RE: Second mill around Kefi´s Tulu Kapi mill16 Jun 2026 07:17
The second mill will be in my opinion in a factory next to the one being built this year. It makes sense because the electric connection is there, the waste and tailings are there. The feed stock is there. It will allow the lower grade to run that would be otherwise waste and will increase the capacity of the mine. Environmentally it's a no brainer. Economically it's a no brainer. They could increase production 80% or so by spending another 25 or 30% of the build cost of TK.
I suspect they will add a second mill once the mine is up and running, generating cash. Although much depends on the price of gold and what they find underground.
Of course they won't commit to it until they have the information following drilling. The idea though is to end this notion that TK is a 7 year 1m oz reserve. It's a much bigger resource, and just because it's not in the bankable DFS doesn't mean it won't be run
TK will be at least 3m oz