RE: Why is this not a positive move ?19 Feb 2024 21:54
Is this not a positive move?
Discussions with rig owners
(Can now get more serious as BoD have enough to "reserve" a rig...)
· Identifying potential logistical synergies with regional operators.
(What is known is a spare slot on Valaris 247 rig which is in the area servicing INEPEX and then ENI. (Area P??) Rig becomes available from November if not before....)
· Progressing the environmental approvals process.
(Good, get cracking. What's taking so long....)
· Preparing to conduct a site survey at the proposed Chuditch-2 appraisal well location.
(Thought we had done that to death at gazillion pixel quality...ffs) (They may discover the drill site is 100% wet!!!)
· Commencing the procurement process for long lead items.
(Fresh Sherpas with Champagne)
· Updating of the well design and costs.
(Getting advantageously cheaper if we book, NOW!!!)
· Recruiting for key posts, including Well Operations, Health, Safety and Environmental and Procurement.
(Sounds like progress)
Is something about to happen!!