RE: Constrained to 500 bopd3 Nov 2021 19:45
500 is not a planning constraint - or at least those that have claimed it is have never been able to provide the documentary evidence - and I have found no mention of it in any of the planning documents used in the Appeal. The traffic management plan did seem to have been calculated on the working hypothesis of 3 tankers a day, so that would be 600-700 bopd, but don’t think increasing it by a couple a day would be a planning issue to be considered by committee, if it needed any formal notification at all. Think it’s just a technical issue - if the equipment was designed to handle 500 bopd, flows at 70%plus higher than this might take it out of spec. for longer term production.