RE: Managing expectations19 Aug 2018 15:39
We have seen perf guns, and as per my 9 day prediction. 9 days from the pump being removed to the new one going on, near as damn it.
So it took about 4 days at the start of this EWT to pump the stuff out of the well to clean oil.
So it could take that long again, or.... Be quicker with better flow and a bigger pump...
I would expect to see a hydro-clense tanker or two taking the well waste. (Brine and oil)
Then...
I wonder if the extra perforated area would make this (Portland ) flow on its own??.
We appeared to be so close to that point before extra perforations, with the flare stack working when the pump was locked down.
The next two weeks could see the Portland free flow and set a good 96 hour test. Watch the pump and flare.
.... Monday could be a bit if a scramble for shares....