RE: 11.30am RNS just out ALBA and UKOG3 Aug 2018 12:35
"These latest positive Portland results continue to build on the Portland tests conducted in 2016. It should be stressed, however, that these short-term, high rate test results are not the long-term sustainable rates of production from the well on which the assessment of commerciality will be based and that Portland testing operations are continuing. Following the completion of the Portland test programme, the Operator will move directly onto the long-term Kimmeridge test programme, with the objective being to establish the commerciality of the Kimmeridge Limestone 3 & 4 oil pools. We look forward to providing further updates on progress as we move through the programme."