RE: Well bore preparations are being finalised9 Mar 2024 10:41
It was posted on 27th, 5 days of pre tests then Flow test was to start on 4th March not 11th.
You are suggesting that the pre tests, BOP etc, would take 13 days then the Flow test would start, but that's not what was stated. 4-5 days pre test, then flow test, 10 days to complete 1st, then a further 10 to complete the 2nd.
I'm only going by their timetable, its not my timetable.