the arithmetically summed 3U estimate may be optimistic when compared to a statistical aggregation of probability distributions.

3. COS represents the geological chance of success as assessed by 88 Energy and reviewed and endorsed by LKA. 

4. Prospects are subject to a phase risk (oil vs gas). Chance of oil has been assessed as 100% for all targets except for the Kuparuk Formation which has been assessed as 70%. Phase risk has not been applied to the unrisked numbers.

5. The Prospective Resources have not been adjusted for the chance of development. Quantifying the chance of development (COD) requires consideration of both economic and other contingencies, such as legal, regulatory, market access, political, social license, internal and external approvals and commitment to project finance and development timing. As many of these factors are outside the knowledge of LKA they must be used with caution.

6. Please refer to ASX announcement dated 23 August 2022 for further details in relation to the prospective resources estimate and associated risking with Phoenix.

 

 

Cautionary Statement: The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable hydrocarbons.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFFFLFFDIEIIV
Date   Source Headline
7th Jun 20217:05 amRNSIssue of Equity
7th Jun 20217:00 amRNSAcquisition of Interest in Project Peregrine
25th May 20217:00 amRNSIssue of Equity
25th May 20217:00 amRNSOperations Update
21st May 20219:24 amRNSResult of AGM
21st May 20217:00 amRNSAGM Presentation
4th May 20217:17 amRNSAppointment of Managing Director
30th Apr 202111:05 amRNSSecond Price Monitoring Extn
30th Apr 202111:00 amRNSPrice Monitoring Extension
29th Apr 20219:00 amRNSPrice Monitoring Extension
27th Apr 20219:00 amRNSPrice Monitoring Extension
27th Apr 20217:00 amRNSOperations Update
23rd Apr 202111:05 amRNSSecond Price Monitoring Extn
23rd Apr 202111:00 amRNSPrice Monitoring Extension
22nd Apr 20212:05 pmRNSSecond Price Monitoring Extn
22nd Apr 20212:01 pmRNSPrice Monitoring Extension
20th Apr 20217:00 amRNSQuarterly Report
19th Apr 20217:07 amRNSIssue of Shares
12th Apr 20219:05 amRNSSecond Price Monitoring Extn
12th Apr 20219:00 amRNSPrice Monitoring Extension
12th Apr 20217:00 amRNSOperations Update
7th Apr 20214:41 pmRNSSecond Price Monitoring Extn
7th Apr 20214:36 pmRNSPrice Monitoring Extension
7th Apr 20212:06 pmRNSSecond Price Monitoring Extn
7th Apr 20212:01 pmRNSPrice Monitoring Extension
7th Apr 202111:43 amRNSIssue of Equity
7th Apr 202111:06 amRNSSecond Price Monitoring Extn
7th Apr 202111:00 amRNSPrice Monitoring Extension
6th Apr 20214:41 pmRNSSecond Price Monitoring Extn
6th Apr 20214:36 pmRNSPrice Monitoring Extension
6th Apr 20217:00 amRNSOperations Update
1st Apr 20219:05 amRNSSecond Price Monitoring Extn
1st Apr 20219:00 amRNSPrice Monitoring Extension
31st Mar 20217:52 amRNSOperations Update
30th Mar 20214:41 pmRNSSecond Price Monitoring Extn
30th Mar 20214:35 pmRNSPrice Monitoring Extension
30th Mar 20219:05 amRNSSecond Price Monitoring Extn
30th Mar 20219:00 amRNSPrice Monitoring Extension
29th Mar 20217:00 amRNSOperations Update
26th Mar 20212:06 pmRNSSecond Price Monitoring Extn
26th Mar 20212:01 pmRNSPrice Monitoring Extension
25th Mar 20219:05 amRNSSecond Price Monitoring Extn
25th Mar 20219:00 amRNSPrice Monitoring Extension
23rd Mar 20214:40 pmRNSSecond Price Monitoring Extn
23rd Mar 20214:36 pmRNSPrice Monitoring Extension
22nd Mar 20219:05 amRNSSecond Price Monitoring Extn
22nd Mar 20219:00 amRNSPrice Monitoring Extension
22nd Mar 20217:00 amRNSOperations Update
19th Mar 20214:41 pmRNSSecond Price Monitoring Extn
19th Mar 20214:36 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.