RE: As I said before . This equates to £20-£40 million a year19 Apr 2024 08:59
The well was cleaned-up and flowed for 84 hours in total under nitrogen lift, with ~68 hours of clean up prior to the flowing of oil to surface, with the well flowing oil over ~16 hour period.
· The well produced at an average oil cut of 4% following initial oil to surface, with instantaneous rates observed during the 16-hour period varying as the well continued to clean up at managed fluid flow rate of ~170 bbls/d with a calculated total volume during the flow back period following establishment of oil cut of ~4 bbls of oil.The SMD-B test produced at a calculated peak flow rate of ~50 bopd, which was an instantaneous rate calculated during the flow back period via a measurement of observed oil cut and fluid flow rates.