Back to planet earth1 May 2026 13:50
This was a post from yesterday
The Derrick is "Clean" (The Biggest Signal)
April 27 (Left): If you look closely at the derrick (the tall tower), you can see vertical lines/shadows inside the framework. This indicates "pipe in the derrick"βmeaning the tubing or the perforation tools were still being moved in and out of the hole. This is the Active Work phase.
April 30 (Right): The derrick is now "stripped" or "clean." There is no pipe standing in the tower.
The Expert Meaning: The "Downhole" work is finished. They have fired the charges, stimulated the well, and pulled the tools out. The well is now "live" and either flowing or shut-in for its pressure test. The hard part is over.
Can someone, with much more technical knowledge of Helium and the EWT answer 1 question,
Will the next RNS, hopefully next week be most likely be [A] or [B]
[A] Testing complete and all went as planned, we await results from the lab
Or
[B]The results are .....
.... 9% Helium concentrations π
So will we get an RNS first stating testing is complete BEFORE results
Thanks in advance