RE: RNS18 Apr 2024 12:42
This is in line with results demonstrated at the Tanumbirini well (0.51 – 0.56 psi/ft), providing confidence on the ability to replicate or exceed the commercial flow rates achieved at the Tanumbirini location. Stimulation activities which included 10 stimulation stages within the Amungee Member B-shale over a 500-metre horizontal section was completed on 7 December 2023.
In February 2024, the Company announced that the SS1H well achieved an average 30-day initial production (IP30) flow rate of 3.2 million cubic feet per day (MMcf/d) over the 1,644-foot (501 metres), 10 stage stimulated length within the Amungee Member B-Shale, normalised to 6.4 MMcf/d over 3,281-feet (1,000 metres), significantly exceeding pre-drill expectations and achieving what Falcon and its partners believe to be above the commercial threshold required to progress the Beetaloo to the Pilot development during 2024, subject to funding and key stakeholder approvals.
In March 2024, Falcon announced that it had elected to reduce its working interest in the proposed Pilot project from 22.5% to 5%, optimising its interest in the Beetaloo, since Falcon will only have to pay for 5% of the costs of the two wells to be drilled in 2024 as part of the Pilot development, but still retaining a weighted average 10% working interest in the enlarged area of circa 72,000 acres around the Pilot and a 22.5% working interest in the remaining 4.6 million acres (together, the “Remaining Area”). Shortly thereafter, the Company announced that the SS1H well achieved an average 60-day initial production (IP60) flow rate of 3.0 million cubic feet per day (MMcf/d) over the 1,644-foot (501 metres), 10 stage stimulated length within the Amungee Member B-Shale, normalised to 6.0 MMcf/d over 3,281-feet (1,000 metres).
Reasons for the Fundraising
The estimated gross capex for work to be carried out on the Pilot development and other Beetaloo related costs in 2024 is c.US$82 million. Under the terms of the Farm-out Agreement, Falcon’s net cash contribution is estimated at c.US$9 million, including contingency.
The net proceeds of the Fundraising, together with the Company’s existing cash resources of c.US$4.3 million, the balance of Falcon’s net carry of A$3.75m due from Tamboran and the consideration payable in respect of the grant of the ORRIs, if finalised, will primarily be used to fund Falcon’s share of estimated capital expenditure in respect of the work to be carried out on the Pilot development in 2024, including the drilling of two wells and the stimulation and flow test of two wells in the Beetaloo Sub-Basin, Australia and other related Beetaloo costs. The net proceeds will also enable Falcon to fund its share of the cost of the planned 330km2 of 3D seismic survey around the Pilot area, which it is expected will be acquired during Q4 24 with processed results being available by Q1 25