2 Vertical sections31 Oct 2019 08:36
"The well will be drilled in two vertical sections, using the Petreven H-205 rig, to a Total Measured Depth of approximately 2,600 metres and a core will be cut over the primary target and a full suite of logs taken over all intervals of interest."
How will that be done?
One section on top of the other?