Volkswagen and BP join to rollout fast-charging network29 Apr 2022 10:42
Volkswagen and BP have joined forces to build a fast-charging network across Europe by 2024.
Volkswagen’s Flexpole 150kW charging units, each of which feature two charge points, have an integrated battery storage system.
The integrated battery storage system will help overcome one of the biggest obstacles to the rapid roll-out of fast charging infrastructure in Europe today - the need for high-powered grid connections, says Volkswagen.
The Flexpole units can be directly connected to a low voltage grid which removes the requirement for a dedicated substation and costly construction work, reducing installation times while still providing fast charging speeds of up to 150kW, enough to deliver up to 160km (100 miles) of driving in as little as 10 minutes, depending on the model of electric vehicle (EV).
https://www.fleetnews.co.uk/news/latest-fleet-news/electric-fleet-news/2022/04/29/volkswagen-and-bp-join-forces-to-rollout-fast-charging-network