Multiple stacked targets20 Dec 2020 14:12
Perseverance #1 will be drilled in 518 m (1,700 ft) of water to a TD of 4,822 m (15,820 ft), but this could be extended to 5,600 m (18,372 ft) in order to assess multiple reservoir horizons throughout the entire stratigraphic column below the Tertiary cover. Therefore, if we are drilling after 45 days, I will take this as a huge positive. We will only drill deeper if we hit oil on the way!!!
So the SP could really start to motor from the beginning of February.
GL :)