Key dates25 Jul 2014 20:23
On the subject of key dates, Bashkol could be the first to start news flow, considering enabling works started in May 2014 and the summer plan is fully approved, that aside there is a number of other projects due news flow mid to late Summer......DYOR......GL S
Example....
The Bashkol Licence
Kentor holds the Bashkol Licence, the principal terms of which are as follows:
Asset
Holder
Interest (%)
Status
Licence Expiry Date
Licence Area
Bashkol Licence
Kentor
100
Exploration licence - gold
31 December 2017
18,000 hectares
The Bashkol Licence was initially granted by SAGMR on 28 January 2008. The current licensing terms are set out in the Licence Attachment No. 5 dated 29 April 2013.
Under the Bashkol Licence, Kentor must, amongst other things, comply with official requirements as to conduct of exploration operations; prepare and submit to SAGMR an annual work programme; submit required semi-annual and annual reports; and establish a reclamations account and make the required contributions to it. The Bashkol Licence sets out certain minimum exploration work programme items and financial commitments, subject to adjustment to take account of geological results.
The Bashkol Licence area is located in the east of the Kyrgyz Republic, lying approximately 340km east of Bishkek. The tenement lies on strike to Toronto Stock Exchange listed Centerra Gold's large Kumtor gold mine, which lies approximately 50km to the west of Bashkol.
The licence area is almost devoid of population being frequented by nomadic herdsmen in the summer months. No villages are located in the surrounding area.
The licence is located at an elevation ranging from 3,180-4,080m, with the elevation of the main prospect at Bekbulaktor up to 3,780m.
A major opportunity has been identified within the Bashkol Licence area at the Bekbulaktor prospect where surface channel sampling returned up to 14.07g/t Au over 12m. Other significant results include 4.9g/t Au over 13m, 2.65g/t Au over 37m, 2.54g/t Au over 20m and 2.83g/t Au over 11.5m. An initial scouting drill hole intersected minor mineralisation, however, the area requires further mapping, geophysics and drilling.
Kentor Farm-in Agreement and work programme
The Bashkol Licence is the subject of an agreement with KGL whereby the Group can earn 51% in Kentor, and hence the Bashkol project, by spending Australian $2 million prior to 31 December 2017. In addition, the licence conditions require that 8,000m be drilled prior to the end of 2017. The Group can earn-in a further 19% by expending Australian $5 million prior to 31 December 2021.Exploration activity planned at Bashkol will commence with the completion of the road to access the southern zone of the Bekbulaktor prospect. Seven exploration holes and selected channel sampling are planned for the Bekbulaktor prospect during in the summer of 2014. SAGMR has approved the work program for 2014 and mobilisation commenced i