We would love to hear your thoughts about our site and services, please take our survey here.
Nice...
Recovering millions for victims of fraud and unfair practices
“Michael is a tenacious and highly respected litigator who brings a wealth of experience to Setfords’ commercial team,” said co-CEO Guy Setford. “His services will allow a range of clients to recover losses, and pursue justice where they have faced unfair and even fraudulent practices from financial service providers.”
It is difficult to see the pictures unless you have a Facebook account.
I do not... But these slides are pinned in the TG group.
They clearly mention the Valaris 247 rig,
MODU Schedule Valaris 247
Contracted by INPEX
Third slot taken by ENI
EOG commitment pending EIA approval
Subsequent slot available to SundaGas
Limited availability but working with Valaris brings cost savings but operational constraints.
Picture show of the 5 locations the rig is booked to visit.
* Sites 1 and 2 INPEX (both sites just north of ENI "Blacktip" location. (90 days from May 2024)
* Site 3 is ENIs Blacktip locations (60 days August 2024)
* Site 4 Just to the South of Eni Blacktip (Exploration) 60 days 9October 2024)
* Site 5 SundaGas CHUDDITCH. (December 2024 40 days)
It is my view that Site no4 has not been booked yet.
Is there the prospect that Baron could take slot number 4 if we reserve the rig. Now with our Farm up partner involved getting finance may be a bit easier than before.
Now where to get £2.5 million to reserve THAT rig......hmmm
On the drilling, my belief was that BoD were targeting the free slot on Valaris 247 drill rig.
You raised the PVD link some time ago, at first I did not give it much credence, BUT maybe Horta might be happy with TL supporting only off shore exploration, and not going for expensive onshore integration. (The wealth will come much sooner imv.)
In either case, we would need to book a free slot, on "A" rig...
https://s23.q4cdn.com/956522167/files/doc_downloads/fleet-status-report/2024/02152024-Fleet-Status-Report_FINAL.pdf
On Page 1 and page 5 of the attached, you can see that the rig being refurbished in Scotland currently, and will be towed to Australian waters later in the year to support and "Undisclosed contract from June to September 24 then ENI use it until November (Area P??) then BOIL is being pencilled in after that.
The BoD are wanting to buddy up in order to reduce the total cost. It would make sense to buddy up with ENI.
Is this why the urgent raise was needed, so that they can reserve this Rig.
Do we know the availability of the PVD fleet....
The clue is in the gas produced along side the oil....
99% of the gas produced (75kMcf) was "Gathered" and successfully reinjected. Little flaring is happening.
System seems to work as it should.
Lets not forget Arts hand in ALL of this...
As for, less water this month? Well the tears have dried, but the "collective" resolve to get to the truth has hardened....
PS the field produced 30k barrels of oil....hmmmm