Drilling Update

30 Oct 2015 07:40

RNS Number : 9753D
88 Energy Limited
30 October 2015
 



30 October 2015

 

Icewine #1 Weekly Drilling Update

 

88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide the following drilling update.

 

As at 29th October 2015 10:00 (AK time), the Kuukpik Rig 5 had drilled to a total depth of 3,515'.

 

Current operations involve setting of 9 5/8" casing at 3,500', prior to drilling ahead in 8 1/2" hole through the Brookian section.

 

The next casing point is at circa 10,300' before setting 7" casing and then commencing coring operations in the lower Hue / upper HRZ, which is the primary target for the Icewine #1 exploration well.

 

The well is planned to a Total Depth of 11,600 feet and is scheduled to take 30 days of drilling to complete. The primary objective of the well is the HRZ shale formation, targeting a huge unconventional resource prize.

 

Upon completion of drilling, certain data will be available immediately and will be reported to the market after internal examination; however, the definitive testing of the HRZ shale potential will take several months of data analysis. The pivotal focus will be an extensive evaluation of core material by specialist laboratories, which will cover a number of parameters considered critical for the success of the play.

 

Conventional potential may also exist in shallower (Brookian) and deeper (Kuparuk) horizons and the well has been designed such that testing of these horizons is possible, if warranted. The drilling of Icewine #1 will deliver first insight to the conventional prospectivity of 88 Energy's acreage to be matured up by the potential acquisition of 3D seismic in the near term. The conventional horizons that will be encountered in Icewine #1 have not been delineated by 3D seismic and remain secondary to the primary target, that being the HRZ shale.

 

Regular announcements will be made during the course of drilling, as appropriate.

 

 

Managing Director of 88 Energy Limited, Dave Wall commented: "Drilling operations in the top hole have proceeded smoothly and on schedule, with no HSE or lost time incidents. After setting the 9 5/8 casing, we will drill ahead into the more geologically interesting Brookian sequence."

 

Media and Investor Relations:

 

Australia

 

 

88 Energy Ltd

admin@88energy.com

+61 8 9485 0990

 

Hartleys Limited

As Corporate Advisor

Mr Dale Bryan

+61 8 9268 2829

 

 

United Kingdom

 

Cenkos Securities Plc

As Nominated Adviser

Mr Neil McDonald

 

 

Mr Derrick Lee

 

Tel: +44 (0)131 220 9771 / +44 (0)207 397 1953

Tel: +44 (0)131 220 9100 / +44 (0)207 397 8900

 

Project Icewine Highlights

 

In November 2014, the Company entered into a binding agreement with Burgundy Xploration (BEX) to acquire a significant working interest (87.5%, reducing to 78% on spud of the first well on the project) in a large acreage position on a multiple objective, liquids rich exploration opportunity onshore Alaska, North America, referred to as Project Icewine.

 

88 Energy has a 98,182 gross contiguous acre position with 85,900 acres net to the Company (76,582 net acres post spud), located on an on all year operational access road with both conventional and unconventional oil potential. The primary term for the State leases is 10 years with no mandatory relinquishment and a low 16.5% royalty.

 

The unconventional oil play will be tested by the recently spud Icewine #1 exploration well, scheduled to be completed in November 2015.

 

Generous exploration incentives are provided by the State of Alaska with up to 85% of exploration expenditure in 2015 cash refundable, dropping to 75% mid 2016 and thereafter 35%.

 

The primary objective is an untested, unconventional liquids-rich shale play in a prolific source rock, the HRZ shale,(Brookian Sequence), that co-sourced the largest oil field in North America; the giant Prudhoe Bay Oil Field Complex. Internal modelling and analysis indicates that Project Icewine is located in a high liquids vapour phase sweetspot analogous to those encountered in other Tier 1 shale plays e.g. the Eagle Ford, Texas.

 

Conventional play potential can be found at Project Icewine within the same Brookian petroleum system and shallow to the HRZ shale and includes high porosity channel and deep water turbiditic sands. The Brookian conventional play is proven on the North Slope; the USGS (2013) estimate the remaining oil potential to be 2.1 billion barrels just within the Brookian sequence. Additional conventional potential exists in the deeper Kuparuk sands and the Ivashuk Formation.

 

Drilling, (2012), in the adjacent acreage to the north confirmed that the HRZ shales, along with the underlying Kingak & Shublik shales, were all within the oil window which is extremely encouraging for the unconventional potential at Project Icewine. In addition, a conventional oil discovery was reported in the Kuparuk sandstones.

 

A Prospective Resources Report by DeGolyer and MacNaughton, was commissioned by 88 Energy to evaluate the unconventional resource potential of Project Icewine in early December 2014 and was released to the market on 19 January 2015.

 

About 88 Energy: In late 2014, 88 Energy acquired an initial 87.5% working interest (reducing to 78% on spud of the first well on the project) and operatorship in 98,182 acres onshore the prolific North Slope of Alaska ("Project Icewine"). The North Slope is the host for the 15 billion barrel Prudhoe Bay oilfield complex, the largest conventional oil pool in North America. The Company, with its Joint Venture partner Burgundy Xploration, has identified two highly prospective play types that are likely to exist on the Project Icewine acreage - one conventional and one unconventional. The large resource potential of Project Icewine was independently verified by leading international petroleum resource consultant DeGolyer and MacNaughton. In addition to the interpreted high prospectivity, the project is strategically located on a year-round operational access road and only 35 miles south of Pump Station 1 where Prudhoe Bay feeds into the TransAlaska Pipeline System. The Company plans to progress drilling and seismic acquisition in the near term to take advantage of the globally unique fiscal system in Alaska, which allows for up to 85% of CY2015 exploration expenditure to be rebated in cash.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPKKDNOBDKFKN
Date   Source Headline
20th Jan 20154:35 pmRNSPrice Monitoring Extension
19th Jan 20157:00 amPRNLarge Resource Potential Identified at Icewine
13th Jan 20157:00 amPRNNotice of General Meeting
7th Jan 20157:00 amPRNInvestor Presentation
28th Nov 20147:00 amPRNInvestor Presentation
20th Nov 20147:00 amPRNTangiers Wins Bid for Strategic Project
29th Oct 201412:38 pmPRNStatement re Share Price
29th Oct 20147:00 amPRNSignificant Shareholders
24th Oct 20149:39 amPRNChange in Directors Interest Notice x 3
23rd Oct 20147:00 amPRNQuarterly Report September 2014
22nd Oct 20148:41 amPRNIssue of Equity
22nd Oct 20147:00 amPRNCleansing Prospectus
20th Oct 20147:00 amPRNResult of Meeting
24th Sep 20148:30 amRNSRestoration - Tangiers Petroleum Limited
24th Sep 20147:00 amPRNTAO-1 Financial Position Update & Placement
24th Sep 20147:00 amPRNHalf-yearly Report
19th Sep 20147:00 amPRNNotice of EGM & Proposed Capital Raising
17th Sep 20147:00 amPRNStatement re Suspension
15th Sep 20147:00 amPRNDelay in Lodging Half-Yearly Accounts
8th Sep 20147:00 amPRNStatement re Suspension
1st Sep 20147:00 amPRNCompany Secretary Change
12th Aug 20147:44 amPRNOngoing Suspension of Securities
6th Aug 20147:51 amPRNSuspension of Securities
6th Aug 20147:30 amRNSSuspension - Tangiers Petroleum Limited
4th Aug 20148:50 amRNSRestoration - Tangiers Petroleum Ltd
4th Aug 20148:24 amPRNTAO-1 Unsuccessful
31st Jul 20147:30 amRNSSuspension - Tangiers Petroleum Limited
31st Jul 20147:07 amPRNRequest for Trading Halt
28th Jul 20144:40 pmRNSSecond Price Monitoring Extn
28th Jul 20144:35 pmRNSPrice Monitoring Extension
28th Jul 20147:00 amPRNTAO-1 Operational Update
23rd Jul 20147:00 amPRNQuarterly Report June 2014
21st Jul 20147:37 amPRNUnlisted Options
14th Jul 20147:00 amPRNTAO-1 Operational Update
11th Jul 20147:00 amPRNIssue of Equity
2nd Jul 20147:00 amPRNIssue of Equity
26th Jun 201411:26 amPRNDrilling Commences at TAO-1 Well
26th Jun 20147:00 amPRNIssue of Equity
20th Jun 20147:00 amPRNIssue of Equity
18th Jun 201410:09 amPRNIssue of Equity
17th Jun 20147:00 amPRNChange of Director's Interest Notice – Clarification
16th Jun 20147:00 amPRNChange of Director's Interest Notice - Clarification
16th Jun 20147:00 amPRNChange of Director's Interest Notice - Clarification
13th Jun 20148:53 amPRNResignation of Joint Company Secretary
13th Jun 20147:00 amPRNCleansing Prospectus
13th Jun 20147:00 amPRNChange of Director's Interest Notice
13th Jun 20147:00 amPRNIssue of Equity
13th Jun 20147:00 amPRNChange of Director's Interest Notice
13th Jun 20147:00 amPRNChange of Director's Interest Notice
12th Jun 20147:26 amPRNResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.