RE: Meygen Q1 Output23 Apr 2023 22:35
Another RNS from Sept 2022 giving the time that 4 turbine should be in the water.
-------------------------
London South East
Dave Harbage blog: Scrutinising investment trusts - The search for value continues, via Private Equity. Read his latest entry here.
Share PricesSimec Atlantis Share PriceSimec Atlantis Regulatory NewsTidal turbine re-deployment at MeyGen site
Pin to quick picksSimec Atlantis Regulatory News (SAE)
SAE Share Price
SAE Share
Price
SAE Share News
SAE Share
News
SAE Share Chat
SAE Share
Chat
11
SAE Share Trades
SAE Share
Trades
20
SAE Live RNS
SAE
Live RNS
SAE Information Buy SAE SharesBuy SAE SharesAdd SAE to WatchlistAdd SAE to WatchlistAdd SAE to AlertAdd SAE to AlertAdd SAE to myTerminalAdd SAE to myTerminal
Share Price Information for Simec Atlantis (SAE)
London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price:
1.15
Change:
0.00 (0.00%)
SAE Live PriceLast checked at 16:33:14
Tidal turbine re-deployment at MeyGen site
Fri, 23rd Sep 2022 10:37
RNS Number : 4724A
SIMEC Atlantis Energy Limited
23 September 2022
RNS
23 September 2022
SIMEC ATLANTIS ENERGY LIMITED ("SAE", the "Company" and, together with its subsidiaries, the "Group")
Tidal energy momentum builds with the latest re-deployment at MeyGen site
SAE is pleased to announce the latest turbine re-deployment at its MeyGen site. The successful re-deployment of the 1.5MW turbine is another critical step in returning the Phase 1 array to full power and demonstrating tidal technology at commercial scale.
With the latest turbine now back in the water, and the AR1500 re-deployed in March continuing to exceed expectations, SAE is confident that the MeyGen site will continue to break records for tidal generation. The site has already produced c.75% of the global tidal stream generation to date.
With 3 turbines now fully operational, SAE remains on schedule to re-deploy the final turbine in March 2023. The turbine is being retrofitted with a wet-mate connection system, which more than halves the cost of future operation and maintenance deployments.
SAE is focusing its efforts on the delivery of the next phase of the MeyGen project, 28MW of tidal power. This project is a world leader and will unlock the technology for large-scale, commercial deployment around the world. The site can deliver a 400MW green and predictable power station.
----------------------
This is now nearly a month behind plan unless I have missed something?