RE: nexens scott platform15 Feb 2018 14:43
A selfish point of view to this news is that the drilling beds on the platform are freed up for the PMG Tie-back. Will require (minimum) riser, chemical injection, hydraulics, isolation valves subsea, DCS upgrades and some pipework/valve mods topside. That will require quite a few bodies and if the Scott is like everywhere else then beds are at a premium.