RE: Interview17 Apr 2022 20:29
Many thanks for the 2 links niky - The Spanish turbine blades were apparently some 4 years in testing which was news to me. EDF has been testing, I think, for a couple of years now so we're still some way. Covid probably slowed down both of them. However as we appear to be testing for both steam with EDF and selling gas to Spain we therefore have a foot in both turbine camps and this could be a faster growth potential than aerospace! I think the revenue will be broken down in reports so the figures will be interesting. Cheers.