RE: PANR Re-treads16 Apr 2024 18:53
The RNS says second half of this year.
"88 Energy now plans to undertake post-test studies, including fluid testing to characterise reservoir fluids, and downhole pressure and temperature data analysis to determine reservoir properties, at distances beyond the depth of investigation of the wireline logs. These studies will then be integrated into existing data sets and models to refine appraisal and development plans for each reservoir, with pre-FEED studies expected to commence during 2H 2024."